Upload Button Icon Add office photos

Transrail Lighting

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Transrail Lighting Assistant Manager Interview Questions and Answers

Updated 22 Apr 2024

Transrail Lighting Assistant Manager Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Group Discussion 

Group interview at video call

Round 3 - HR 

(3 Questions)

  • Q1. Salary negotiation
  • Q2. 2 time salary negotiation
  • Q3. Accommodation and other benifits

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for good answer

Assistant Manager Interview Questions & Answers

user image Amir hussain

posted on 20 Apr 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.

Interview Preparation Tips

Topics to prepare for Transrail Lighting Assistant Manager interview:
  • About work
Interview preparation tips for other job seekers - Everything is easy and good experience

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Axis Bank
Q4. How many joint holders we can process in an account in once ?
asked in Adani Group
Q5. What IS Codes do you follow for structural steel fabrication and ... read more

Assistant Manager Interview Questions & Answers

user image Nilesh Shinde

posted on 22 Apr 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Expertise in Steel Structure like Tower and Gantry although RCC structure

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

Transrail Lighting Interview FAQs

How many rounds are there in Transrail Lighting Assistant Manager interview?
Transrail Lighting interview process usually has 2 rounds. The most common rounds in the Transrail Lighting interview process are Group Discussion, HR and Resume Shortlist.
How to prepare for Transrail Lighting Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Transrail Lighting. The most common topics and skills that interviewers at Transrail Lighting expect are Accounting, Arena, Auditing, Balance Sheet and Bidding.
What are the top questions asked in Transrail Lighting Assistant Manager interview?

Some of the top questions asked at the Transrail Lighting Assistant Manager interview -

  1. What type of steel Structure have you done and explain o...read more
  2. RCC foundation Design St...read more
  3. Accommodation and other benif...read more

Recently Viewed

LIST OF COMPANIES

Ramky Infrastructure

Locations

INTERVIEWS

Ramky Infrastructure

No Interviews

INTERVIEWS

Ramky Infrastructure

40 top interview questions

REVIEWS

L & W Constructions

No Reviews

SALARIES

Ramky Infrastructure

REVIEWS

Ramky Infrastructure

No Reviews

INTERVIEWS

Transrail Lighting

No Interviews

INTERVIEWS

Transrail Lighting

20 top interview questions

SALARIES

Leighton Contractors

REVIEWS

L & W Constructions

No Reviews

Tell us how to improve this page.

Transrail Lighting Assistant Manager Interview Process

based on 4 interviews

Interview experience

4.3
  
Good
View more
Transrail Lighting Assistant Manager Salary
based on 97 salaries
₹5.2 L/yr - ₹12.6 L/yr
7% more than the average Assistant Manager Salary in India
View more details

Transrail Lighting Assistant Manager Reviews and Ratings

based on 17 reviews

3.6/5

Rating in categories

2.9

Skill development

3.2

Work-life balance

3.4

Salary

3.9

Job security

3.5

Company culture

3.1

Promotions

3.2

Work satisfaction

Explore 17 Reviews and Ratings
Assistant Manager
97 salaries
unlock blur

₹5.2 L/yr - ₹12.6 L/yr

Senior Engineer
65 salaries
unlock blur

₹4.3 L/yr - ₹9.4 L/yr

Deputy Manager
54 salaries
unlock blur

₹6 L/yr - ₹16.5 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Engineer
51 salaries
unlock blur

₹4 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Transrail Lighting with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview