Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project management is key to identifying and addressing issues in...read more
Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project, the quantity of piping was much higher, around 50,000 fe...read more
Q3. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include parameters such as turbidity, conductivity, and presence of an...read more
Q4. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1 bar is equal to 100 kPa or 0.1 MPa.
Q5. What type of Piling Mech your using previous project
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
Q6. What is the pile rig tark of Rig Mech
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
Q7. What is density of polymer,
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.