Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Tuaman Engineering Team. If you also belong to the team, you can get access from here

Tuaman Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Tuaman Engineering Planning Engineer Interview Questions and Answers

Updated 7 May 2024

Tuaman Engineering Planning Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Primavera p6 performanc required

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Personal Details
  • Q2. Name Residence Qualification hobbies experience etc
  • Ans. 

    Residence: New York, Qualification: Bachelor's degree in Civil Engineering, Hobbies: Reading, Experience: 5 years in planning and scheduling

    • Residence: New York

    • Qualification: Bachelor's degree in Civil Engineering

    • Hobbies: Reading

    • Experience: 5 years in planning and scheduling

  • Answered by AI
Round 2 - Technical 

(12 Questions)

  • Q1. In M20 what does M stands for
  • Ans. 

    M stands for 'Mix' in M20.

    • M20 is a designation for a concrete mix with a compressive strength of 20 megapascals (MPa).

    • The 'M' in M20 represents the word 'Mix', indicating that it is a mix of cement, sand, and aggregate.

    • The number following 'M' in M20 denotes the compressive strength of the concrete mix.

    • Different grades of concrete have different compressive strength requirements, and the 'M' designation helps in identi

  • Answered by AI
  • Q2. M stands for Mix and 20 is compressive strength after 28 days
  • Q3. Why do we need curing for concrete
  • Ans. 

    Curing is necessary for concrete to ensure proper hydration and strength development.

    • Curing prevents moisture loss from the concrete, allowing it to maintain its desired water-cement ratio.

    • It helps in reducing shrinkage and cracking by providing a controlled environment for the concrete to cure.

    • Curing promotes the formation of calcium silicate hydrate (CSH) gel, which contributes to the strength and durability of concr...

  • Answered by AI
  • Q4. After casting...concrete loss it's moisture content in order to maintain moisture content we give water to concrete to gain early strength and also resist creep formation
  • Ans. 

    Water is added to concrete after casting to maintain moisture content and achieve early strength and resist creep formation.

    • Adding water to concrete after casting helps to prevent excessive moisture loss.

    • Maintaining moisture content in concrete is important for proper hydration of cement particles.

    • Watering concrete can also help in reducing shrinkage and cracking.

    • By providing moisture, the concrete gains strength faste...

  • Answered by AI
  • Q5. Steps involved in concreting
  • Ans. 

    The steps involved in concreting include site preparation, formwork, reinforcement, mixing, pouring, leveling, finishing, and curing.

    • Site preparation involves clearing the area and ensuring proper drainage.

    • Formwork is constructed to shape and support the concrete.

    • Reinforcement is placed to provide strength to the concrete structure.

    • Concrete ingredients are mixed in the correct proportions.

    • The mixed concrete is poured i...

  • Answered by AI
  • Q6. 1.Batching 2.Mixing 3.Transportation 4.Placing 5.Compaction & Finishing
  • Q7. Allowable Height for Free fall for concrete
  • Ans. 

    The allowable height for free fall for concrete depends on several factors.

    • The allowable height for free fall for concrete is typically specified by the project specifications or industry standards.

    • The height is influenced by factors such as the type of concrete mix, slump value, and the presence of reinforcing steel.

    • For example, for normal weight concrete with a slump of 3 to 4 inches and no reinforcing steel, the all...

  • Answered by AI
  • Q8. 1.5m in order to avoid segregation and bleeding
  • Q9. Difference between segregation and bleeding
  • Ans. 

    Segregation is the separation of coarse and fine particles in concrete mix, while bleeding is the upward movement of water in fresh concrete.

    • Segregation occurs when the coarse aggregates settle down due to gravity, resulting in a non-uniform distribution of particles in the mix.

    • Bleeding happens when excess water in the concrete mix rises to the surface, leaving behind a layer of water on top.

    • Segregation can lead to a d...

  • Answered by AI
  • Q10. In bleeding water comes out from concrete and in segregation aggregate separates from concrete
  • Ans. 

    Bleeding and segregation are common issues in concrete construction.

    • Bleeding occurs when excess water in the concrete mixture rises to the surface, leaving behind a layer of water.

    • Segregation happens when the coarse aggregates separate from the rest of the concrete mixture.

    • Both bleeding and segregation can negatively impact the strength and durability of the concrete.

    • Proper mix design, adequate compaction, and appropri...

  • Answered by AI
  • Q11. Do you know about latence
  • Q12. Yes sir....when water comes out from concrete along with a cement it makes a layer on the top of the concrete that layer we call latence....
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Method of delay analysis
  • Ans. 

    Delay analysis methods are used to determine the causes and impacts of project delays.

    • There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.

    • Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.

    • CPM is a commonly used method that analyzes the project schedule...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on delay and scheduling
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Detailed about planning
  • Ans. Planning is art of creating and arranging task and activities for a certain predefined goal .
  • Answered Anonymously
  • Q2. Primavera P6 and its applications in Planning
  • Ans. 

    Primavera P6 is a project management software used for planning, scheduling, and controlling projects.

    • Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.

    • It allows users to create project schedules, allocate resources, track progress, and analyze project performance.

    • The software helps in optimizing project plans, identifying critical paths, and managing project risks.

    • Users can...

  • Answered by AI
  • Q3. Project Management
  • Q4. Cost Control and Capex

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about planning
In-Depth knowledge of your work and WBS
Primavera P6 tool
Advance Excel will added advantage
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Can you fill measurement book provided by client?
  • Ans. 

    Yes, I am able to fill measurement books provided by clients.

    • I have experience in accurately recording measurements and quantities in measurement books.

    • I am familiar with the format and requirements of measurement books provided by clients.

    • I ensure all necessary details are included in the measurement book, such as date, location, description of work, measurements, and signatures.

    • I am proficient in using measurement to...

  • Answered by AI
  • Q2. What is Rolling margin?
  • Ans. 

    Rolling margin is the difference between the planned value and the earned value at a specific point in time.

    • Rolling margin helps in measuring the efficiency of a project by comparing planned and actual progress.

    • It is calculated by subtracting the earned value from the planned value.

    • A positive rolling margin indicates that the project is ahead of schedule, while a negative rolling margin indicates that the project is be

  • Answered by AI
  • Q3. What are the consumption ratios in civil work
  • Ans. 

    Consumption ratios in civil work refer to the quantities of materials used in construction projects.

    • Consumption ratios vary depending on the type of civil work being done.

    • Common consumption ratios include cement:sand:aggregate ratios for concrete mixes.

    • Other consumption ratios may include steel reinforcement ratios for structural elements.

    • Accurate consumption ratios are essential for cost estimation and project plannin

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Share your practical knowledge

Planning Engineer Interview Questions & Answers

Katerra user image Ravindra Pathakunti

posted on 29 Sep 2023

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic Introduction and Experience Details
Round 3 - Technical 

(2 Questions)

  • Q1. Question based on past experience
  • Q2. Question regarding planning
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Basics of your previous company's project. 2. Questions regarding MSP & Primavera. 3. Sequencing of construction activities. 4. Brief knowledge of Crictical Path method. 5. Basics of Civil Engineering. ...

Interview Preparation Tips

Topics to prepare for B.L. Kashyap & Sons Planning Engineer interview:
  • MS Project
  • Primavera
Interview preparation tips for other job seekers - Focus more on your Basics.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Past experience
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There were 4 interview rounds.

Round 1 - Group Discussion 

Demonetization, pros and cons, 5 people in the discussion. HR were friendly and make possible way to comfort the candidates.

Round 2 - Aptitude Test 

Aptitude and technical question-mostly difficult questions.

Round 3 - Technical 

(1 Question)

  • Q1. Technical interview went with Project Manager and design manager, overall experience good.
Round 4 - HR 

(1 Question)

  • Q1. Basic HR questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization to work in geotechnical field.

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Previous experience in detail

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your answers short specific and clear.

Tuaman Engineering Interview FAQs

How many rounds are there in Tuaman Engineering Planning Engineer interview?
Tuaman Engineering interview process usually has 1 rounds. The most common rounds in the Tuaman Engineering interview process are Technical.
How to prepare for Tuaman Engineering Planning Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tuaman Engineering. The most common topics and skills that interviewers at Tuaman Engineering expect are Planning, Scheduling, Budgeting, Costing and MSP.

Tell us how to improve this page.

Tuaman Engineering Planning Engineer Interview Process

based on 2 interviews

Interview experience

2
  
Poor
View more
Tuaman Engineering Planning Engineer Salary
based on 5 salaries
₹5.5 L/yr - ₹6.4 L/yr
6% less than the average Planning Engineer Salary in India
View more details

Tuaman Engineering Planning Engineer Reviews and Ratings

based on 3 reviews

3.4/5

Rating in categories

3.5

Skill development

3.3

Work-life balance

3.1

Salary

2.7

Job security

2.8

Company culture

3.1

Promotions

2.8

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
44 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Assistant Manager
40 salaries
unlock blur

₹6 L/yr - ₹11.2 L/yr

Deputy Manager
31 salaries
unlock blur

₹5.8 L/yr - ₹10 L/yr

Safety Officer
30 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Safety Supervisor
29 salaries
unlock blur

₹1.6 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Tuaman Engineering with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview