I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
What people are saying about AECOM
I appeared for an interview in Aug 2017.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
based on 24 reviews
Rating in categories
Project Engineer
230
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
196
salaries
| ₹7.7 L/yr - ₹28 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹10.5 L/yr |
Associate Director
133
salaries
| ₹24 L/yr - ₹49 L/yr |
Architect
130
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AtkinsRealis