Sterling & Wilson Site Supervisor Interview Questions and Answers

Updated 6 Aug 2022

Sterling & Wilson Site Supervisor Interview Experiences

1 interview found

I applied via Campus Placement and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Transmision linone substation
  • Q2. Technical any questions

Interview Preparation Tips

Interview preparation tips for other job seekers - 4.5 years experience transmision lione
Substation 132 KV

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Project Details in the past
  • Q2. Current package and expected package
Round 3 - HR 

(1 Question)

  • Q1. Package details for past as well as expected

Interview Preparation Tips

Interview preparation tips for other job seekers - OK
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. : What are some of the biggest challenges civil engineers face?
  • Ans. 

    Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.

    • Managing project budgets effectively to avoid cost overruns

    • Dealing with unexpected site conditions such as soil instability or environmental hazards

    • Ensuring compliance with regulations and obtaining necessary permits

    • Balancing the needs of various stakeho...

  • Answered by AI
  • Q2. What is your favorite role on a project team? How do you react to a task you're not sure how to approach?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me M25 ratio
  • Ans. 

    M25 ratio refers to the mix ratio of concrete, commonly used in construction projects.

    • M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This mix is commonly used for structural concrete works like columns, beams, and slabs.

    • The strength of concrete with M25 ratio is typically around 25 megapascals after 28 days of curing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Why do you want to quit your present organisation ?
  • Q2. Would you like to go to outside of West Bengal ?
  • Q3. How much salary would you expect ?
  • Q4. Within how many days would you like to join?

Interview Preparation Tips

Interview preparation tips for other job seekers - Friendly

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Basic introduction and work related questions
  • Q2. Working company and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is good salary on time work life is balanced and not unnecessary problem.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Asking to me...... Only civil engineering questions
  • Q2. Only waste water treatment plants related questions
  • Q3. What is hydro power test of DI pipes...?
  • Ans. 

    Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.

    • Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.

    • The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.

    • Leaks or deformations during the test indicate weaknesses in the pipes.

    • The test helps in iden...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Only waste water treatment plants related questions
  • Q2. RCC spun related question
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

What is the colume
The vertical part of the building and base of the slab, distribution of load

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the footing
  • Q2. The base of the building
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to select a conductor?
  • Ans. 

    Conductors are selected based on factors like material, size, insulation, and current carrying capacity.

    • Consider the material of the conductor (e.g. copper, aluminum)

    • Determine the size of the conductor based on the current it will carry

    • Choose the appropriate insulation for the conductor based on the environment it will be used in

    • Ensure the conductor has the required current carrying capacity for the application

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - see terms and conditions

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson Site Supervisor interview?
Sterling & Wilson interview process usually has 1 rounds. The most common rounds in the Sterling & Wilson interview process are Technical.
What are the top questions asked in Sterling & Wilson Site Supervisor interview?

Some of the top questions asked at the Sterling & Wilson Site Supervisor interview -

  1. Transmision linone substat...read more
  2. Technical any questi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 426 Interviews
Thermax Limited Interview Questions
4.2
 • 237 Interviews
ABB Interview Questions
4.1
 • 227 Interviews
Havells Interview Questions
4.0
 • 203 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
BHEL Interview Questions
4.1
 • 106 Interviews
View all
Sterling & Wilson Site Supervisor Salary
based on 34 salaries
₹1.5 L/yr - ₹6 L/yr
At par with the average Site Supervisor Salary in India
View more details

Sterling & Wilson Site Supervisor Reviews and Ratings

based on 13 reviews

3.9/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.9

Salary

3.7

Job security

3.8

Company culture

3.3

Promotions

3.9

Work satisfaction

Explore 13 Reviews and Ratings
Electrical Engineer
269 salaries
unlock blur

₹1.8 L/yr - ₹8.4 L/yr

Senior Engineer
247 salaries
unlock blur

₹3.1 L/yr - ₹9.1 L/yr

Assistant Manager
212 salaries
unlock blur

₹4.4 L/yr - ₹15.5 L/yr

Project Engineer
210 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Deputy General Manager
148 salaries
unlock blur

₹16 L/yr - ₹40 L/yr

Explore more salaries
Compare Sterling & Wilson with

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare

Thermax Limited

4.2
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview