i
Jakson Group
Filter interviews by
I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.
I am interested to Aptitude test
Top trending discussions
RFID module process involves using radio frequency identification technology to track and manage inventory or assets.
RFID module consists of a tag or label, reader, and antenna.
Tags are attached to items and contain electronically stored information.
Reader sends radio waves to the tag and reads the information stored on it.
RFID technology is commonly used in industries like retail, logistics, and manufacturing.
RFID can...
I appeared for an interview in Sep 2020.
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.
Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.
Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.
Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.
Fluorinated gases - GWP ranges from 1,000 to over 10,
EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.
1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.
2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.
3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
based on 1 interview
Interview experience
Assistant Manager
226
salaries
| ₹4.6 L/yr - ₹14 L/yr |
Senior Engineer
117
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Engineer
99
salaries
| ₹2.4 L/yr - ₹6.2 L/yr |
Manager
97
salaries
| ₹7 L/yr - ₹22.5 L/yr |
Electrical Engineer
80
salaries
| ₹2 L/yr - ₹6.2 L/yr |
Adani Power
ReNew
Adani Green Energy
Vestas