Q1. What is the procedure to define one way and two way slab.How you will fix the reinforcement for two way slab
To define one way and two way slab, we follow different procedures. For two way slab, reinforcement is fixed in both directions.
One way slab is defined as the slab in which the ratio of longer span to shorter span is greater than or equal to 2.
Two way slab is defined as the slab in which the ratio of longer span to shorter span is less than 2.
For two way slab, reinforcement is fixed in both directions to distribute the load uniformly.
The reinforcement is placed in the form of...read more
Q2. 1.Sequence from excavation to structure completion. 2.If you have done aluminium formwork exolain the sequence and all the components. 3.Rates of all items. 4.Area of site(built up area) 5.Basics in civil engin...
read moreInterview questions for Sr. Engineer-Projects related to civil engineering projects and basics.
Sequence from excavation to structure completion
Explanation of aluminium formwork sequence and components
Rates of all items
Built-up area of site
Basics in civil engineering like one way and two way slab differences
Steel diameters used
Q3. Which grade of concrete normal use for rcc
The grade of concrete normally used for RCC is M20.
The grade of concrete for RCC (Reinforced Cement Concrete) is determined based on the design requirements and structural considerations.
The most commonly used grade of concrete for RCC is M20, which means the concrete mix has a compressive strength of 20 megapascals (MPa) after 28 days of curing.
Other grades of concrete like M25, M30, M35, etc., can also be used depending on the specific project requirements and structural de...read more
Q4. What is the duration for deshuttering a beam of span 4 mtr
The duration for deshuttering a beam of span 4 mtr depends on various factors.
The type of formwork used for shuttering the beam
The strength of the concrete used
The ambient temperature and humidity
The curing process followed
The complexity of the beam design
The availability of manpower and equipment
Typically, deshuttering can take anywhere from 7 to 21 days for a beam of span 4 mtr
Q5. Before starting tiles work what kind of checking you will do
Before starting tiles work, I will check the surface for any cracks, levelness, and moisture content.
Check for any cracks or damages on the surface
Ensure the surface is level and free from any bumps or depressions
Check the moisture content of the surface to ensure it is within acceptable limits
Verify that the surface is clean and free from any debris or contaminants
Check the type of adhesive and grout to be used and ensure they are suitable for the surface and tiles
Q6. How to manage the finishing activity How will manage single project How will plan the project completion
To manage finishing activity, plan and monitor project completion
Create a detailed project plan with timelines and milestones
Assign responsibilities and roles to team members
Monitor progress regularly and make adjustments as needed
Ensure quality control measures are in place
Communicate with stakeholders regularly to keep them informed
Use project management software to track progress and manage tasks
Conduct regular meetings with the team to discuss progress and address any iss...read more
Share interview questions and help millions of jobseekers 🌟
Q7. What are the pre initiative action for start pilling
Pre-initiative actions for start piling
Conduct a geotechnical investigation to assess soil conditions
Obtain necessary permits and approvals from local authorities
Develop a detailed piling plan and schedule
Procure required piling equipment and materials
Ensure safety measures are in place for workers and surrounding areas
Prepare the site by clearing any obstacles or debris
Establish proper communication channels with stakeholders
Train and educate the project team on piling techn...read more
Q8. Construction of buildings and structural works with adesigination of sr CIVIL ENGINEERING WITH BUILDINGS AND BRIDGES AND INFRA STRUCTURAL WORKS with the job to civil construction industry and government contrac...
read moreThe job involves construction of buildings, bridges, and infrastructure works for civil construction industry and government contracts.
The job requires expertise in civil engineering and construction management.
Responsibilities include overseeing the construction process, managing budgets and timelines, and ensuring compliance with safety regulations.
Examples of infrastructure works include roads, water supply systems, and sewage treatment plants.
The job may involve working w...read more
Sr.Engineer-Projects Jobs
Q9. Why you want to choose Site execution even after doing MBA
I believe in hands-on experience and want to apply my MBA knowledge in practical fieldwork.
I value the importance of practical experience in addition to theoretical knowledge
I want to apply my management skills in a real-world setting
I enjoy the challenges and problem-solving opportunities that come with site execution
I believe in the importance of teamwork and collaboration in achieving project success
I am excited about the opportunity to learn and grow in a dynamic and fast...read more
Q10. One 2bhk flat how many cail cable we want
The number of cail cables required for a 2bhk flat depends on various factors such as the size of the flat, the number of rooms, and the electrical layout.
The size of the flat and the number of rooms will determine the length of the cables required.
The electrical layout will determine the number of cables required for each room.
On average, a 2bhk flat may require around 200-300 meters of cail cable.
It is best to consult with an electrician to determine the exact number of cab...read more
Q11. Tell DTR structure material, 1 km HT material requirement
DTR structure material is steel and 1 km HT material requirement depends on the voltage level
DTR structure material is typically made of steel
1 km HT material requirement varies depending on the voltage level
For example, for a 33 kV line, the HT material requirement would be around 3 km
Q12. how to laying the tiles, plastering and painting work
Laying tiles, plastering, and painting require proper surface preparation, tools, and techniques.
Ensure the surface is clean, dry, and level before laying tiles.
Use a notched trowel to spread adhesive evenly and lay tiles in a staggered pattern.
For plastering, mix plaster with water to a smooth consistency and apply in thin layers using a trowel.
Sand the surface after each layer dries and apply subsequent layers until desired thickness is achieved.
For painting, prepare the su...read more
Q13. Difficulty in execution work. Grade and streanth of concrete.
Difficulty in execution work can arise due to various factors including grade and strength of concrete.
The grade and strength of concrete must be carefully selected based on the requirements of the project.
Inadequate curing of concrete can lead to lower strength and durability.
The use of improper mix proportions can also result in weaker concrete.
The quality of raw materials used in concrete production can affect its strength and durability.
Proper testing and quality control ...read more
Q14. which are you strong in structural or finishing
I am strong in both structural and finishing aspects of projects.
I have a strong foundation in structural engineering principles and have successfully designed and managed the construction of several large-scale structures.
I also have experience in finishing work, including interior design and landscaping.
I believe that having a well-rounded skill set is important in delivering successful projects.
For example, in my previous project, I was responsible for both the structural ...read more
Q15. What are the Types of NDT test?
Non-Destructive Testing (NDT) includes various methods to inspect materials and components without causing damage.
Visual Inspection
Ultrasonic Testing
Radiographic Testing
Magnetic Particle Testing
Liquid Penetrant Testing
Eddy Current Testing
Q16. unit wait of cement and initial setting time
Unit weight of cement refers to its density, while initial setting time is the time it takes for cement to harden.
Unit weight of cement is typically measured in kilograms per cubic meter (kg/m³).
It indicates the compactness of cement particles and affects the strength and durability of concrete.
The unit weight of cement can vary depending on factors like the type of cement and its fineness.
For example, ordinary Portland cement typically has a unit weight of around 1440 kg/m³....read more
Q17. What are all the testing of steel
Steel testing includes mechanical, chemical, and physical tests to ensure quality and safety.
Mechanical tests include tensile, compression, and impact tests to measure strength and toughness.
Chemical tests analyze the composition of the steel to ensure it meets required standards.
Physical tests include hardness, corrosion resistance, and fatigue tests to assess durability and performance.
Non-destructive testing methods like ultrasonic testing and magnetic particle inspection ...read more
Q18. How to prepare BBS of slab?
BBS of slab can be prepared by following a systematic process.
Calculate the quantity of steel required for the slab.
Determine the spacing of bars and their diameter.
Prepare a detailed drawing of the slab with all the necessary details.
Mark the position of bars on the drawing.
Prepare a bar bending schedule (BBS) based on the drawing.
Ensure that the BBS is accurate and complete before starting the work.
Q19. What is Civil Engineer can do?
Civil Engineers design, build, and maintain infrastructure projects such as roads, bridges, buildings, and water systems.
Design and plan infrastructure projects
Ensure projects meet safety and environmental regulations
Manage construction and maintenance of projects
Collaborate with architects, contractors, and other professionals
Use computer-aided design (CAD) software to create plans and blueprints
Perform site investigations and surveys
Estimate project costs and timelines
Speci...read more
Q20. Infrastructure development and its techniques.
Infrastructure development involves planning, designing, constructing, and maintaining physical structures and facilities.
Infrastructure development includes transportation systems, buildings, water supply networks, and communication networks.
Techniques used in infrastructure development include project management, cost estimation, risk assessment, and environmental impact assessment.
Examples of infrastructure development projects include the construction of highways, airport...read more
Q21. Concrete specifications and mixing procedures
Concrete specifications and mixing procedures
Concrete specifications include strength, slump, air content, and maximum aggregate size
Mixing procedures involve proper proportioning of materials, thorough mixing, and appropriate curing
Concrete should be mixed for at least 2 minutes and not more than 5 minutes
Water-cement ratio should be maintained as per the specifications
Admixtures can be added to improve the properties of concrete
Q22. How to manage site Safety management
Site safety management involves identifying and mitigating potential hazards to ensure a safe work environment.
Conduct regular safety audits and inspections
Provide safety training to all workers
Implement safety protocols and procedures
Ensure proper use of personal protective equipment
Encourage reporting of safety concerns and incidents
Q23. Sewerage System - Design Standards
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
Q24. Least count of varnier caliper
Least count of vernier caliper is the smallest measurement that can be read accurately.
It is determined by the number of divisions on the vernier scale and the main scale.
For example, if the main scale has 10 divisions and the vernier scale has 9 divisions, the least count would be 0.1 mm.
It is important to use the correct least count when taking measurements to ensure accuracy.
Q25. Reason to switchover
The reason to switchover is to explore new opportunities and challenges.
To gain new experiences and skills
To work with new technologies and tools
To broaden professional network
To seek better compensation and benefits
To find a better work-life balance
To escape a toxic work environment
To pursue a passion or interest
To relocate to a new city or country
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month