Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Jakson Group Team. If you also belong to the team, you can get access from here

Jakson Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Jakson Group Interview Questions, Process, and Tips

Updated 20 Feb 2025

Top Jakson Group Interview Questions and Answers

View all 53 questions

Jakson Group Interview Experiences

Popular Designations

78 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. About experience
  • Q2. General questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. About experience
  • Q2. General questions
Round 3 - One-on-one 

(2 Questions)

  • Q1. About experience
  • Q2. Job knowledge, communication and questions based on case scenario

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest.

Assistant Marketing Communication Manager Interview Questions asked at other Companies

Q1. Explain a carbon projects life cycle in terms of the CDM?
View answer (1)

Assistant Manager Interview Questions & Answers

user image Arvind Maurya

posted on 9 Jan 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Cable type and it's current rating
  • Ans. 

    Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.

    • Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)

    • Current rating is determined by factors such as conductor size, insulation material, and ambien...

  • Answered by AI
  • Q2. What were the costs and other technical parameters, such as the client and scope of work, for your last project?
  • Ans. 

    The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.

    • Client: Company A

    • Scope of work: Development of new software system

    • Cost: $100,000

    • Technical parameters: Integration with existing systems, timeline of 6 months

  • Answered by AI
  • Q3. What are the types of substations and how does a bay function within them?
  • Ans. 

    Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.

    • Types of substations include distribution substations, transmission substations, and switching substations.

    • Distribution substations typically step down voltage for local distribution to customers.

    • Transmission substations step up voltage for long-distanc...

  • Answered by AI

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Yes i am interested to HR Interview
Round 2 - Technical 

(2 Questions)

  • Q1. Yes i am also interested to TECHNICAL interview
  • Q2. Sir I tell u everything About AUTO bussing machine
Round 3 - Aptitude Test 

I am interested to Aptitude test

Interview Preparation Tips

Interview preparation tips for other job seekers - Working with M/s Jackson Engineers Ltd. (Greater Noida ) As a Bussing
Machine Operator Since May 2024 to till now.

Machine Operator Interview Questions asked at other Companies

Q1. What is mean by quality test 100 percentage give you sir
View answer (4)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was all about aptitude

Round 2 - Group Discussion 

One topic was given and total 17 students were there

Round 3 - Technical 

(3 Questions)

  • Q1. Manufacturing processes
  • Q2. Thermodynamics and quality control
  • Q3. Lean manufacturing and kaizen

Graduate Engineer Interview Questions asked at other Companies

Q1. What is Finite Element Analysis? Explain using examples.
View answer (1)

Jakson Group interview questions for popular designations

 Senior Engineer

 (7)

 Assistant Manager

 (4)

 Electrical Engineer

 (2)

 Electrical GET

 (2)

 Engineer

 (2)

 Graduate Engineer

 (2)

 ITI Electrician

 (2)

 Manager

 (2)

Senior Engineer Interview Questions & Answers

user image Devendra mehra

posted on 24 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About last working profile and current Ctc, job location
  • Q2. Notice period discussion
Round 2 - Technical 

(2 Questions)

  • Q1. Related to work profile.
  • Q2. About the devices, protocol, and about jakson working and company details.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations, offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not negotiate too much with Hr for salary, and kindly clear the job role, company reimbursement policy, and other policy's.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Get interview-ready with Top Jakson Group Interview Questions

Senior Engineer Scada commissioning Interview Questions & Answers

user image Anonymous

posted on 24 Jul 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Profile and last ctc discussion.
  • Q2. Job role, and location
Round 2 - Technical 

(1 Question)

  • Q1. About iec protocol, last working
Round 3 - HR 

(1 Question)

  • Q1. Final offer letter, salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not negotiate salary too much for getting job.
Kindly discuss clearly about job location, hr policy, reimbursement policy.

Jobs at Jakson Group

View all
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Current Salary and the location
  • Q2. Work experience
Round 2 - One-on-one 

(2 Questions)

  • Q1. Work experience
  • Q2. Technical questions related to solar

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is your currently job profiles?
  • Q2. Why do want leave this company?
Round 2 - Technical 

(3 Questions)

  • Q1. How do you maintenance planning?
  • Ans. 

    Maintenance planning involves creating a systematic approach to ensure efficient and effective maintenance activities.

    • Developing a maintenance schedule based on equipment requirements and priorities

    • Identifying and procuring necessary resources, such as spare parts and tools

    • Coordinating with other departments to minimize disruptions and downtime

    • Implementing preventive maintenance strategies to reduce breakdowns

    • Tracking ...

  • Answered by AI
  • Q2. How do deal if your employee behavior is not good?
  • Ans. 

    Addressing employee behavior issues as a Maintenance Manager

    • Identify the specific behavior that is not good

    • Have a private conversation with the employee to discuss the issue

    • Clearly communicate expectations and provide feedback on how the behavior is impacting the team or organization

    • Offer support and resources to help the employee improve

    • Implement disciplinary actions if necessary, following company policies and proced...

  • Answered by AI
  • Q3. What is Your salary?

Maintenance Manager Interview Questions asked at other Companies

Q1. Suddenly how to take design when there is no one senior are present in his/her office that time, what you to do?
View answer (16)
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About procurement
  • Q2. About previous work

Interview Preparation Tips

Interview preparation tips for other job seekers - Not good for working professional..

Senior Executive Procurement Interview Questions asked at other Companies

Q1. What is M35? What is scaffolding ?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Working Experience in electrical project
  • Ans. 

    I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.

    • Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.

    • Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.

    • Collaborated wi...

  • Answered by AI
  • Q2. Working process of project
  • Ans. 

    The working process of a project involves planning, execution, monitoring, and completion.

    • Planning phase includes defining project goals, scope, and deliverables.

    • Execution phase involves assigning tasks, managing resources, and implementing the project plan.

    • Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.

    • Completion phase involves finalizing deliverables, conducting proj

  • Answered by AI
  • Q3. From survey execution up to billing and closer
  • Ans. 

    The question is asking about the process from survey execution to billing and closure.

    • Survey execution involves designing and distributing surveys to collect data.

    • Data collected from surveys is then analyzed and processed.

    • Based on the analysis, billing is done for the services provided.

    • Finally, the project is closed, and any remaining tasks or documentation are completed.

  • Answered by AI

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Jakson Group Interview FAQs

How many rounds are there in Jakson Group interview?
Jakson Group interview process usually has 2-3 rounds. The most common rounds in the Jakson Group interview process are HR, Resume Shortlist and Technical.
How to prepare for Jakson Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Jakson Group. The most common topics and skills that interviewers at Jakson Group expect are Procurement, Sales, Compliance, Channel Sales and SAP.
What are the top questions asked in Jakson Group interview?

Some of the top questions asked at the Jakson Group interview -

  1. How many types to testing perform in transformer.(from resu...read more
  2. What were the costs and other technical parameters, such as the client and scop...read more
  3. What are the types of substations and how does a bay function within th...read more
How long is the Jakson Group interview process?

The duration of Jakson Group interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Jakson Group Interview Process

based on 101 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 430 Interviews
Thermax Limited Interview Questions
4.2
 • 247 Interviews
Adani Power Interview Questions
3.9
 • 215 Interviews
Havells Interview Questions
4.0
 • 208 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
View all

Jakson Group Reviews and Ratings

based on 1.1k reviews

4.3/5

Rating in categories

4.1

Skill development

4.1

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 1.1k Reviews and Ratings
Branch Manager

Haridwar

8-12 Yrs

Not Disclosed

Logistics Solar Professional

Greater Noida

4-6 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
222 salaries
unlock blur

₹4.7 L/yr - ₹14 L/yr

Senior Engineer
130 salaries
unlock blur

₹4 L/yr - ₹11.5 L/yr

Engineer
98 salaries
unlock blur

₹2.4 L/yr - ₹6.2 L/yr

Manager
91 salaries
unlock blur

₹6.3 L/yr - ₹22.5 L/yr

Electrical Engineer
83 salaries
unlock blur

₹2 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Jakson Group with

Sterlite Power

4.0
Compare

Tata Power

3.9
Compare

Adani Power

3.9
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview