Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.
The beam is placed on a lapping machine with an abrasive surface.
The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.
The process is repeated with finer and finer abrasives until the desired finish is achieved.
Lapping can improve the strength and durability of the beam.
It is comm...
The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.
The number of cube samples may vary depending on the project specifications and requirements.
Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.
The cube samples are taken to test the compressive strength of the concrete.
The number of cube samples may also depend on the locat...
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 8 Jul 2017
I appeared for an interview before Jul 2016.
based on 13 reviews
Rating in categories
Assistant Manager
103
salaries
| ₹5.5 L/yr - ₹12.6 L/yr |
Senior Engineer
64
salaries
| ₹4.3 L/yr - ₹9.4 L/yr |
Assistant Engineer
54
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Deputy Manager
53
salaries
| ₹6 L/yr - ₹18 L/yr |
Engineer
51
salaries
| ₹4 L/yr - ₹7.2 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International