The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
Top trending discussions
You can study basics and come here it just decides on your iq level this really is easy if you dont even practice
I am a dedicated and experienced engineer with a strong background in mechanical design and project management.
Bachelor's degree in Mechanical Engineering from XYZ University
5+ years of experience working in the automotive industry
Proficient in CAD software such as SolidWorks and AutoCAD
Managed multiple projects from concept to completion, resulting in cost savings and improved efficiency
I applied via Walk-in and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Basic scenario based questions
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
posted on 15 Mar 2022
I applied via Newspaper Ad and was interviewed in Feb 2022. There were 4 interview rounds.
based on 6 reviews
Rating in categories
Senior Engineer
126
salaries
| ₹4.2 L/yr - ₹10.6 L/yr |
Assistant Manager
125
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Site Engineer
91
salaries
| ₹3 L/yr - ₹6 L/yr |
Store Officer
84
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Deputy Manager
83
salaries
| ₹7 L/yr - ₹18.5 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure