B.L. Kashyap & Sons Deputy General Manager Operations Interview Questions and Answers

Updated 8 Feb 2025

B.L. Kashyap & Sons Deputy General Manager Operations Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Labour rate of shuttering
  • Q2. Productivity of shuttering and Reinforcement
Round 2 - HR 

(1 Question)

  • Q1. Regarding CTC discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, as you will be asked very straightforward and practical engineering questions.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work related and current responsibility
Round 3 - Technical 

(1 Question)

  • Q1. Faculty and experience related

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

10 Questions

  • Q1. We will give only salary, no facilities, no guest house , no HRA, they keep only container at site no office building, transport one car 9 people sitting, no timings, heavy politics
  • Q2. Why to use 24/7 watsapp so many groups messages ?
  • Ans. 

    24/7 WhatsApp groups messages are essential for effective communication and quick decision-making.

    • WhatsApp groups allow for instant communication and collaboration among team members

    • 24/7 availability ensures that urgent matters can be addressed promptly

    • Group messages allow for sharing of important information and updates

    • Reduces the need for lengthy email chains and phone calls

    • Increases efficiency and productivity

    • Exampl...

  • Answered by AI
  • Q3. When you conduct meating with , why you not share MOM and distribute checklist, decsion/ changes taken in meetings if you dont deliver to ground workers , what is pupose of meeting?
  • Q4. Organogram designations should be in this way ,(keypersons) TL, DTL, desiner, planner, contract administrator, surveyor , architect, (profeessional staff ) qs engineer, qc engineer but here TL , Construct...
  • Q5. When nught shifts food not available
  • Ans. 

    Alternative food options will be provided for night shifts.

    • We understand the importance of providing food for our employees, especially during night shifts.

    • We will ensure that alternative food options are available for our employees during night shifts.

    • This may include providing pre-packaged meals or snacks, or arranging for food delivery services.

    • We will work with our employees to ensure that their dietary needs and p...

  • Answered by AI
  • Q6. They will listen only toTL only and no feedback from lower staff
  • Q7. Officer managers, document controller ,office boy , sweepers are not there
  • Q8. No place to eat in the afternoon
  • Q9. No sharing technical codes/training from head office
  • Q10. Politics are heavy

Interview Preparation Tips

Interview preparation tips for other job seekers - be honest

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons Deputy General Manager Operations interview?
B.L. Kashyap & Sons interview process usually has 2 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are Technical and HR.

Tell us how to improve this page.

B.L. Kashyap & Sons Deputy General Manager Operations Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

B.L. Kashyap & Sons Deputy General Manager Operations Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

2.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
108 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Civil Site Engineer
92 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
79 salaries
unlock blur

₹4.1 L/yr - ₹8 L/yr

Junior Engineer
40 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

Junior Engineer Civil
36 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Ahluwalia Contracts India

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview