Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by B.L. Kashyap & Sons Team. If you also belong to the team, you can get access from here

B.L. Kashyap & Sons Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

B.L. Kashyap & Sons Interview Questions, Process, and Tips

Updated 12 Feb 2025

Top B.L. Kashyap & Sons Interview Questions and Answers

View all 29 questions

B.L. Kashyap & Sons Interview Experiences

Popular Designations

47 interviews found

Interview Questions & Answers

user image Anonymous

posted on 25 Oct 2022

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related Electrical and Safety
  • Q2. Q. What types of cause of accident in construction ? Ans. 1. Erection equipment Failure 2. Falling of persons from Height 3. Electric Shock 4. Poor illumination 5. Non...

Interview Preparation Tips

Topics to prepare for B.L. Kashyap & Sons interview:
  • Electrical Engineering
  • Safety Officer Activities
Interview preparation tips for other job seekers - I will give good training to the worker and improve the engineering control so that there is no accident in the company.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding RMC and costing.
  • Ans. RMC - Ready mixed concrete start from Grade M10 to M55 of ordinary concrete and specially self compacting concrete for congested reinforcement areas.It is controlled concrete production using weigh batch for aggregates , admixture and water to ensure good results. Cost differ as per transporting distance. To minimise cost and time site batching plant is preferred for concrete requirement of 5000 m3 per month atleast.
  • Answered Anonymously
  • Q2. Regarding checklist for preparation works for finishing start from plaster, flooring, joineries and painting etc.
  • Ans. Surface should be free from laitance and other foreign matters. Joineries and other first fix items shall be fixed viz. doors conduits plumbing and electrical boxes etc. Level pads are to be provided to ensure uniform surface finish.Moisture test is to be done for damp free surface before painting walls and ceilings.finally sanitary and plumbing fixtures are to be fixed.
  • Answered Anonymously
Round 3 - One-on-one 

(2 Questions)

  • Q1. What do you mean to by Zero budget ?
  • Ans. 

    Zero budget refers to a financial plan where no funds are allocated or spent.

    • Zero budgeting involves starting from scratch and justifying every expense.

    • It encourages cost-consciousness and prioritization of resources.

    • Example: A project coordinator using zero budgeting would need to justify every expense, ensuring that it aligns with project goals and delivers value.

  • Answered by AI
  • Q2. Zero budget means actual dry cost of materials manpower water and electricity machine and tools involved in completing each and every items of works involved in the construction.
  • Ans. 

    Zero budget refers to the actual cost of materials, manpower, water, electricity, and tools required for each construction task.

    • Zero budget refers to the direct costs involved in completing each item of work in construction.

    • It includes the cost of materials, such as cement, steel, and bricks.

    • Manpower costs, including wages and salaries of workers, are also part of the zero budget.

    • Water and electricity costs required fo...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for B.L. Kashyap & Sons Project Coordinator interview:
  • Technical Skills
  • Concrete
  • Structural engineering basics
  • Planning
  • Project Communications
  • Budgeting and costing
  • Quality and Safety
  • Computer Skills
Interview preparation tips for other job seekers - Know thorough technical and practical aspects and enhance skills involving construction techniques and know in tips about market rates and updates on industry.

Project Coordinator Interview Questions asked at other Companies

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)
B.L. Kashyap & Sons Interview Questions and Answers for Freshers
illustration image

Interview Questions & Answers

user image Anonymous

posted on 12 Feb 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Aptitude Test 

All test laboratory testing field test and concrete density test

Round 2 - Coding Test 

FDD test 2720 part 1 -41

Interview Preparation Tips

Interview preparation tips for other job seekers - Concrete pouring clyinder volume check
And dlbd test

Site Engineer Interview Questions & Answers

user image ahmad equbal

posted on 28 Jan 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Difference between lap length and development length
  • Ans. 

    Lap length is the overlap of reinforcement bars in concrete, while development length is the length of bar required to transfer stress to concrete.

    • Lap length is used to ensure continuity of reinforcement across a joint or splice in concrete elements.

    • Development length is required to develop the full strength of the reinforcement bar and transfer it to the surrounding concrete.

    • Lap length is typically specified in terms ...

  • Answered by AI
  • Q2. Solid block size 400*400*200mm what is the weight and define
  • Ans. 

    The weight of a solid block with dimensions 400*400*200mm depends on the material it is made of.

    • The weight can be calculated by multiplying the volume of the block by the density of the material.

    • Different materials have different densities, so the weight will vary depending on the material.

    • To calculate the volume, multiply the length, width, and height of the block.

    • To find the weight, multiply the volume by the density...

  • Answered by AI

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

B.L. Kashyap & Sons interview questions for popular designations

 Civil Site Engineer

 (3)

 Planning Engineer

 (2)

 Accountant

 (2)

 General Manager Project

 (2)

 Site Engineer

 (2)

 Assistant Project Manager

 (1)

 Senior Engineer

 (1)

 Junior Engineer

 (1)

First Aider Interview Questions & Answers

user image Anonymous

posted on 4 Dec 2023

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about CPR
  • Q2. How many years experience in nursing field

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

First Aider Interview Questions asked at other Companies

Q1. 1.What is cpr? 2.How to control bleeding from human if he got injured. 3.what medicene and accessories we have in first aid kit. 4.how to counselling a person who is in depression.
View answer (2)

Get interview-ready with Top B.L. Kashyap & Sons Interview Questions

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 
Round 3 - Technical 

(1 Question)

  • Q1. Technical and execution like structures
Round 4 - HR 

(1 Question)

  • Q1. Share details of your previous job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Now i am doing in metro viaduct BMRCL SNC construction

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Jobs at B.L. Kashyap & Sons

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. General about your present and past projects background
Round 3 - Technical 

(1 Question)

  • Q1. There ware discussed general civil Engg based on codes / specifications those we are using at site in day to day working .

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready for daily use P&M in detail rather then codes / specifications based civil engg.

General Manager Project Interview Questions asked at other Companies

Q1. What is the bending radius of EHV cables?
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Group Discussion 

About your position.

Round 3 - Technical 

(2 Questions)

  • Q1. About is code use in concrete
  • Q2. IS 456 2000

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Basic civil questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls be prepare accordingly to job requirements

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

DGM-Projects Interview Questions & Answers

user image Anonymous

posted on 4 Apr 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How to calculate dry cost of Projects
  • Ans. 

    The dry cost of a project can be calculated by subtracting the cost of materials and equipment from the total project cost.

    • Determine the total project cost by adding up all the expenses, including labor, materials, equipment, and overhead costs.

    • Identify the cost of materials and equipment used in the project.

    • Subtract the cost of materials and equipment from the total project cost to obtain the dry cost.

    • Dry cost = Total

  • Answered by AI
  • Q2. What is rolling margin of steel
  • Ans. 

    Rolling margin of steel refers to the difference between the initial thickness of a steel plate and its final thickness after undergoing the rolling process.

    • Rolling margin is a measure of the reduction in thickness that occurs during the rolling process.

    • It is calculated by subtracting the final thickness of the steel plate from its initial thickness.

    • The rolling margin is influenced by factors such as the type of steel,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare a complete project schedule, labour resources, rate analysis

DGM-Projects Interview Questions asked at other Companies

Q1. How to calculate dry cost of Projects
View answer (2)
Contribute & help others!
anonymous
You can choose to be anonymous

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons interview?
B.L. Kashyap & Sons interview process usually has 2-3 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are Technical, HR and Resume Shortlist.
How to prepare for B.L. Kashyap & Sons interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at B.L. Kashyap & Sons. The most common topics and skills that interviewers at B.L. Kashyap & Sons expect are Project Management, Bbs, Execution, Civil Engineering and Construction.
What are the top questions asked in B.L. Kashyap & Sons interview?

Some of the top questions asked at the B.L. Kashyap & Sons interview -

  1. Q. What types of cause of accident in construction ? Ans. 1. Erection equipme...read more
  2. Zero budget means actual dry cost of materials manpower water and electricity m...read more
  3. What is the amount of lime in ceme...read more
How long is the B.L. Kashyap & Sons interview process?

The duration of B.L. Kashyap & Sons interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

JOBS

B.L. Kashyap & Sons

No Jobs

SALARIES

Forbes & Company

JOBS

Eshopbox Ecommerce

No Jobs

INTERVIEWS

Forbes & Company

No Interviews

SALARIES

Eshopbox Ecommerce

SALARIES

Tamilnadu Petroproducts

INTERVIEWS

Eshopbox Ecommerce

No Interviews

SALARIES

B.L. Kashyap & Sons

SALARIES

Forbes & Company

Tell us how to improve this page.

B.L. Kashyap & Sons Interview Process

based on 52 interviews

Interview experience

4.3
  
Good
View more

B.L. Kashyap & Sons Reviews and Ratings

based on 497 reviews

3.7/5

Rating in categories

3.5

Skill development

3.5

Work-life balance

3.2

Salary

3.8

Job security

3.4

Company culture

3.2

Promotions

3.5

Work satisfaction

Explore 497 Reviews and Ratings
IR Executive

Bangalore / Bengaluru

6-10 Yrs

Not Disclosed

Senior Officer - HSE

Bangalore / Bengaluru

6-10 Yrs

Not Disclosed

Assistant General Manager - Quality

Bangalore / Bengaluru

12-18 Yrs

Not Disclosed

Explore more jobs
Site Engineer
100 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
82 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
39 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Ahluwalia Contracts India

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview