Premium Employer

i

This company page is being actively managed by Saipem Team. If you also belong to the team, you can get access from here

Saipem Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Saipem Construction Management Interview Questions and Answers

Updated 15 Feb 2023

Saipem Construction Management Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Because I am EX employees with this company.
  • Q2. When you are joining this project
  • Q3. I am ready to join Immediately.
Round 3 - Technical 

(1 Question)

  • Q1. Technical Questions.
Round 4 - es 

(2 Questions)

  • Q1. Yes, HR i asked me salary, but i Received the offer letter from GPS /Saipem and i will accept her offer kettrer .. In wall sing deportment they romped the document for 06 months unfortunately will DeMeo me...
  • Q2. They are always checking with my look ahead scheduler

Interview Preparation Tips

Interview preparation tips for other job seekers - I am EX Employer of the SAIPEM Thats why did not take an Interview.,

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Mech engineering
  • Q2. All about rotatory parts

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with all preparation
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Timing punctuality,displain .

Round 2 - HR 

(1 Question)

  • Q1. Salary and appointment letter
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Acquaintances with Minor irrigation systems
  • Ans. 

    I have experience working with minor irrigation systems, including design, installation, and maintenance.

    • Designed irrigation systems for small-scale agricultural projects

    • Installed drip irrigation systems for gardens and landscaping

    • Performed routine maintenance on irrigation pumps and pipes

    • Troubleshooted and repaired irrigation system malfunctions

  • Answered by AI
  • Q2. QA and QC related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is EVM and significance of EVM
  • Ans. 

    EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.

    • EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.

    • It helps in measuring project performance against the baseline plan and identifying variances.

    • Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Perfo...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Past Projects details to explain,

Round 3 - Technical 

(5 Questions)

  • Q1. Past Projects Technical
  • Q2. What type of Piling Mech your using previous project
  • Ans. 

    We used bored pile foundation method in our previous project.

    • Bored pile foundation method was used for piling in the previous project.

    • The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.

    • Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.

  • Answered by AI
  • Q3. What is the pile rig tark of Rig Mech
  • Ans. 

    The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.

    • Operating pile driving equipment efficiently

    • Maintaining and repairing equipment as needed

    • Ensuring safety protocols are followed during pile driving operations

  • Answered by AI
  • Q4. What is density of polymer,
  • Ans. 

    The density of a polymer refers to its mass per unit volume.

    • Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).

    • The density of a polymer can vary depending on factors such as its chemical composition and structure.

    • For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.

    • Higher density polymers tend to be more rigid and have higher melting points.

  • Answered by AI
  • Q5. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
  • Ans. 

    The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.

    • Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.

    • The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.

    • Water test details should include para...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to your cv and your work of knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - All people do hard work with full of integrity one day you will success in your dream
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding cost of project
Round 2 - HR 

(1 Question)

  • Q1. Mail came from them for a discussion

I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Prepare your self as per your CV.
  • Q2. They required deep answer of every questions.
  • Q3. Time Cycle plan also discussed for every activities done in last projects.
Round 3 - HR 

(3 Questions)

  • Q1. Salary, reason of leaving, location
  • Q2. Documents Verification
  • Q3. Medical tests done at your nearest location by company expense.

Interview Preparation Tips

Topics to prepare for L&T Construction Construction Management interview:
  • As per CV
  • Work done in last projects
Interview preparation tips for other job seekers - Keep your self ready & up to date in technical as well managerial skills also, be honest & dedicated in your every project, prepare CV as per your knowledge & interest.

Interview Questionnaire 

3 Questions

  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Ans. 

    Technical and administrative issues during construction execution and their solutions

    • Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders

    • Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting

    • Effective project...

  • Answered by AI
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Ans. 

    The quantity of piping done at our location and the total duration for completion varied depending on the project.

    • The quantity of piping done at our location ranged from project to project.

    • The total duration for completion also varied based on the size and complexity of the project.

    • For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.

    • In another project...

  • Answered by AI
  • Q3. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
  • Ans. 

    Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.

    • Units of pressure include psi, bar, kPa, and MPa.

    • Conversions between units of pressure can be done using conversion factors.

    • For example, 1

  • Answered by AI

Saipem Interview FAQs

How many rounds are there in Saipem Construction Management interview?
Saipem interview process usually has 4 rounds. The most common rounds in the Saipem interview process are Technical and Resume Shortlist.
What are the top questions asked in Saipem Construction Management interview?

Some of the top questions asked at the Saipem Construction Management interview -

  1. Yes, HR i asked me salary, but i Received the offer letter from GPS /Saipem and...read more
  2. They are always checking with my look ahead schedu...read more
  3. I am ready to join Immediate...read more

Tell us how to improve this page.

Saipem Construction Management Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Saipem Engineering for a sustainable future

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 742 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
AtkinsRealis Interview Questions
4.0
 • 86 Interviews
View all

Saipem Construction Management Reviews and Ratings

based on 3 reviews

4.8/5

Rating in categories

4.6

Skill development

4.5

Work-life balance

4.6

Salary

4.6

Job security

4.8

Company culture

4.6

Promotions

4.8

Work satisfaction

Explore 3 Reviews and Ratings
Principal Engineer
213 salaries
unlock blur

₹11 L/yr - ₹29 L/yr

Senior Principal Engineer
107 salaries
unlock blur

₹14.3 L/yr - ₹34 L/yr

Senior Engineer
94 salaries
unlock blur

₹7 L/yr - ₹19 L/yr

Piping Designer
91 salaries
unlock blur

₹5 L/yr - ₹18 L/yr

Process Engineer
50 salaries
unlock blur

₹4.2 L/yr - ₹12 L/yr

Explore more salaries
Compare Saipem with

McDermott International

4.3
Compare

TechnipFMC

4.0
Compare

Subsea 7

4.4
Compare

Baker Hughes

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview