i
B.L. Kashyap & Sons
Filter interviews by
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
Answering questions related to Civil Site Engineering
Slump is a measure of the consistency of concrete
Concrete ratio refers to the proportion of cement, sand, and aggregate in the mix
Curves on roads are provided to ensure safe and smooth traffic flow
Construction joints are used to allow for expansion and contraction of concrete due to temperature changes
EHS stands for Environment, Health, and Safety.
EHS is a field that focuses on ensuring the well-being of individuals and the environment in various industries.
It involves identifying and managing potential hazards, implementing safety protocols, and promoting sustainable practices.
EHS professionals work to prevent accidents, protect workers' health, and minimize environmental impact.
Examples of EHS initiatives include ...
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
B.L. Kashyap & Sons interview questions for popular designations
I applied via Walk-in
Get interview-ready with Top B.L. Kashyap & Sons Interview Questions
I applied via A fath fully job yours regards and was interviewed in Jan 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed before May 2017. There were 4 interview rounds.
The BOCW Act 1996 mandates legal requirements for the safety and welfare of construction workers.
The Act applies to all establishments with 10 or more construction workers.
It requires the registration of establishments and the appointment of safety officers.
It mandates the provision of safety equipment, first aid facilities, and welfare amenities.
It also requires the payment of compensation in case of injury or death o...
I applied via Naukri.com
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.
Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.
Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.
The quantity of shuttering material required also depends on the type of formwork used, su...
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 3 interview rounds.
Yes
Yes, I have extensive work experience in mechanical ss, ms, cs, cw, fire, HVAC, boiler piping, and tank structures.
I have worked on various projects involving the fabrication and installation of light and heavy structures, including railway bridge installation.
I am experienced in working with different materials such as stainless steel (ss), mild steel (ms), and carbon steel (cs).
I have knowledge and expertise in th...
Top trending discussions
The duration of B.L. Kashyap & Sons interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 52 interviews
Interview experience
based on 495 reviews
Rating in categories
Site Engineer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Larsen & Toubro Limited
Shapoorji Pallonji Group