Upload Button Icon Add office photos

Filter interviews by

Doha Petroleum Construction Company Interview Questions, Process, and Tips

Updated 18 Jul 2024

Top Doha Petroleum Construction Company Interview Questions and Answers

View all 12 questions

Doha Petroleum Construction Company Interview Experiences

Popular Designations

20 interviews found

Electrician Interview Questions & Answers

user image Anonymous

posted on 18 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What's the role of electrical technician
  • Ans. 

    Electrical technicians are responsible for installing, maintaining, and repairing electrical systems and equipment.

    • Installing electrical systems in new construction projects

    • Maintaining electrical equipment to ensure proper functioning

    • Repairing electrical systems in case of malfunctions

    • Troubleshooting electrical issues to identify root causes

    • Following safety protocols and regulations to prevent accidents

    • Collaborating wi

  • Answered by AI
  • Q2. Maintenance and install

Electrician Interview Questions asked at other Companies

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and DOL starter control wireing. 3. How to connect star connection, and DELTA connectin. 4. What is the kw of 30hp motor ?, 5. Can you connect a temperature controller ?, 6. What... read more
View answer (5)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. All the related questions in instrumentation
  • Q2. Calibration mathead
  • Q3. The calibration mathead is following formula AI AO and. DI Do

Interview Preparation Tips

Interview preparation tips for other job seekers - Study for calibration Loop check and same filed work

Instrumentation Technician Interview Questions asked at other Companies

Q1. What kind of precautions need in Plant running time?
View answer (1)
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Galending tarmntion motar megring commissioning. Vfd
  • Q2. Commissioning. Vfd motar galanding tarmntion

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir
I'm afzal Mallick electrical technician 10 years gulf experience 3 time shut down experience ecnr passport holder diploma electrical engineering. Phon, XXXXX

Electrical Maintenance Technician Interview Questions asked at other Companies

Q1. What is transformer? How many types of transformer, nd works, construction
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Work related ,grending, drawing, progress
  • Q2. I know everything, cutting, grending, drawing etc
  • Q3. Special drawing knowledge and grending experience is must

Interview Preparation Tips

Interview preparation tips for other job seekers - Fully ready for interview, work related knowledge is must

Pipe Fabricator Interview Questions asked at other Companies

Q1. How are the dimensions of the elbow of unknown degree calculated?
View answer (1)

Doha Petroleum Construction Company interview questions for popular designations

 Fabrication Supervisor

 (2)

 Civil Supervisor

 (1)

 Cost Control Engineer

 (1)

 Electrical Maintenance Technician

 (1)

 Electrician

 (1)

 Instrumentation Technician

 (1)

 Lead Safety Officer

 (1)

 Mechanical Maintenance Fitter

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Not Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Why this company?
  • Q2. How does this job fit your qualifications and skills?
  • Q3. Describe the toughest challenge you have in your life.
  • Q4. A piece you have prepared, talk about it.
  • Q5. Mention a situation with a bad member in your group

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn about communication skills and find out yourself.

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

I applied via Company Website and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(14 Questions)

  • Q1. Mechanical fittar dopet
  • Q2. Oll mentanash mecenical
  • Q3. Petrol rabic saudi job
  • Q4. Office work in good work
  • Q5. Onesh mecenical fittar
  • Q6. Me good Hed May tim job
  • Q7. Dopet construction is weri good
  • Q8. Is job weri performance
  • Q9. Dopet construction is good
  • Q10. Please one time mitting
  • Q11. Oll spenar bendig gascet jeting testing
  • Q12. Oill gas and aesid aecsenjar to work
  • Q13. Petrol rabic company is work
  • Q14. 5yars oll time working

Interview Preparation Tips

Topics to prepare for Doha Petroleum Construction Company Mechanical Maintenance Fitter interview:
  • Mecenical fittar
Interview preparation tips for other job seekers - Dir.sir. may name is bhavesh
Weri good mecenical fittar
And once please sir may drim dopet

Mechanical Maintenance Fitter Interview Questions asked at other Companies

Q1. What is the first rule on any industrial zone or sector?
View answer (3)

QC Inspector Interview Questions & Answers

user image Anonymous

posted on 6 Mar 2023

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself and experience summary
  • Q2. Past experiences in oil & ga

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare as usual interviews and salary package will be very low compared to other oil & gas companies.

QC Inspector Interview Questions asked at other Companies

Q1. What is inspected you before during and after welding ?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About myself and carrier history
Round 2 - Group Discussion 

Regarding Scaffolding Knowledge & Offshore Safety

Round 3 - Technical 

(1 Question)

  • Q1. Regarding Types of scaffolding

Scaffolding Superintendent Interview Questions asked at other Companies

Q1. What is JMS? How is it prepared?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Interviewed by immediate senior, approximate 35 minute
Round 3 - Technical 

(1 Question)

  • Q1. Technical round by Company representative
Round 4 - One-on-one 

(1 Question)

  • Q1. Interviewed by General Manager of Company
Round 5 - Group Discussion 

Group interview by Operation manager and team

Senior Construction Manager Interview Questions asked at other Companies

Q1. What is the construction cost per sqm/sft for a commercial complex
View answer (1)

I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Oil and gas Offshore related hazards and evacuations ?
  • Ans. 

    Oil and gas offshore operations pose various hazards and require effective evacuation procedures.

    • Offshore drilling platforms are exposed to risks such as blowouts, fires, explosions, and structural failures.

    • Hazardous substances like oil, gas, and chemicals can lead to toxic exposures and environmental damage.

    • Evacuation plans should be in place to ensure the safety of personnel in case of emergencies.

    • Emergency response ...

  • Answered by AI
  • Q2. What you will do if person hanging on his body harness at scaffolding?
  • Ans. 

    If a person is hanging on their body harness at scaffolding, the Lead Safety Officer should take immediate action to rescue them and ensure their safety.

    • Assess the situation and call for emergency assistance

    • Attempt to lower the person to the ground using a rescue plan or equipment

    • Provide first aid or medical attention if necessary

    • Investigate the incident to determine the cause and prevent future occurrences

  • Answered by AI
  • Q3. Parameters of gas detectors types of gas detectors/
  • Ans. 

    Gas detectors are devices used to detect the presence of gases in the environment.

    • Gas detectors can be categorized into two main types: fixed gas detectors and portable gas detectors.

    • Fixed gas detectors are permanently installed in a specific location to continuously monitor for the presence of gases.

    • Portable gas detectors are handheld devices that can be carried around to detect gases in different areas.

    • Gas detectors ...

  • Answered by AI
  • Q4. How to improve backlog of KPI system at work site?
  • Ans. 

    To improve backlog of KPI system at work site, prioritize KPIs, automate data collection, and establish regular reporting.

    • Prioritize KPIs based on their impact on safety and health

    • Automate data collection to reduce manual errors and save time

    • Establish regular reporting to track progress and identify areas for improvement

  • Answered by AI
  • Q5. Through training and awareness to work force, reporting and rectifying all near miss and other safety observations conducting mass site audits and tool box talks etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be bold and confidence with good communication skill also use some technical knowledge on safety which gives more advantage to grab the opportunity

Lead Safety Officer Interview Questions asked at other Companies

Q1. What you will do if person hanging on his body harness at scaffolding?
View answer (2)

Doha Petroleum Construction Company Interview FAQs

How many rounds are there in Doha Petroleum Construction Company interview?
Doha Petroleum Construction Company interview process usually has 2-3 rounds. The most common rounds in the Doha Petroleum Construction Company interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Doha Petroleum Construction Company interview?

Some of the top questions asked at the Doha Petroleum Construction Company interview -

  1. What you will do if person hanging on his body harness at scaffoldin...read more
  2. Oil and gas Offshore related hazards and evacuation...read more
  3. What is permit to work syste...read more

Tell us how to improve this page.

Doha Petroleum Construction Company Interview Process

based on 16 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 421 Interviews
Adani Group Interview Questions
3.9
 • 182 Interviews
Bharat Petroleum Interview Questions
4.2
 • 155 Interviews
GAIL Interview Questions
4.4
 • 78 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Doha Petroleum Construction Company Reviews and Ratings

based on 254 reviews

3.9/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.4

Salary

4.0

Job security

3.6

Company culture

3.0

Promotions

3.9

Work satisfaction

Explore 254 Reviews and Ratings
HSE Officer
29 salaries
unlock blur

₹10 L/yr - ₹18.5 L/yr

Mechanical Technician
19 salaries
unlock blur

₹0.8 L/yr - ₹6 L/yr

Instrumentation Technician
16 salaries
unlock blur

₹7.2 L/yr - ₹13 L/yr

Mechanical Engineer
12 salaries
unlock blur

₹7.8 L/yr - ₹9 L/yr

Project Engineer
11 salaries
unlock blur

₹10 L/yr - ₹32.4 L/yr

Explore more salaries
Compare Doha Petroleum Construction Company with

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.3
Compare

Essar Group

3.8
Compare

Reliance Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview