Doha Petroleum Construction Company Piping Supervisor Interview Questions and Answers

Updated 10 Jan 2023

Doha Petroleum Construction Company Piping Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Piping realeted 

(2 Questions)

  • Q1. Safety,material code,
  • Q2. Public dealing,work load, progress

Interview Preparation Tips

Topics to prepare for Doha Petroleum Construction Company Piping Supervisor interview:
  • Safety and piping realeted
  • Coding
Interview preparation tips for other job seekers - Dopet is a good company. everything is ok but salary less. Nothing any problem.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(13 Questions)

  • Q1. How much carbon percentage in Carbon Steel
  • Ans. 

    The carbon percentage in carbon steel varies from 0.05% to 2.0% depending on the grade.

    • Carbon steel is an alloy of iron and carbon.

    • The amount of carbon in carbon steel determines its strength and hardness.

    • Low carbon steel contains less than 0.3% carbon, while high carbon steel contains more than 0.6% carbon.

    • Some common grades of carbon steel and their carbon percentage are: A36 (0.26%), 1018 (0.18%), and 1045 (0.45%).

  • Answered by AI
  • Q2. What is difference between concentric and eccentric reducer
  • Ans. 

    Concentric reducers have a common centerline while eccentric reducers have an offset centerline.

    • Concentric reducers are used in vertical piping systems to prevent accumulation of air pockets.

    • Eccentric reducers are used in horizontal piping systems to prevent accumulation of solids or liquids.

    • Concentric reducers are symmetrical while eccentric reducers are not.

    • Concentric reducers are easier to manufacture and install th

  • Answered by AI
  • Q3. Which reinforcement fittings used in piping
  • Ans. 

    Reinforcement fittings are used to strengthen and support piping systems.

    • Common reinforcement fittings include tees, elbows, reducers, and couplings.

    • Telescoping fittings are used to adjust the length of piping systems.

    • Flange fittings are used to connect pipes to other equipment or structures.

    • Saddles are used to support piping systems on walls or ceilings.

    • Reinforcement fittings can be made of various materials, includin...

  • Answered by AI
  • Q4. Why elbo let used in piping
  • Ans. 

    Elbow lets change the direction of flow in piping system.

    • Elbows are used to change the direction of flow in a piping system.

    • They come in different angles such as 45°, 90° and 180°.

    • They are available in different materials such as PVC, copper, steel, etc.

    • Elbows can be welded or threaded onto the piping system.

    • They are commonly used in plumbing, HVAC, and industrial piping systems.

  • Answered by AI
  • Q5. If we have to replace bypass valve on top of vessel and plant is running, then how to replace that valve ??
  • Ans. 

    The bypass valve can be replaced by isolating the vessel, depressurizing it, and then replacing the valve.

    • Isolate the vessel by closing the inlet and outlet valves

    • Depressurize the vessel by venting the gas or liquid

    • Remove the old valve and install the new one

    • Repressurize the vessel and open the inlet and outlet valves

  • Answered by AI
  • Q6. What is Permit to work
  • Ans. 

    Permit to work is a formal written system used to control high-risk activities.

    • It is a document that outlines the work to be done and the hazards associated with it.

    • It is used to ensure that all necessary safety precautions are taken before work begins.

    • It is issued by a competent authority and must be signed by all parties involved in the work.

    • Examples include hot work permits, confined space permits, and excavation pe

  • Answered by AI
  • Q7. Tell me about yourself and your experience
  • Q8. What is isolation and how many types of isolation
  • Ans. 

    Isolation is the process of separating a system or equipment from its energy source to ensure safety during maintenance or repair.

    • Isolation involves disconnecting a system or equipment from its power source, locking it out, and tagging it to prevent accidental re-energization.

    • There are two types of isolation: electrical isolation and mechanical isolation.

    • Electrical isolation involves disconnecting the electrical supply...

  • Answered by AI
  • Q9. What is positive isolation
  • Ans. 

    Positive isolation is the process of completely isolating a section of a system to prevent any flow or transfer of material.

    • Positive isolation is achieved by using valves, blinds, or other physical barriers to completely block the flow of material.

    • It is important for safety and maintenance purposes, as it allows workers to safely perform tasks without the risk of exposure to hazardous materials.

    • Examples of positive iso...

  • Answered by AI
  • Q10. How to do positive isolation
  • Ans. 

    Positive isolation is the process of completely isolating a section of piping or equipment from the rest of the system to perform maintenance or repairs.

    • Identify the section of piping or equipment that needs to be isolated

    • Close all valves and block all lines leading to and from the section

    • Use blind flanges or spectacle blinds to physically block the section

    • Ensure that the isolation is secure and pressure tested before ...

  • Answered by AI
  • Q11. When we do nitrogen purging and why it's required
  • Ans. 

    Nitrogen purging is done to remove impurities and oxygen from pipelines before commissioning or maintenance work.

    • Nitrogen purging is done to create an inert atmosphere inside the pipeline to prevent explosions or fires.

    • It is required before commissioning or maintenance work to remove impurities and oxygen from the pipeline.

    • Nitrogen purging is also done to prevent corrosion and contamination of the pipeline.

    • It is common...

  • Answered by AI
  • Q12. What is difference between pipe and tube
  • Ans. 

    Pipes are used to transport fluids and gases, while tubes are used for structural purposes.

    • Pipes have a standardized outer diameter and wall thickness, while tubes have a standardized inner diameter and wall thickness.

    • Pipes are typically round, while tubes can be round, square, or rectangular.

    • Pipes are often used in plumbing and HVAC systems, while tubes are used in construction and engineering applications.

    • Pipes are u...

  • Answered by AI
  • Q13. Which pipe material or standard used in past experience
  • Ans. 

    I have experience working with various pipe materials and standards including carbon steel, stainless steel, and PVC.

    • I have worked with carbon steel pipes in a power plant project.

    • I have also worked with stainless steel pipes in a pharmaceutical plant project.

    • In a water treatment plant project, I have worked with PVC pipes.

    • I am familiar with ASME B31.3, API 5L, and ASTM standards for pipe materials and welding procedur

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read your resume carefully, be confident, eye contact and imagine that you knew better than them , if you don't know say I don't know , don't answer in stories , always prepare for interview as per company requirements.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Work experience, country name, types of work, manpower handling etc
  • Q2. Punjlloyd ltd ,brouge 2 project,abudhabi
  • Q3. Allkulaib int kuwait ,subiya power plant
  • Q4. Dyam punjlloyd ,saudi arabia ,satrop projects
  • Q5. Towell eng, oman orpic (srip extension projects)
Round 3 - Aptitude Test 

Manpower nhandling only

Interview Preparation Tips

Interview preparation tips for other job seekers - try a EPC company blike perrofac
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Saudi aramco engineering standards.
  • Ans. 

    Saudi Aramco Engineering Standards are guidelines and specifications used in engineering projects for Saudi Aramco.

    • Saudi Aramco Engineering Standards cover various aspects of engineering design, materials, construction, and operation.

    • These standards ensure consistency, quality, and safety in all engineering projects undertaken by Saudi Aramco.

    • Examples of areas covered by the standards include piping design, electrical ...

  • Answered by AI
  • Q2. Design related discussions
  • Q3. Safe practices in design
  • Ans. 

    Safe practices in design involve considering potential hazards, following regulations, and prioritizing safety.

    • Identify potential hazards in the design process

    • Follow industry regulations and standards for safety

    • Prioritize safety over cost or convenience

    • Regularly review and update safety protocols

    • Include safety features in the design, such as emergency shut-off valves

    • Consider environmental impact and sustainability in d

  • Answered by AI
  • Q4. Quality of deliverables
  • Ans. 

    Quality of deliverables is crucial for successful project completion.

    • Ensuring accuracy and completeness of drawings and documents

    • Adhering to project specifications and standards

    • Regularly reviewing and revising deliverables to meet client requirements

    • Seeking feedback from stakeholders to improve quality

    • Using software tools effectively to enhance deliverables

    • Maintaining clear communication with team members for consisten

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Familiarization with the clients standard and procedures

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(13 Questions)

  • Q1. How much carbon percentage in Carbon Steel
  • Ans. 

    The carbon percentage in carbon steel varies from 0.05% to 2.0% depending on the grade.

    • Carbon steel is an alloy of iron and carbon.

    • The amount of carbon in carbon steel determines its strength and hardness.

    • Low carbon steel contains less than 0.3% carbon, while high carbon steel contains more than 0.6% carbon.

    • Some common grades of carbon steel and their carbon percentage are: A36 (0.26%), 1018 (0.18%), and 1045 (0.45%).

  • Answered by AI
  • Q2. What is difference between concentric and eccentric reducer
  • Ans. 

    Concentric reducers have a common centerline while eccentric reducers have an offset centerline.

    • Concentric reducers are used in vertical piping systems to prevent accumulation of air pockets.

    • Eccentric reducers are used in horizontal piping systems to prevent accumulation of solids or liquids.

    • Concentric reducers are symmetrical while eccentric reducers are not.

    • Concentric reducers are easier to manufacture and install th

  • Answered by AI
  • Q3. Which reinforcement fittings used in piping
  • Ans. 

    Reinforcement fittings are used to strengthen and support piping systems.

    • Common reinforcement fittings include tees, elbows, reducers, and couplings.

    • Telescoping fittings are used to adjust the length of piping systems.

    • Flange fittings are used to connect pipes to other equipment or structures.

    • Saddles are used to support piping systems on walls or ceilings.

    • Reinforcement fittings can be made of various materials, includin...

  • Answered by AI
  • Q4. Why elbo let used in piping
  • Ans. 

    Elbow lets change the direction of flow in piping system.

    • Elbows are used to change the direction of flow in a piping system.

    • They come in different angles such as 45°, 90° and 180°.

    • They are available in different materials such as PVC, copper, steel, etc.

    • Elbows can be welded or threaded onto the piping system.

    • They are commonly used in plumbing, HVAC, and industrial piping systems.

  • Answered by AI
  • Q5. If we have to replace bypass valve on top of vessel and plant is running, then how to replace that valve ??
  • Ans. 

    The bypass valve can be replaced by isolating the vessel, depressurizing it, and then replacing the valve.

    • Isolate the vessel by closing the inlet and outlet valves

    • Depressurize the vessel by venting the gas or liquid

    • Remove the old valve and install the new one

    • Repressurize the vessel and open the inlet and outlet valves

  • Answered by AI
  • Q6. What is Permit to work
  • Ans. 

    Permit to work is a formal written system used to control high-risk activities.

    • It is a document that outlines the work to be done and the hazards associated with it.

    • It is used to ensure that all necessary safety precautions are taken before work begins.

    • It is issued by a competent authority and must be signed by all parties involved in the work.

    • Examples include hot work permits, confined space permits, and excavation pe

  • Answered by AI
  • Q7. Tell me about yourself and your experience
  • Q8. What is isolation and how many types of isolation
  • Ans. 

    Isolation is the process of separating a system or equipment from its energy source to ensure safety during maintenance or repair.

    • Isolation involves disconnecting a system or equipment from its power source, locking it out, and tagging it to prevent accidental re-energization.

    • There are two types of isolation: electrical isolation and mechanical isolation.

    • Electrical isolation involves disconnecting the electrical supply...

  • Answered by AI
  • Q9. What is positive isolation
  • Ans. 

    Positive isolation is the process of completely isolating a section of a system to prevent any flow or transfer of material.

    • Positive isolation is achieved by using valves, blinds, or other physical barriers to completely block the flow of material.

    • It is important for safety and maintenance purposes, as it allows workers to safely perform tasks without the risk of exposure to hazardous materials.

    • Examples of positive iso...

  • Answered by AI
  • Q10. How to do positive isolation
  • Ans. 

    Positive isolation is the process of completely isolating a section of piping or equipment from the rest of the system to perform maintenance or repairs.

    • Identify the section of piping or equipment that needs to be isolated

    • Close all valves and block all lines leading to and from the section

    • Use blind flanges or spectacle blinds to physically block the section

    • Ensure that the isolation is secure and pressure tested before ...

  • Answered by AI
  • Q11. When we do nitrogen purging and why it's required
  • Ans. 

    Nitrogen purging is done to remove impurities and oxygen from pipelines before commissioning or maintenance work.

    • Nitrogen purging is done to create an inert atmosphere inside the pipeline to prevent explosions or fires.

    • It is required before commissioning or maintenance work to remove impurities and oxygen from the pipeline.

    • Nitrogen purging is also done to prevent corrosion and contamination of the pipeline.

    • It is common...

  • Answered by AI
  • Q12. What is difference between pipe and tube
  • Ans. 

    Pipes are used to transport fluids and gases, while tubes are used for structural purposes.

    • Pipes have a standardized outer diameter and wall thickness, while tubes have a standardized inner diameter and wall thickness.

    • Pipes are typically round, while tubes can be round, square, or rectangular.

    • Pipes are often used in plumbing and HVAC systems, while tubes are used in construction and engineering applications.

    • Pipes are u...

  • Answered by AI
  • Q13. Which pipe material or standard used in past experience
  • Ans. 

    I have experience working with various pipe materials and standards including carbon steel, stainless steel, and PVC.

    • I have worked with carbon steel pipes in a power plant project.

    • I have also worked with stainless steel pipes in a pharmaceutical plant project.

    • In a water treatment plant project, I have worked with PVC pipes.

    • I am familiar with ASME B31.3, API 5L, and ASTM standards for pipe materials and welding procedur

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read your resume carefully, be confident, eye contact and imagine that you knew better than them , if you don't know say I don't know , don't answer in stories , always prepare for interview as per company requirements.

I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Group Discussion 

1. What are the jointing procedures for HDPE pipe?
2. What are the minimum distance from the Equipment's to Fire hose reel?
3. What is the test pressure for fire water pipeline?

Round 3 - Aptitude Test 

What is the reference aramco SAES standard for gaskets?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Analyzed & prepare as a Entrepreneur view of job and answer

Doha Petroleum Construction Company Interview FAQs

How many rounds are there in Doha Petroleum Construction Company Piping Supervisor interview?
Doha Petroleum Construction Company interview process usually has 2 rounds. The most common rounds in the Doha Petroleum Construction Company interview process are Resume Shortlist.
What are the top questions asked in Doha Petroleum Construction Company Piping Supervisor interview?

Some of the top questions asked at the Doha Petroleum Construction Company Piping Supervisor interview -

  1. Public dealing,work load, progr...read more
  2. Safety,material co...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Doha Petroleum Construction Company interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 400 Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
Bharat Petroleum Interview Questions
4.2
 • 153 Interviews
Schlumberger Interview Questions
4.0
 • 134 Interviews
GAIL Interview Questions
4.5
 • 77 Interviews
ExxonMobil Interview Questions
3.8
 • 68 Interviews
View all
Doha Petroleum Construction Company Piping Supervisor Salary
based on 4 salaries
₹1 L/yr - ₹1.6 L/yr
84% less than the average Piping Supervisor Salary in India
View more details

Doha Petroleum Construction Company Piping Supervisor Reviews and Ratings

based on 5 reviews

3.9/5

Rating in categories

4.0

Skill development

2.2

Work-Life balance

2.2

Salary & Benefits

4.1

Job Security

2.2

Company culture

1.4

Promotions/Appraisal

1.4

Work Satisfaction

Explore 5 Reviews and Ratings
HSE Officer
37 salaries
unlock blur

₹10 L/yr - ₹18.5 L/yr

Mechanical Technician
19 salaries
unlock blur

₹4.7 L/yr - ₹12 L/yr

Instrumentation Technician
15 salaries
unlock blur

₹5.7 L/yr - ₹12.5 L/yr

Mechanical Engineer
12 salaries
unlock blur

₹7.8 L/yr - ₹9 L/yr

Electrical Technician
12 salaries
unlock blur

₹2.2 L/yr - ₹10 L/yr

Explore more salaries
Compare Doha Petroleum Construction Company with

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.4
Compare

Essar Group

3.8
Compare

Reliance Industries

4.0
Compare

Calculate your in-hand salary