The dry cost of a project can be calculated by subtracting the cost of materials and equipment from the total project cost.
Determine the total project cost by adding up all the expenses, including labor, materials, equipment, and overhead costs.
Identify the cost of materials and equipment used in the project.
Subtract the cost of materials and equipment from the total project cost to obtain the dry cost.
Dry cost = Total
Rolling margin of steel refers to the difference between the initial thickness of a steel plate and its final thickness after undergoing the rolling process.
Rolling margin is a measure of the reduction in thickness that occurs during the rolling process.
It is calculated by subtracting the final thickness of the steel plate from its initial thickness.
The rolling margin is influenced by factors such as the type of steel,...
Top trending discussions
posted on 3 May 2019
I applied via Referral
posted on 8 Apr 2024
posted on 11 Mar 2022
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.
Cable (stress) helps to distribute the load of the bridge evenly.
It reduces the amount of material required for construction.
It also helps to improve the stability of the bridge.
Cable (stress) is commonly used in suspension bridges.
It allows for longer spans to be constructed without the need for additional support.
Cab...
posted on 18 Aug 2021
I appeared for an interview in Jan 2025.
The hydraulic gradient line is a line representing the total head of water at various points along a flow path in a hydraulic system.
It is a graphical representation of the total head of water in a hydraulic system.
It shows the energy level of water at different points along a flow path.
The slope of the hydraulic gradient line indicates the direction and rate of flow of water.
It is used in analyzing flow patterns and d...
Methods for managing floods include structural measures, non-structural measures, and preparedness planning.
Structural measures include building dams, levees, and flood walls to control water flow.
Non-structural measures involve land-use planning, zoning regulations, and wetland preservation to reduce flood risk.
Preparedness planning includes early warning systems, evacuation plans, and community education on flood saf...
Prestressed concrete is a type of concrete that has been compressed prior to being subjected to loads.
Prestressed concrete is created by introducing internal stresses in the concrete before it is subjected to external loads.
This compression helps to counteract the tensile stresses that the concrete will experience during use.
Prestressed concrete is commonly used in bridges, parking structures, and high-rise buildings.
E...
A flood wall is a structure designed to prevent flooding by holding back water.
Flood walls are typically made of concrete, steel, or other strong materials.
They are commonly used along rivers, coastlines, and other areas prone to flooding.
Flood walls can vary in height and design depending on the level of protection needed.
Examples of flood walls include the Thames Barrier in London and the flood walls along the Missis
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
The hydrotest pressure is 1.5 times the design pressure.
Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.
It is usually done before commissioning the system.
For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.
The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.
Classify the base metal
Clean the surface
Align the parts to be joined
Check the root gap and root face
Measure the bevel angle
Check for any mismatch or overlap
Ensure all specifications are met
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
100
salaries
| ₹2 L/yr - ₹6 L/yr |
Civil Site Engineer
82
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
77
salaries
| ₹4.1 L/yr - ₹8 L/yr |
Junior Engineer
39
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Junior Engineer Civil
36
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
L & W Constructions