Filter interviews by
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
Top trending discussions
After the shortlisting of CVs, list was sent for those who were eligible for the OT. The online test included aptitude + technical. There were pretty easy to moderate questions but time was less.
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
The capacity of Tata Steel's lime plant is yet to be determined.
The capacity of the lime plant is currently unknown and is still to be decided by Tata Steel.
Tata Steel is likely in the process of determining the optimal capacity for their lime plant.
The capacity of the lime plant will depend on various factors such as production requirements, market demand, and technological capabilities.
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
based on 13 reviews
Rating in categories
Assistant Manager
99
salaries
| ₹5.2 L/yr - ₹13.5 L/yr |
Senior Engineer
64
salaries
| ₹4.3 L/yr - ₹9.4 L/yr |
Assistant Engineer
54
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Engineer
50
salaries
| ₹4 L/yr - ₹7.1 L/yr |
Deputy Manager
43
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Crompton Greaves Consumer Electricals
Havells
Bajaj Electricals
Signify