B.L. Kashyap & Sons QA/QC Civil Engineer Interview Questions and Answers

Updated 27 Jan 2025

B.L. Kashyap & Sons QA/QC Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is Standard Deviation?
  • Ans. 

    Standard deviation is a measure of the dispersion or spread of a set of data points from the mean.

    • Standard deviation is calculated by taking the square root of the variance.

    • It indicates how much the data points deviate from the mean.

    • A higher standard deviation means the data points are more spread out, while a lower standard deviation means they are closer to the mean.

    • For example, in a set of test scores, a high standa...

  • Answered by AI

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is good thans naukari. Com
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What you know about ISO?
  • Ans. 

    ISO is an international organization that develops and publishes standards for various industries.

    • ISO stands for International Organization for Standardization

    • ISO develops and publishes standards for various industries such as quality management, environmental management, and information security management

    • ISO 9001 is a quality management standard that outlines requirements for a quality management system

    • ISO 14001 is a...

  • Answered by AI
  • Q2. Difference between quality manual & project quality plan? question about project quality plan?
  • Q3. Construction Material testing, mix design, case study question of site condition.
Round 3 - HR 

(1 Question)

  • Q1. Reason of job changes & salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & give detail answer & Be ready for cross questions
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell about self and ur present company
  • Q2. What is your present salary and how much your expectations?
  • Q3. What is notice period
Round 3 - Technical 

(4 Questions)

  • Q1. How did u check reinforcement after coming to site
  • Ans. 

    I checked reinforcement by verifying the bar bending schedule and conducting visual inspections.

    • Verified the bar bending schedule to ensure the correct size, shape, and placement of reinforcement bars.

    • Conducted visual inspections to check for any damage, corrosion, or improper installation of reinforcement.

    • Used a cover meter to check the depth of concrete cover over the reinforcement bars.

    • Checked the lap length of rein...

  • Answered by AI
  • Q2. How many cubes u cast per 1 m³
  • Ans. 

    The number of cubes cast per 1 m³ depends on the size of the cube.

    • The size of the cube can vary from 50mm to 150mm.

    • For example, if the cube size is 100mm, then 1000 cubes will be cast per 1 m³.

    • The number of cubes cast per 1 m³ is important for determining the compressive strength of concrete.

  • Answered by AI
  • Q3. What is QA/QC and tell me about our daily job activities
  • Ans. 

    QA/QC is the process of ensuring quality and consistency in construction projects.

    • Reviewing project specifications and ensuring compliance

    • Performing inspections and tests on materials and structures

    • Documenting and reporting any issues or non-compliance

    • Collaborating with project managers and contractors to resolve issues

    • Continuously monitoring and improving quality control processes

  • Answered by AI
  • Q4. How much cement content in your mix design and types of concretes ur using in present site
  • Ans. 

    I am using a mix design with X amount of cement content and various types of concrete on site.

    • The mix design includes X amount of cement content.

    • We are using different types of concrete on site such as reinforced, precast, and prestressed concrete.

    • The type of concrete used depends on the specific project requirements and design.

    • We ensure that the concrete mix meets the required strength and durability standards.

    • Regular...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good company to do work but personal life was have leave

I applied via Shine and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Civil engineering related
  • Q2. QA/QC civil related Site visit working Documentation
  • Q3. All material checked documents records.
  • Q4. Design and drawing documents.

Interview Preparation Tips

Interview preparation tips for other job seekers - Compni policy very good
L&T compni systematic work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Thoroughly asked questions for 40 min in technical round regarding my dept in depth knowledge,my responsibility in last company, academic career, handled project size and my team size.
Round 3 - HR 

(1 Question)

  • Q1. Regarding document varification and salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - If your exp is 5 years plus and if you have deep knowledge about your work and responsibilities then you get the job.

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.
Contribute & help others!
anonymous
You can choose to be anonymous

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons QA/QC Civil Engineer interview?
B.L. Kashyap & Sons interview process usually has 1 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are Technical.

Recently Viewed

INTERVIEWS

Eshopbox Ecommerce

No Interviews

INTERVIEWS

Forbes & Company

No Interviews

INTERVIEWS

B.L. Kashyap & Sons

No Interviews

INTERVIEWS

Forbes & Company

No Interviews

INTERVIEWS

B.L. Kashyap & Sons

No Interviews

INTERVIEWS

Eshopbox Ecommerce

No Interviews

INTERVIEWS

Eshopbox Ecommerce

No Interviews

DESIGNATION

REVIEWS

Sasken

No Reviews

INTERVIEWS

B.L. Kashyap & Sons

No Interviews

Tell us how to improve this page.

B.L. Kashyap & Sons QA/QC Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Site Engineer
100 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
82 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
39 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Ahluwalia Contracts India

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent