Filter interviews by
I applied via Approached by Company
Yes, code is a mode of measurement used in quantity surveying.
Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.
It helps in accurately estimating the quantities of materials and labor required for a project.
Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme
Top trending discussions
posted on 21 Dec 2024
I was interviewed before Dec 2023.
The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.
The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.
It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.
The purpose of the standard deduction is...
Material properties refer to the characteristics and behavior of materials used in construction projects.
Material properties include density, strength, durability, thermal conductivity, and elasticity.
Understanding material properties is crucial for selecting the right materials for a project.
Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.
posted on 8 May 2024
I applied via Newspaper Ad and was interviewed in Nov 2023. There was 1 interview round.
posted on 6 Jul 2024
I applied via Approached by Company and was interviewed in Aug 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
I was interviewed in Aug 2017.
posted on 24 Sep 2022
I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.
Some basic questions of mathematics up to 10th class.
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 5 interview rounds.
It was around 5-10 minutes online test.
The percentage of wastage varies depending on the project and materials used.
The percentage of wastage can be calculated by dividing the amount of material wasted by the total amount of material used and multiplying by 100.
Factors that can contribute to wastage include poor planning, inaccurate measurements, and human error.
The percentage of wastage can be reduced through careful planning, accurate measurements, and pr...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
114
salaries
| ₹3.5 L/yr - ₹9.4 L/yr |
Civil Engineer
110
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Site Engineer
90
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Civil Site Engineer
82
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
Engineer
70
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited
Punj Lloyd