Senior Engineer Construction

Senior Engineer Construction Interview Questions and Answers

Updated 24 Jan 2025
search-icon

Q1. What you have best skil in construction feild

Ans.

My best skill in the construction field is project management.

  • Strong project planning and scheduling abilities

  • Effective communication with stakeholders

  • Proven track record of delivering projects on time and within budget

Q2. Explain the importance of water quality monitoring in JJM projects and the parameters tested

Ans.

Water quality monitoring is crucial in JJM projects to ensure safe drinking water and compliance with regulations.

  • Water quality monitoring helps in ensuring the safety of drinking water for the community.

  • It helps in identifying any potential contaminants or pollutants in the water sources.

  • Monitoring parameters include pH levels, turbidity, dissolved oxygen, total dissolved solids, and presence of bacteria like E. coli.

  • Regular monitoring ensures compliance with regulatory stan...read more

Senior Engineer Construction Interview Questions and Answers for Freshers

illustration image

Q3. What is EVM and significance of EVM

Ans.

EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.

  • EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.

  • It helps in measuring project performance against the baseline plan and identifying variances.

  • Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Performance Index (CPI), and Schedule Performance Index (SPI).

  • E...read more

Q4. What is nondestructive testing

Ans.

Nondestructive testing is a method of testing materials without causing damage to the object being tested.

  • It is used to detect flaws or defects in materials or structures

  • Common methods include ultrasonic testing, radiography, and magnetic particle testing

  • It is often used in industries such as construction, aerospace, and manufacturing

  • Nondestructive testing can help ensure the safety and reliability of structures and products

Are these interview questions helpful?

Q5. Clement consumption in M30

Ans.

Cement consumption in M30 refers to the amount of cement used in the construction of M30 grade concrete.

  • Cement consumption in M30 depends on the mix design and the required strength of the concrete.

  • The cement content in M30 grade concrete is generally between 320 to 360 kg/m3.

  • Factors such as water-cement ratio, aggregate properties, and admixtures can also affect cement consumption.

  • Higher cement content may be required for special applications or to achieve higher strength.

  • Pr...read more

Q6. How many Deadment Depth

Ans.

The deadmen depth depends on the soil type and the load-bearing capacity of the soil.

  • Deadmen depth is the depth at which deadmen are installed to anchor retaining walls or other structures.

  • It is determined by the soil type and the load-bearing capacity of the soil.

  • For example, in sandy soil, the deadmen depth may need to be deeper than in clay soil.

  • The depth can also vary depending on the height and weight of the structure being anchored.

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. Height of pouring concrete

Ans.

The height of pouring concrete depends on various factors such as the type of structure, weather conditions, and equipment used.

  • The height of pouring concrete should not exceed 1.5 meters to avoid segregation and ensure proper compaction.

  • For high-rise buildings, concrete is poured in stages, with each stage being allowed to cure before the next one is poured.

  • The use of pumps and chutes can help to pour concrete at greater heights.

  • Weather conditions such as wind and temperatur...read more

Q8. Site management plan

Ans.

A site management plan is a document that outlines how a construction project will be managed, including safety procedures, schedules, and communication protocols.

  • Site management plans should include detailed safety procedures to ensure the well-being of workers and visitors.

  • The plan should outline the schedule for the project, including milestones and deadlines.

  • Communication protocols, such as regular meetings and progress reports, should be clearly defined in the plan.

  • Site ...read more

Senior Engineer Construction Jobs

Senior Construction Engineer (Jodhpur-RJ.) 12-15 years
HYT Engineering Company Pvt. Ltd.
3.2
₹ 9 L/yr - ₹ 11 L/yr
Jodhpur
Senior Engineer construction 5-10 years
sankalp group of companies
2.9
Ahmedabad
Sr Construction Engineer - Mechanical 8-13 years
JD Manpower Consultancy
0.0
₹ 30 L/yr - ₹ 40 L/yr
Dubai
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.3
 • 77 Interviews
4.0
 • 60 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Senior Engineer Construction Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter