Top Down method is a construction technique used for building underground structures starting from the top surface.
Excavation of the top-down shaft
Installation of temporary support system
Construction of the basement slab
Construction of the underground levels
Installation of permanent support system
Backfilling of the excavated area
Completion of the superstructure
Examples: London Underground's Jubilee Line Extension, Delh
Soldier pile is a type of retaining wall system used in construction to provide temporary or permanent support to excavations.
Soldier pile is a vertical structural member, typically made of steel or concrete, that is installed into the ground to support the excavation.
It is commonly used in situations where deep excavations are required, such as for basements or underground parking structures.
Soldier piles are spaced a...
Top trending discussions
I applied via Company Website and was interviewed in Dec 2023. There were 3 interview rounds.
Blood relations , calendar
Write about your past
Yes technical test was conducted
I applied via Company Website and was interviewed in Dec 2023. There were 3 interview rounds.
Blood relations , calendar
Write about your past
Yes technical test was conducted
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Senior Safety Manager
3
salaries
| ₹10.4 L/yr - ₹13.8 L/yr |
TCS
Accenture
Wipro
Cognizant