Filter interviews by
I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.
Maintenance of machineries is important to ensure their optimal performance and prevent breakdowns.
Regular maintenance helps to identify and fix small issues before they become major problems.
It increases the lifespan of the machinery and reduces the need for costly repairs or replacements.
Proper maintenance also ensures the safety of workers who operate the machinery.
Examples of maintenance tasks include lubrication, ...
I maintain a detailed logbook for each machine, including maintenance schedules, repairs, and any upgrades.
Create a logbook for each machine
Record maintenance schedules, repairs, and upgrades
Include dates, details of work done, and any parts replaced
Regularly update the logbook
Use digital tools like spreadsheets or specialized software for easier tracking
I was interviewed in Aug 2024.
Typically, stainless steel pipes are used for compressor lines due to their durability and resistance to corrosion.
Stainless steel pipes are commonly used for compressor lines due to their high strength and corrosion resistance.
Copper pipes can also be used for compressor lines, especially in smaller systems.
PVC pipes are not recommended for compressor lines as they may not be able to handle the high pressure and tempe...
Execution in MEP is ensured through regular site visits, quality checks, coordination meetings, and adherence to project specifications.
Regular site visits to monitor progress and quality of work
Conducting quality checks to ensure compliance with project specifications
Participating in coordination meetings with other teams to address any issues or conflicts
Reviewing and approving shop drawings and material submittals
En...
I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
L & W Constructions interview questions for popular designations
Good process from management side
Get interview-ready with Top L & W Constructions Interview Questions
posted on 27 Nov 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
I have previous company exposure in project management and engineering roles.
Worked as a Project Engineer at XYZ Company for 3 years
Managed multiple projects simultaneously, ensuring timely completion and within budget
Collaborated with cross-functional teams to identify project requirements and deliverables
Implemented project management methodologies and tools to streamline processes
Led a team of engineers to successfu...
Design coordination involves documentation, value engineering, and collaboration with various stakeholders.
Identify project stakeholders and their roles
Establish communication channels and protocols
Review design documents and identify potential conflicts
Collaborate with architects, engineers, contractors, and other stakeholders to resolve conflicts
Conduct value engineering to optimize design and reduce costs
Document al...
I applied via Job Portal and was interviewed before May 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jan 2023. There was 1 interview round.
MEP (Mechanical, Electrical, and Plumbing) coordination is essential for architectural projects.
MEP systems need to be integrated with architectural designs to ensure functionality and efficiency.
Architects and MEP engineers collaborate to coordinate the placement of MEP elements within the building design.
MEP coordination involves considering factors like space requirements, structural limitations, and aesthetic consi...
I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 2 interview rounds.
Bulk material refers to large quantities of a substance that is typically stored, transported, and handled in loose form.
Bulk material is often measured by weight or volume.
Examples of bulk materials include grains, coal, sand, gravel, and liquids like oil and gas.
Bulk materials are typically stored in silos, tanks, or containers designed for easy handling and transportation.
Handling bulk materials requires specialized...
Top trending discussions
The duration of L & W Constructions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 23 interviews
Interview experience
based on 466 reviews
Rating in categories
Site Engineer
121
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
89
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
MEP Engineer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Larsen & Toubro Limited
Shapoorji Pallonji Group
GMR Group