Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.
Earthing involves creating a connection between the electrical system and the earth.
It is done by burying a metal conductor, such as a copper rod, in the ground.
The metal conductor is connected to the electrical system using a wire or cable.
Earthing provides a path for...
The type of DGs used at our site are diesel generators.
Diesel generators are commonly used as backup power sources in various industries.
They are reliable and can provide a continuous power supply during electrical outages.
DGs are often used in remote locations or areas with unreliable grid power.
They require regular maintenance and fuel supply to operate efficiently.
Examples of DGs used at our site include Cummins, Ca
LT line refers to Low Tension line while HT line refers to High Tension line.
LT line carries low voltage and is used for domestic and small-scale commercial purposes.
HT line carries high voltage and is used for industrial and large-scale commercial purposes.
LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.
LT lines are usually overhead lines, while HT lines can be both overhead and ...
We used different types of circuit breakers at the site depending on the specific requirements.
We used air circuit breakers (ACBs) for low voltage applications.
For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).
In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.
For specialized applications like generator protection, we used differential ...
The size of transformers used at the site varied depending on the specific requirements of the project.
Transformers used at the site were of different sizes based on the power demand of the electrical system.
For smaller projects, transformers with a capacity of around 100 kVA were used.
For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.
For larger projects, transformers wit...
We used a stationary type batching plant at the site.
We used a stationary type batching plant for our construction project.
The stationary batching plant had a higher production capacity compared to mobile plants.
It was equipped with multiple storage bins for different types of aggregates.
The plant had a conveyor belt system to transfer the aggregates to the mixer.
We used this type of batching plant because it provided
Top trending discussions
posted on 30 Apr 2022
I applied via Campus Placement and was interviewed before Apr 2021. There were 4 interview rounds.
Reasoning
Apptitude
posted on 30 Dec 2023
I applied via Referral and was interviewed in Jun 2023. There were 2 interview rounds.
Overhead distribution system is a network of electrical lines and equipment used to distribute power from substations to consumers.
Overhead distribution systems consist of poles, wires, transformers, and insulators.
They are commonly used in rural areas and older urban areas.
Maintenance of overhead distribution systems includes regular inspections for damage and vegetation management.
Examples of overhead distribution sy...
posted on 12 Mar 2023
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
Basics of electrical include understanding circuits, components, and power sources. Foundations of production and maintenance work involve safety, planning, and troubleshooting.
Basics of electrical include understanding circuits, components, and power sources
Foundations of production work involve safety, planning, and quality control
Foundations of maintenance work involve safety, planning, and troubleshooting
Examples o...
posted on 6 Mar 2024
I applied via Campus Placement and was interviewed in Sep 2023. There was 1 interview round.
It's basic level of questions you don't have panic give it with positive attitude.questions are asked from time and work, coding decoding, basic verbal questions and profit loss
posted on 20 Feb 2023
I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.
Profit and loss , percentage, average, age, time and work, ratio, syllogism, series, dice, direction,mirrer image,water image,
posted on 24 Dec 2021
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
posted on 8 Apr 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
posted on 23 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
Mode of measurement refers to the standard method used to measure quantities in construction projects.
It is important to establish a clear mode of measurement to ensure consistency and accuracy in cost estimation.
Common modes of measurement include SMM7, CESMM, and NRM.
SMM7 (Standard Method of Measurement) is widely used in the UK for building works.
CESMM (Civil Engineering Standard Method of Measurement) is used for c...
Deduction as per IS code for Connecte, Shuttering & Plaster
As per IS code, deduction for connected items is 2.5% of the total quantity
For shuttering, deduction is 10% of the total surface area
For plaster, deduction is 20% of the total surface area
These deductions are made to account for wastage and overlapping
The consumption for mortar 1:3 and 1:6 ratio depends on the area to be covered and thickness of the layer.
The consumption of mortar is calculated in terms of volume.
For 1:3 ratio, the mix proportion is 1 part cement and 3 parts sand.
For 1:6 ratio, the mix proportion is 1 part cement and 6 parts sand.
The thickness of the layer also affects the consumption of mortar.
The area to be covered is calculated by multiplying the...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
89
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Hindustan Construction Company
Larsen & Toubro Limited
Simplex Infrastructures
Shapoorji Pallonji Group