I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Top trending discussions
posted on 25 Jan 2025
I was interviewed in Dec 2024.
The interview was thorough and challenging, with a focus on leadership experience and problem-solving skills.
Discussed previous leadership roles and how I handled challenging situations
Gave examples of successful projects I managed and the outcomes
Talked about my problem-solving approach and strategies
Asked about my vision for the team and how I would drive success
I had a positive experience with the work culture in my previous job.
Encouraged collaboration and teamwork
Open communication between employees and management
Emphasis on work-life balance
Recognition and appreciation for hard work
Supportive and inclusive environment
I have over 10 years of experience in senior management roles, leading teams and driving strategic initiatives.
Led cross-functional teams to successfully launch new products
Implemented cost-saving measures resulting in a 15% increase in profitability
Developed and executed strategic plans to drive business growth
Managed key client relationships and negotiated contracts
Yes, I am open to relocating for the right opportunity.
I am open to relocating for the right opportunity
I have relocated for previous roles and am comfortable with the process
I am excited about the possibility of experiencing a new location and culture
posted on 8 Jul 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.
Calculate the total length of the transmission line needed
Estimate the cost of materials such as cables, poles, insulators, and connectors
Factor in labor costs for installation and maintenance
Include equipment costs for specialized tools and machinery
Consider overhead costs such as permits, land acq...
Execution of transmission line involves planning, design, construction, and maintenance of power lines.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining the type of towers, conductor size, and insulator selection.
Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.
Maintenance include...
posted on 15 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
My current Cost To Company is $120,000 per year.
My current Cost To Company includes my salary, benefits, bonuses, and any other compensation provided by the company.
It is important to consider the total value of all components of the compensation package when discussing Cost To Company.
For example, my salary is $100,000 per year, with an additional $20,000 in benefits and bonuses.
The Cost To Company may vary based on i
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
posted on 17 Jun 2023
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 27 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There was 1 interview round.
Numerical reasoning and verbal reasoning followed by psychometric assessment.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
posted on 5 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Larsen & Toubro Limited
Shapoorji Pallonji Group