I applied via Approached by Company and was interviewed before Mar 2023. There were 3 interview rounds.
Regarding what is the stage in Erection procedure or process
Technical related questions like troque tightening values of bolts and other work procedure and what are the documents to be maintained for Erection works and for also for billing
The erection process typically starts at the foundation level.
Start by setting out the reference points for the foundation
Excavate the foundation trenches and pour concrete footings
Proceed with building up the structural elements from the foundation upwards
Ensure proper alignment and leveling at each stage of erection
Top trending discussions
posted on 21 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.
Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.
The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.
Leaks or deformations during the test indicate weaknesses in the pipes.
The test helps in iden...
posted on 21 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
The hydrotest pressure is 1.5 times the design pressure.
Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.
It is usually done before commissioning the system.
For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.
The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.
Classify the base metal
Clean the surface
Align the parts to be joined
Check the root gap and root face
Measure the bevel angle
Check for any mismatch or overlap
Ensure all specifications are met
I applied via Referral and was interviewed before May 2022. There were 3 interview rounds.
IS code refers to Indian Standards code which provides technical specifications for various products and services.
IS codes are developed by the Bureau of Indian Standards (BIS)
They cover a wide range of products and services such as construction materials, electrical appliances, food products, and more
IS codes provide technical specifications for quality, safety, and performance of products and services
Compliance with ...
I applied via Approached by Company and was interviewed in Feb 2022. There were 4 interview rounds.
Interview experience
Assistant Manager
77
salaries
| ₹4 L/yr - ₹12.2 L/yr |
Design Engineer
50
salaries
| ₹2.1 L/yr - ₹7 L/yr |
Senior Engineer
46
salaries
| ₹3.4 L/yr - ₹8.5 L/yr |
Production Engineer
42
salaries
| ₹2.4 L/yr - ₹9.4 L/yr |
Engineer
41
salaries
| ₹2.2 L/yr - ₹6.6 L/yr |
Tata BlueScope Steel
Jindal Steel and Power
Bhushan Power & Steel
Everest Industries