I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
The diesel consumption for Dense Bitumen material varies depending on factors such as temperature, mix design, and equipment used.
Diesel consumption for Dense Bitumen material is typically measured in liters per ton of material produced.
Factors such as temperature of the mix, mix design, and type of equipment used can affect the diesel consumption.
For example, a higher temperature mix may require more diesel to heat th...
I have over 10 years of experience in management roles, leading teams and implementing strategic initiatives.
Managed a team of 50+ employees in a retail setting, increasing sales by 20% within one year
Implemented new customer service protocols that resulted in a 15% increase in customer satisfaction
Led cross-functional projects to streamline operations and reduce costs by 10%
Top trending discussions
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
posted on 12 Aug 2021
I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.
BTG protection refers to the safety measures taken for Boiler, Turbine, Generator, and Switchyard.
BTG protection is crucial for ensuring the safe and efficient operation of power plants.
It involves various safety measures such as fire protection, overpressure protection, and electrical protection.
Examples of BTG protection systems include fire suppression systems, pressure relief valves, and protective relays.
Regular m...
posted on 2 Apr 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 24 Jun 2021
posted on 19 Nov 2021
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Nov 2018. There were 3 interview rounds.
The prime necessity in the subject position of a Project Manager is effective communication.
Effective communication is crucial for successful project management
It ensures clear understanding of project goals, requirements, and expectations
Communication helps in building strong relationships with stakeholders
It facilitates collaboration and coordination among team members
Good communication reduces misunderstandings and ...
To manage the team effectively, establish clear communication, set expectations, provide necessary resources, and promote a positive work environment.
Establish open and transparent communication channels
Set clear expectations and goals
Provide necessary resources and support
Promote teamwork and collaboration
Recognize and reward achievements
Ensure safety protocols are followed
Regularly monitor progress and provide feedba...
posted on 24 Jun 2021
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
Testing and commissioning of TVS system involves various activities to ensure its proper functioning.
Verification of wiring and connections
Functional testing of individual components
Integration testing of the entire system
Performance testing under different load conditions
Verification of safety features
Documentation of test results and commissioning procedures
I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
91
salaries
| ₹4.2 L/yr - ₹10 L/yr |
Civil Engineer
43
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Deputy Manager
40
salaries
| ₹7 L/yr - ₹14 L/yr |
Civil Site Engineer
21
salaries
| ₹1.6 L/yr - ₹5.5 L/yr |
Plant Engineer
18
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Sterling & Wilson
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering