Round 1 - Group Discussion 

What is the colume
The vertical part of the building and base of the slab, distribution of load

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the footing
  • Q2. The base of the building

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Slop of stairs case
  • Ans. 

    The slope of stairs refers to the angle at which the stairs are inclined, affecting safety and accessibility.

    • The slope of stairs is typically between 30-35 degrees for comfortable and safe use.

    • Building codes may dictate specific slope requirements for stairs to ensure safety and accessibility.

    • The slope of stairs can be calculated using trigonometry, with the rise and run of the stairs determining the angle.

    • A steep slop...

  • Answered by AI
  • Q2. Why covering provided in steel reinforcement?
  • Ans. 

    Covering is provided in steel reinforcement to protect it from corrosion and to ensure proper bond with concrete.

    • Covering protects steel reinforcement from corrosion caused by exposure to moisture and chemicals in the environment.

    • It helps in maintaining the bond between steel reinforcement and concrete, ensuring structural integrity.

    • Proper covering thickness is important to prevent rusting of steel bars and maintain du...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leaping zone of steel rainforcement ?
  • Ans. 

    The leaping zone of steel reinforcement refers to the area where the steel bars are not provided in a concrete member.

    • The leaping zone is typically found in beams and slabs where the steel reinforcement is not required to be continuous.

    • It is important to ensure that the leaping zone does not compromise the structural integrity of the member.

    • Proper detailing and design considerations are necessary to determine the exten...

  • Answered by AI
  • Q2. How can identify the site uses materials?
  • Ans. 

    Site uses materials can be identified through visual inspection, testing, and documentation.

    • Conduct visual inspection of materials on site to identify their type and quality

    • Perform tests on materials such as soil, concrete, and asphalt to determine their properties

    • Review documentation such as material specifications, delivery receipts, and quality control reports

    • Consult with suppliers and manufacturers to verify the au

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Draw the section of stairs case with reinforcement.
  • Ans. 

    A section of stairs case with reinforcement is a structural drawing showing the details of the stairs and the reinforcement bars used for strength.

    • Include dimensions and materials used for the stairs and reinforcement bars

    • Show the arrangement of reinforcement bars in the section view

    • Label the different components of the stairs case for clarity

  • Answered by AI
  • Q2. What is the component of maivan technology
  • Ans. 

    Maivan technology consists of various components including sensors, software, and data analytics for monitoring and managing civil infrastructure.

    • Sensors are used to collect data on various parameters such as temperature, humidity, and structural integrity.

    • Software is utilized to process the data collected by sensors and provide real-time monitoring and analysis.

    • Data analytics tools are employed to identify patterns, t...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Minimum cement contains in RCC structure
  • Ans. 

    The minimum cement content in RCC structure is typically around 300 kg/m3.

    • Minimum cement content is usually specified by structural engineers based on design requirements.

    • Higher cement content may be required for structures in aggressive environments or with special design considerations.

    • The minimum cement content is important for achieving the desired strength and durability of the concrete mix.

  • Answered by AI
  • Q2. In slump cone test what is the shape of slump
  • Ans. 

    The shape of slump in a slump cone test is typically conical.

    • The shape of slump is conical, with the top being wider than the base.

    • The height of the slump is measured to determine the workability of the concrete.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability.

    • Example: A true slump has a smooth, symmetrical shape with a slight collapse at the center.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Lapping zone of column
  • Ans. 

    Lapping zone of column is where two reinforcement bars overlap to ensure continuity of load transfer.

    • Lapping zone should be at least 50 times the diameter of the smaller bar away from the face of the support.

    • Proper lapping length is crucial for structural integrity and load distribution.

    • Lapping should be staggered in multiple layers for better strength.

    • Ensure proper cover and clear spacing around the lapping zone to pr

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

It was very good , they give certain time to prepare yourself

Round 2 - Aptitude Test 

It's basically arithmetic and reasoning test

Round 3 - Technical 

(2 Questions)

  • Q1. What is the nominal size of brick
  • Ans. 

    The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.

    • The nominal size of a brick is typically larger than its actual size to account for mortar joints.

    • Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.

    • It is important to consider the nominal size when planning and designing brickwork pr

  • Answered by AI
  • Q2. What are the admixture of concrete
  • Ans. 

    Admixtures are added to concrete to alter its properties or enhance its performance.

    • Admixtures can improve workability, durability, strength, and set time of concrete

    • Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers

    • Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Get your knowledge about construction
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Cut length of spiral stirrup for pile..
  • Ans. 

    The cut length of spiral stirrup for a pile is determined based on the diameter of the pile and the spacing required for the stirrups.

    • Calculate the circumference of the pile using the formula C = π * d, where d is the diameter of the pile.

    • Determine the spacing required for the spiral stirrups based on design specifications.

    • Multiply the circumference of the pile by the number of required spiral stirrups to get the total...

  • Answered by AI
  • Q2. Axial load on column
  • Ans. 

    Axial load on column refers to the vertical force acting on the column, typically due to the weight of the structure it supports.

    • Axial load is the force that acts along the longitudinal axis of the column.

    • It is important to consider axial load in column design to ensure structural stability.

    • Examples of factors affecting axial load include dead loads, live loads, and wind loads on the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About tunneling pramery and secondary structure

Interview Preparation Tips

Topics to prepare for Patel Engineering Civil Site Engineer interview:
  • About tunneling
Interview preparation tips for other job seekers - My name is bashir Ahmad koka I am from Jammu and Kashmir and I have completed my education specialisation in civil engineering please find enclosed here with my curriculum vitae for a post at your project still I am working at NATM tunnel Jammu and Kashmir
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic construction techniques to be known
  • Ans. 

    Basic construction techniques include excavation, foundation construction, concrete pouring, framing, and finishing.

    • Excavation: Digging and removing soil to prepare the site for construction.

    • Foundation construction: Building the base of the structure to provide stability.

    • Concrete pouring: Pouring and leveling concrete to create floors, walls, and other structural elements.

    • Framing: Constructing the skeletal framework of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be clear in your project need before reach the interview..

I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Your present job profile is important
  • Q2. What is your work and responsiblety
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Where do you see yourself in 5 years?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and more hard work........

Ramky Infrastructure Interview FAQs

How many rounds are there in Ramky Infrastructure Civil Site Engineer interview?
Ramky Infrastructure interview process usually has 2 rounds. The most common rounds in the Ramky Infrastructure interview process are Group Discussion and One-on-one Round.
What are the top questions asked in Ramky Infrastructure Civil Site Engineer interview?

Some of the top questions asked at the Ramky Infrastructure Civil Site Engineer interview -

  1. What is the foot...read more
  2. The base of the build...read more

Tell us how to improve this page.

Ramky Infrastructure Civil Site Engineer Salary
based on 35 salaries
₹2.4 L/yr - ₹4.6 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Ramky Infrastructure Civil Site Engineer Reviews and Ratings

based on 15 reviews

3.4/5

Rating in categories

3.3

Skill development

3.1

Work-Life balance

3.1

Salary & Benefits

3.6

Job Security

3.5

Company culture

2.9

Promotions/Appraisal

2.8

Work Satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
104 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Engineer
92 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Senior Engineer
60 salaries
unlock blur

₹2.9 L/yr - ₹6.7 L/yr

Deputy Manager
57 salaries
unlock blur

₹5.9 L/yr - ₹12 L/yr

Senior Assistant Manager
50 salaries
unlock blur

₹5.2 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Ramky Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Nagarjuna Construction Company

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview