Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by B.L. Kashyap & Sons Team. If you also belong to the team, you can get access from here

B.L. Kashyap & Sons Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 484 Reviews

Filter interviews by

B.L. Kashyap & Sons QA/QC Civil Engineer Interview Questions and Answers

Updated 27 Jan 2025

B.L. Kashyap & Sons QA/QC Civil Engineer Interview Experiences

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Why did you have to go through four rounds of interviews?
  • Q2. What is your experience in the oil and gas industry?

Interview Preparation Tips

Interview preparation tips for other job seekers - This company offers positions for both experienced professionals and fresh graduates in the Aramco oil and gas sector.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Role of engineer to control disaster management

Round 2 - HR 

(1 Question)

  • Q1. Normal qurstions
Round 3 - Technical 

(1 Question)

  • Q1. About technical skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Site planning , binding work ,
  • Q2. Drawing work auto CAD
  • Q3. Billing engineer, work s
  • Q4. Salary Client al

Interview Preparation Tips

Topics to prepare for L & W Constructions Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. I am fresher and 3 month job in Maharashtra civil site engineer engineer on duty and I am a final year student
Round 2 - Material related 

(4 Questions)

  • Q1. Concrete material
  • Q2. Type of material
  • Ans. 

    Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.

    • Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.

    • Concrete is used for foundations, roads, and structures.

    • Steel is used for beams, columns, and reinforcement.

    • Asphalt is used for roads and pavements.

    • Wood is used for formwork, bridges, and buildings.

    • Aggregates are used in concrete

  • Answered by AI
  • Q3. Material distribution
  • Q4. Normal material

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Water supply project
  • Q2. Civil work and di pipe , HDPE pipe lines

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Arvind Kumar my water supply project experience 11
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Procedure of laying tile and granite
  • Ans. 

    The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.

    • Prepare the surface by ensuring it is clean, level, and dry.

    • Apply adhesive to the surface using a trowel, ensuring even coverage.

    • Lay the tiles/granite starting from the center and working outwards in a pattern.

    • Grout the tiles/granite by filling the gaps between them with grout and ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Reinforced is code
  • Q2. Aggregate is code
  • Q3. Opc cement isi code
  • Q4. Mix design code
  • Q5. Soil compaction isi code

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons QA/QC Civil Engineer interview?
B.L. Kashyap & Sons interview process usually has 1 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are Technical.

Tell us how to improve this page.

B.L. Kashyap & Sons QA/QC Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Site Engineer
108 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Civil Site Engineer
92 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
79 salaries
unlock blur

₹4.1 L/yr - ₹8 L/yr

Junior Engineer
40 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

Junior Engineer Civil
36 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Ahluwalia Contracts India

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview