Updated 27 Nov 2023

L & W Constructions Project Management Office Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Handling of Planning Software & MS office
  • Q2. Basic Field knowledge
  • Q3. Planning and scheduling and quantity take offs
Round 3 - HR 

(1 Question)

  • Q1. Previous company exposure
  • Ans. 

    I have previous company exposure in project management and engineering roles.

    • Worked as a Project Engineer at XYZ Company for 3 years

    • Managed multiple projects simultaneously, ensuring timely completion and within budget

    • Collaborated with cross-functional teams to identify project requirements and deliverables

    • Implemented project management methodologies and tools to streamline processes

    • Led a team of engineers to successfu...

  • Answered by AI

Interview questions from similar companies

Interview Preparation Tips

Round: Test
Experience: Almost all questions asked were from design section because the company was offering us design engineering jobs. Half of the questions you can attempt from applying your +2 basics, free body diagrams, projections etc.

Overall I found the paper checks your imaginative skills applied in engineering rather than formula oriented (mugged up) questions.
Tips: Be strong with your basics, that will help a lot
Duration: 60 minutes
Total Questions: 30

Round: Technical Interview
Experience: The tech team was great. Well experienced but very frank guys who will ease you during the interview. So all the best for your performance
Tips: Specially try to give correct answer or atleast the correct approach (preferably basic approach) for the questions you did wrong in the written test.

General Tips: Be positive and confident, always try to show your positive side & your improving nature
Skills: 12th class basic fundamentals, Engineering Drawing, Machine Drawing , Design engineering
College Name: NIT WARANGAL

I applied via LinkedIn and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Good

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company. Environment is very good.

I appeared for an interview in Sep 2021.

Interview Questionnaire 

1 Question

  • Q1. B.tech project

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic Technical questions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Asking about project in resume
  • Ans. You should have great knowledge about your project
  • Answered Anonymously

I applied via Campus Placement

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Basics of electrical knowlede, Internships, Apprenticeship based, Basically past experience based.

Interview Preparation Tips

Interview preparation tips for other job seekers - For jobs in core Internships helps alot in getting shortlisted for the interview.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed before Jul 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

The very first round was Online Assessment( Aptitude+Technical - MCQs).

Round 2 - Technical 

(2 Questions)

  • Q1. Questions on Relays, Transformer losses
  • Q2. Situation question on leadership

Interview Preparation Tips

Topics to prepare for Burns & McDonnell Graduate Engineer Trainee (Get) interview:
  • Basic Electrical
  • Power Systems
  • Power System Protection
Interview preparation tips for other job seekers - • Crack your assessment round smoothly but prepare well for your interview round.
• Brush up on basics concepts which is more than enough
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. Where are you from, family background
  • Q3. Difference between LSM and WSM
  • Ans. 

    LSM and WSM are two different methods of measuring soil moisture content.

    • LSM stands for Laboratory Soil Moisture and WSM stands for Field Water Content.

    • LSM measures the moisture content of soil samples in a laboratory setting.

    • WSM measures the water content of soil in the field using various methods such as gravimetric, neutron probe, and time domain reflectometry.

    • LSM is more accurate but time-consuming, while WSM is le...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview is easy, my panel was very good. Just study the basics of Concrete Design and Structural Analysis.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical question only sply piping execution
  • Q2. Welding related electrodes,ID progress,

Interview Preparation Tips

Interview preparation tips for other job seekers - Involving more field activity in which planning about progress quantification.

Interview Questionnaire 

8 Questions

  • Q1. What is transformer losses?
  • Ans. 

    Transformer losses refer to the energy dissipated in a transformer during its operation.

    • Transformer losses include copper losses and iron losses.

    • Copper losses occur due to the resistance of the transformer windings.

    • Iron losses, also known as core losses, occur due to hysteresis and eddy currents in the transformer core.

    • Copper losses can be minimized by using larger conductor sizes and reducing the resistance of winding...

  • Answered by AI
  • Q2. Why neutral is Grounded in star connected transformer?
  • Ans. 

    Neutral is grounded in star connected transformer for safety and to limit voltage rise.

    • Grounding neutral limits voltage rise in case of unbalanced loads.

    • It provides a path for fault current to flow, which helps in detecting and isolating faults.

    • It reduces the risk of electric shock to personnel and damage to equipment.

    • In some countries, it is a legal requirement to ground the neutral in electrical systems.

    • Example: In a...

  • Answered by AI
  • Q3. Difference between power and energy.
  • Ans. 

    Power is the rate at which energy is transferred, while energy is the ability to do work.

    • Power is measured in watts, while energy is measured in joules.

    • Power is the rate at which energy is used or transferred, while energy is the capacity to do work.

    • A light bulb may have a power rating of 60 watts, but the energy it consumes over time is measured in watt-hours.

    • Energy can exist in different forms, such as kinetic, poten...

  • Answered by AI
  • Q4. What is IGBT?
  • Ans. 

    IGBT stands for Insulated Gate Bipolar Transistor, a power semiconductor device used for switching and amplification of electrical power.

    • IGBT is a three-terminal device with a collector, emitter, and gate.

    • It combines the advantages of MOSFET and BJT transistors.

    • It is commonly used in high power applications such as motor drives, power supplies, and renewable energy systems.

    • IGBTs have low on-state voltage drop and high ...

  • Answered by AI
  • Q5. Explain the working of relay.
  • Ans. 

    Relay is an electrically operated switch that uses an electromagnet to mechanically open or close a circuit.

    • Relays are used to control high voltage or high current circuits with low voltage signals.

    • They are commonly used in industrial automation, automotive applications, and household appliances.

    • Relays can be classified into different types based on their construction and operation, such as electromagnetic relays, soli...

  • Answered by AI
  • Q6. How CT and PT are connected in circuit?
  • Ans. 

    CT and PT are connected in circuit to measure current and voltage respectively.

    • CT is connected in series with the load to measure current

    • PT is connected in parallel with the load to measure voltage

    • CT and PT are used together to measure power in a circuit

    • The ratio of CT and PT is important for accurate measurement

  • Answered by AI
  • Q7. Working principle of Solar PV module.
  • Ans. 

    Solar PV modules convert sunlight into electricity using photovoltaic effect.

    • Solar PV modules consist of multiple solar cells connected in series and parallel.

    • Each solar cell is made of semiconductor material, usually silicon.

    • When sunlight hits the solar cell, it excites the electrons in the semiconductor material, creating a flow of electricity.

    • The electricity generated by the solar cells is direct current (DC), which...

  • Answered by AI
  • Q8. What is the relation between line voltage and phase voltage in Star connection?
  • Ans. 

    In Star connection, line voltage is equal to the square root of 3 times phase voltage.

    • Line voltage is the voltage between any two line conductors in a three-phase system.

    • Phase voltage is the voltage between any line conductor and the neutral point in a three-phase system.

    • In a Star connection, all three phases are connected to a common neutral point.

    • The relationship between line voltage and phase voltage in Star connect...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was very good.
All the above questions handled by me very easily.

Skills evaluated in this interview

L & W Constructions Interview FAQs

How many rounds are there in L & W Constructions Project Management Office Engineer interview?
L & W Constructions interview process usually has 3 rounds. The most common rounds in the L & W Constructions interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in L & W Constructions Project Management Office Engineer interview?

Some of the top questions asked at the L & W Constructions Project Management Office Engineer interview -

  1. Handling of Planning Software & MS off...read more
  2. Planning and scheduling and quantity take o...read more
  3. Basic Field knowle...read more

Tell us how to improve this page.

L & W Constructions Project Management Office Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tractebel Interview Questions
4.1
 • 42 Interviews
SYSTRA Interview Questions
4.0
 • 23 Interviews
View all
Site Engineer
120 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
88 salaries
unlock blur

₹3.8 L/yr - ₹8.5 L/yr

Civil Site Engineer
62 salaries
unlock blur

₹1.8 L/yr - ₹5.8 L/yr

QA QC Engineer
51 salaries
unlock blur

₹1.8 L/yr - ₹6.6 L/yr

MEP Engineer
49 salaries
unlock blur

₹1.4 L/yr - ₹7 L/yr

Explore more salaries
Compare L & W Constructions with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Ramky Infrastructure

4.2
Compare

Dodsal Engineering & Construction

4.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview