Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.
Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.
Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.
The quantity of shuttering material required also depends on the type of formwork used, su...
Top trending discussions
based on 4 reviews
Rating in categories
Site Engineer
107
salaries
| ₹2 L/yr - ₹6 L/yr |
Civil Site Engineer
92
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
81
salaries
| ₹4.1 L/yr - ₹8 L/yr |
Junior Engineer
40
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Junior Engineer Civil
36
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Larsen & Toubro Limited
Shapoorji Pallonji Group