Doha Petroleum Construction Company Mechanical Maintenance Fitter Interview Questions and Answers

Updated 4 Aug 2022

Doha Petroleum Construction Company Mechanical Maintenance Fitter Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(14 Questions)

  • Q1. Mechanical fittar dopet
  • Q2. Oll mentanash mecenical
  • Q3. Petrol rabic saudi job
  • Q4. Office work in good work
  • Q5. Onesh mecenical fittar
  • Q6. Me good Hed May tim job
  • Q7. Dopet construction is weri good
  • Q8. Is job weri performance
  • Q9. Dopet construction is good
  • Q10. Please one time mitting
  • Q11. Oll spenar bendig gascet jeting testing
  • Q12. Oill gas and aesid aecsenjar to work
  • Q13. Petrol rabic company is work
  • Q14. 5yars oll time working

Interview Preparation Tips

Topics to prepare for Doha Petroleum Construction Company Mechanical Maintenance Fitter interview:
  • Mecenical fittar
Interview preparation tips for other job seekers - Dir.sir. may name is bhavesh
Weri good mecenical fittar
And once please sir may drim dopet

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Pump maintenance and check
  • Q2. Compressor disassembly and assembly work
  • Q3. Turbine checking
  • Q4. Cooling Tower gear box
  • Q5. Fire pump house and maintain

Interview Preparation Tips

Interview preparation tips for other job seekers - No

I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is the centrifugal pump internal part.
  • Ans. 

    The internal parts of a centrifugal pump include impeller, casing, shaft, bearings, and seals.

    • Impeller is the rotating component that imparts energy to the fluid.

    • Casing is the stationary component that encloses the impeller and directs the flow of fluid.

    • Shaft connects the impeller to the motor and transmits power.

    • Bearings support the shaft and reduce friction.

    • Seals prevent leakage of fluid along the shaft.

    • Other interna...

  • Answered by AI
  • Q2. Why in a centrifugal pump alignment dial gauge using.
  • Ans. 

    Centrifugal pump alignment dial gauge is used to ensure proper alignment of the pump shaft and motor shaft.

    • Dial gauge helps in measuring the misalignment between the pump and motor shafts.

    • It ensures that the pump operates smoothly and efficiently.

    • Misalignment can cause vibration, noise, and premature wear and tear of the pump components.

    • Dial gauge readings are used to adjust the pump and motor positions for proper alig...

  • Answered by AI
  • Q3. What is the safety, In a plant.
  • Ans. 

    Safety in a plant refers to the measures taken to prevent accidents and injuries to workers and damage to equipment.

    • Safety protocols and procedures should be established and followed strictly

    • Workers should be trained on safety measures and provided with appropriate safety gear

    • Regular maintenance and inspection of equipment and machinery

    • Emergency response plans should be in place and practiced

    • Regular safety audits and a...

  • Answered by AI
  • Q4. What is the cooling tower purpose.
  • Ans. 

    Cooling tower is used to remove heat from the water-cooled system and release it into the atmosphere.

    • It is used in industries to cool down the water used in various processes.

    • It works on the principle of evaporation.

    • It helps in conserving water by recycling it.

    • It is commonly used in power plants, chemical plants, and oil refineries.

    • The tower is designed to maximize the contact between air and water to facilitate heat t

  • Answered by AI
  • Q5. What is the centrifugal extranal part name.
  • Ans. 

    The centrifugal external part is called impeller.

    • The impeller is the rotating component of a centrifugal pump.

    • It is responsible for transferring energy from the motor to the fluid being pumped.

    • Examples of centrifugal pumps that use impellers include water pumps, chemical pumps, and sewage pumps.

  • Answered by AI
Round 3 - Group Discussion 

100000

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job in a experience in a subject.

Doha Petroleum Construction Company Interview FAQs

How many rounds are there in Doha Petroleum Construction Company Mechanical Maintenance Fitter interview?
Doha Petroleum Construction Company interview process usually has 1 rounds. The most common rounds in the Doha Petroleum Construction Company interview process are Technical.
What are the top questions asked in Doha Petroleum Construction Company Mechanical Maintenance Fitter interview?

Some of the top questions asked at the Doha Petroleum Construction Company Mechanical Maintenance Fitter interview -

  1. Dopet construction is weri g...read more
  2. Oll spenar bendig gascet jeting test...read more
  3. Is job weri performa...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Doha Petroleum Construction Company interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 400 Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
Bharat Petroleum Interview Questions
4.2
 • 153 Interviews
Schlumberger Interview Questions
4.0
 • 134 Interviews
GAIL Interview Questions
4.5
 • 77 Interviews
ExxonMobil Interview Questions
3.8
 • 68 Interviews
View all
HSE Officer
37 salaries
unlock blur

₹10 L/yr - ₹18.5 L/yr

Mechanical Technician
19 salaries
unlock blur

₹4.7 L/yr - ₹12 L/yr

Instrumentation Technician
15 salaries
unlock blur

₹5.7 L/yr - ₹12.5 L/yr

Mechanical Engineer
12 salaries
unlock blur

₹7.8 L/yr - ₹9 L/yr

Electrical Technician
12 salaries
unlock blur

₹2.2 L/yr - ₹10 L/yr

Explore more salaries
Compare Doha Petroleum Construction Company with

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.4
Compare

Essar Group

3.8
Compare

Reliance Industries

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview