I applied via Referral and was interviewed before May 2022. There were 3 interview rounds.
IS code refers to Indian Standards code which provides technical specifications for various products and services.
IS codes are developed by the Bureau of Indian Standards (BIS)
They cover a wide range of products and services such as construction materials, electrical appliances, food products, and more
IS codes provide technical specifications for quality, safety, and performance of products and services
Compliance with ...
Top trending discussions
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
As per your cv details
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Site Engineer
126
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Senior Manager
46
salaries
| ₹12.3 L/yr - ₹31.9 L/yr |
Deputy Manager
45
salaries
| ₹6 L/yr - ₹15 L/yr |
Project Management Consultant
45
salaries
| ₹4.1 L/yr - ₹6.7 L/yr |
Deputy General Manager
42
salaries
| ₹20 L/yr - ₹40 L/yr |
AECOM
AtkinsRealis
McDermott International
Bechtel