Q1. In a Case, If 12mm dia rebar in your drawing and spacing is 150 mm. In case you are not having it at that time and you have to change it with 16 mm. what would be the spacing according 16 mm dia rebar?

Ans.

Spacing for 16mm dia rebar if 12mm dia rebar is not available.

  • Calculate the area of 12mm dia rebar and 16mm dia rebar.

  • Use the ratio of areas to find the spacing for 16mm dia rebar.

  • Spacing for 16mm dia rebar would be approximately 211 mm.

  • Ensure that the new spacing meets the required design standards.

View 1 answer

Q2. What type of safety measures you follow during the construction work

Ans.

We follow strict safety protocols to ensure the well-being of workers and prevent accidents.

  • We conduct regular safety meetings to discuss potential hazards and how to avoid them.

  • We provide personal protective equipment (PPE) such as hard hats, safety glasses, and gloves.

  • We implement fall protection measures such as guardrails, safety nets, and harnesses.

  • We ensure that all equipment and machinery are properly maintained and inspected.

  • We have emergency response plans in place a...read more

Add your answer

Q3. Tell me briefly about pipeline work

Ans.

Pipeline work involves the construction, maintenance, and repair of pipelines used for transporting fluids or gases.

  • Pipeline work includes excavation, welding, coating, and testing of pipelines.

  • Construction of pipelines involves laying pipes, installing valves, and building pump stations.

  • Maintenance work includes inspecting pipelines for leaks, corrosion, and other damage.

  • Repair work involves fixing leaks, replacing damaged sections of pipeline, and upgrading existing pipelin...read more

View 3 more answers

Q4. Capacity of WTP in which you have experience

Ans.

I have experience working with WTPs with capacities ranging from 5 MGD to 50 MGD.

  • Worked on a 5 MGD WTP project in my previous role

  • Managed construction of a 20 MGD WTP in my current role

  • Assisted in the design of a 50 MGD WTP during my internship

Add your answer
Discover Xebia interview dos and don'ts from real experiences

Q5. Types of structures constructed

Ans.

Various types of structures are constructed in construction industry.

  • Residential buildings such as apartments, villas, and houses

  • Commercial buildings such as offices, shopping malls, and hotels

  • Industrial buildings such as factories and warehouses

  • Infrastructure projects such as roads, bridges, and tunnels

  • Specialized structures such as sports stadiums, hospitals, and airports

View 2 more answers

Q6. How the pipes are welded

Ans.

Pipes are welded using various techniques such as arc welding, gas welding, and electric resistance welding.

  • Arc welding involves using an electric arc to melt the edges of the pipes and then joining them together.

  • Gas welding uses a flame produced by burning a mixture of fuel gas and oxygen to heat the pipes and create a molten pool for joining.

  • Electric resistance welding passes an electric current through the pipes, generating heat and causing them to fuse together.

  • Other tech...read more

View 1 answer

Q7. How power plant work

Ans.

Power plants generate electricity by converting mechanical energy into electrical energy through various processes.

  • Power plants use fuel (such as coal, natural gas, or nuclear material) to heat water and produce steam.

  • The steam drives a turbine connected to a generator, which produces electricity.

  • There are different types of power plants including coal-fired, natural gas, nuclear, hydroelectric, and renewable energy plants.

  • Power plants require regular maintenance and monitori...read more

Add your answer

Q8. Pipe laying procedure.

Ans.

Pipe laying procedure involves planning, excavation, laying the pipe, backfilling, and testing for leaks.

  • Plan the layout of the pipes based on the project requirements and specifications.

  • Excavate the trench to the required depth and width to accommodate the pipe.

  • Lay the pipes carefully in the trench, ensuring proper alignment and slope for efficient flow.

  • Backfill the trench with suitable material to provide support and stability to the pipes.

  • Test the pipes for leaks using pre...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter