Q1. How to maintain Concrete Quality at Site.
Maintain concrete quality at site by proper mix design, testing, curing, and quality control measures.
Ensure proper mix design is followed according to project specifications.
Regularly test concrete for strength, workability, and durability.
Implement proper curing methods to prevent cracking and ensure strength development.
Monitor quality control measures such as batching, placement, and finishing techniques.
Address any issues promptly to maintain quality standards.
Train site...read more
Q2. What tools used in manufacturing industries.
Various tools used in manufacturing industries include calipers, micrometers, gauges, and CMM machines.
Calipers for measuring distances between two opposite sides of an object
Micrometers for measuring very small distances or thicknesses
Gauges for checking the dimensions of a part or product
CMM (Coordinate Measuring Machine) for precise measurement of complex parts
Torque wrenches for applying a specific torque to a fastener
Dial indicators for measuring small linear distances
Q3. Which company is worst in the world
I cannot answer that question as it is inappropriate and unprofessional.
It is not appropriate or professional to speak negatively about any company.
As an Assistant Manager Quality Control, my focus is on ensuring quality standards are met within my own company.
It is important to maintain a positive and respectful attitude towards all companies in the industry.
Speaking negatively about a company can damage professional relationships and reputation.
Q4. Which company is worst in Hyderabad
I cannot answer that question as it would be unprofessional and unethical to speak negatively about any company.
It is not appropriate to speak negatively about any company in a professional setting
It is important to maintain a level of professionalism and respect in the workplace
Instead of focusing on the negative aspects of companies, it is better to focus on improving our own work and processes
Q5. Is code of cement and types of cement
The code of cement refers to the standard specifications used to classify different types of cement.
The code of cement is typically based on the composition and properties of the cement.
Different types of cement include Portland cement, slag cement, and white cement.
Each type of cement has its own specific code that indicates its characteristics and intended use.
Q6. What is 5S, 8D analysis, etc.
5S is a workplace organization method focusing on efficiency and safety. 8D analysis is a problem-solving method used to identify, correct, and prevent recurring problems.
5S stands for Sort, Set in order, Shine, Standardize, Sustain. It helps in organizing the workplace for efficiency and safety.
8D analysis is an eight-step problem-solving method used to identify, correct, and prevent recurring problems in processes or products.
Examples of 5S implementation include organizing...read more
Share interview questions and help millions of jobseekers 🌟
Q7. Testing of quality control material
Testing of quality control material is essential to ensure accuracy and reliability of test results.
Quality control material should be tested regularly to ensure accuracy and reliability of test results.
Testing should be done using standardized procedures and equipment.
Results should be documented and reviewed to identify any trends or issues.
Any deviations from expected results should be investigated and corrective actions taken.
Regular calibration of equipment used for test...read more
Q8. Difference b/w ITP & QAP.
ITP stands for Inspection and Test Plan, while QAP stands for Quality Assurance Plan. Both are essential documents in quality control.
ITP outlines the specific tests and inspections that will be conducted during a project or process.
QAP outlines the overall quality goals, procedures, and responsibilities for ensuring quality throughout a project.
ITP focuses on the technical aspects of quality control, while QAP focuses on the overall quality management system.
ITP is more deta...read more
Assistant Manager Quality Control Jobs
Q9. Total work process in sequence
The total work process in sequence involves planning, execution, monitoring, and controlling to ensure quality standards are met.
Planning: Define quality standards, set objectives, and create a plan of action.
Execution: Implement the plan by carrying out tasks according to the defined standards.
Monitoring: Regularly check progress and performance to identify any deviations from the plan.
Controlling: Take corrective actions to address any issues and ensure quality standards ar...read more
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month