Upload Button Icon Add office photos

Filter interviews by

Hindustan Construction Company Interview Questions, Process, and Tips

Updated 5 Jan 2025

Top Hindustan Construction Company Interview Questions and Answers

View all 71 questions

Hindustan Construction Company Interview Experiences

Popular Designations

77 interviews found

I applied via LinkedIn and was interviewed in Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

What is your greatest Strength

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare everything about maintenance PQC RECTIFICATION.

General Manager Interview Questions asked at other Companies

Q1. If we do 100% Banking, End of the Month Bank gives us Statement, Which account can be easily tracked from the Statement
View answer (2)

Project Engineer Interview Questions & Answers

user image Gurneet Singh

posted on 10 Mar 2021

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    Top Hindustan Construction Company Project Engineer Interview Questions and Answers

    Q1. How much asscelerate we used in shotcrete
    View answer (1)

    Project Engineer Interview Questions asked at other Companies

    Q1. Triangle Star PatternPrint the following pattern for the given N number of rows. Pattern for N = 4 * ** *** **** Note : There are no spaces between the stars (*). Input format : Integer N (Total no. of rows) Output format : Pattern in N l... read more
    View answer (9)

    Interview Questionnaire 

    2 Questions

    • Q1. Whats ur work, hav u ever done health inspection, do u use sap, hav u ever seen dismantle Engine,
    • Q2. Hv u done pre maintenance of equipment, or track status , full details of maintenance
    • Ans. 

      Yes, I have done pre-maintenance of equipment and tracked maintenance status.

      • I have conducted regular inspections of equipment to identify potential issues before they become major problems.

      • I have kept detailed records of maintenance activities, including dates, tasks performed, and any issues encountered.

      • I have worked with maintenance teams to develop and implement preventative maintenance plans.

      • I have used software t...

    • Answered by AI

    Junior Mechanical Engineer Interview Questions asked at other Companies

    Q1. How to improve cycle time and how to do rejection control
    View answer (1)

    Interview Questionnaire 

    1 Question

    • Q1. What is cash flow and balance sheet and bank book with MIS Knowledge Best Knowledge of SAP Fi Module ?

    Accounts Officer Interview Questions asked at other Companies

    Q1. How can you handle entire accounts section give me some examples?
    View answer (9)

    Hindustan Construction Company interview questions for popular designations

     Site Engineer

     (9)

     Civil Site Engineer

     (8)

     Civil Site Engineer & Site Incharge

     (2)

     Engineer Trainee

     (2)

     HSE Engineer

     (2)

     Lab Incharge

     (2)

     Mechanical Engineer

     (2)

     Quality Engineer

     (2)

    I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

    Round 1 - Technical 

    (4 Questions)

    • Q1. Finishing construction
    • Q2. All internal finishing work
    • Q3. All internal finishing work done
    • Q4. Plz Job me sir sr supervisor finishing construction
    Round 2 - Technical 

    (4 Questions)

    • Q1. All internal finishing work
    • Q2. All'internel finishing work
    • Q3. Sr supervisor finishing construction
    • Q4. Sr supervisor finishing construction of
    Round 3 - HR 

    (2 Questions)

    • Q1. Work update work mumbai
    • Q2. Experience in Mumbai

    Interview Preparation Tips

    Topics to prepare for Hindustan Construction Company Finishing Supervisor,interior Site Supervisor interview:
    • Dyes
    Interview preparation tips for other job seekers - Sr supervisor finishing construction

    Finishing Supervisor,interior Site Supervisor Interview Questions asked at other Companies

    Q1. Implantation of mast to rail Difference between isolater and insulater How many types of foundation How many types of mast What is the hight of contact wire to rail level What is acc What do you mean by across the track and along the track ... read more
    View answer (1)

    Get interview-ready with Top Hindustan Construction Company Interview Questions

    I applied via Approached by Company and was interviewed before May 2017. There were 4 interview rounds.

    Interview Questionnaire 

    3 Questions

    • Q1. I was asked I will be able to get the assigned task done with the team I am provided. What is field quality plan and checklists to be followed for different activities.
    • Q2. They asked particularly about my previous work experience and my salary.
    • Q3. They asked regarding concrete mix design, different IS codes, mix ratios and different tests to be performed on materials.

    Interview Preparation Tips

    Share your past experiences boldly and with confidence.

    Quaity Control Engineer Interview Questions asked at other Companies

    Q1. How to make projection of I section and find strength of Isection?
    View answer (1)

    Jobs at Hindustan Construction Company

    View all

    Site Engineer Interview Questions & Answers

    user image Anonymous

    posted on 28 Dec 2021

    I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

    Interview Questionnaire 

    5 Questions

    • Q1. What a term of Rolling margin on a steel?
    • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
    • Answered Anonymously
    • Q2. Initial setting time of cement
    • Ans. 

      Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

      • Initial setting time is determined by Vicat apparatus

      • It is the time taken for the cement to lose its plasticity and become hard

      • The standard initial setting time for ordinary Portland cement is 30 minutes

      • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

    • Answered by AI
    • Q3. Elongation % of steel fy 500
    • Ans. 

      The elongation % of steel fy 500 is approximately 12%.

      • Elongation % is the measure of ductility of a material.

      • It is the percentage increase in length of a material before it fractures under tension.

      • For steel fy 500, the elongation % is approximately 12%.

      • This means that the steel can stretch up to 12% of its original length before it breaks.

    • Answered by AI
    • Q4. How much bag of cement in 1 cubic meter
    • Ans. 

      The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

      • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

      • The mix design specifies the ratio of cement to other materials like sand and aggregates.

      • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

      • It is important to accurately calculate ...

    • Answered by AI
    • Q5. How much density of material Steel Concrete Sand
    • Ans. 

      Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

      • Density of steel is higher than that of concrete and sand

      • Density of concrete varies depending on the mix design

      • Density of sand can vary depending on the source and moisture content

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

    Top Hindustan Construction Company Site Engineer Interview Questions and Answers

    Q1. What a term of Rolling margin on a steel?
    View answer (7)

    Site Engineer Interview Questions asked at other Companies

    Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
    View answer (2)

    I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
    View all tips
    Round 2 - Technical 

    (1 Question)

    • Q1. Type of maintenance of construction machinery.
    • Ans. 

      The types of maintenance for construction machinery include preventive, corrective, and predictive maintenance.

      • Preventive maintenance involves regularly scheduled inspections, cleaning, and servicing to prevent breakdowns and extend the lifespan of the machinery.

      • Corrective maintenance is performed when a machine breaks down or malfunctions, and it involves repairing or replacing faulty components.

      • Predictive maintenance...

    • Answered by AI
    Round 3 - HR 

    (2 Questions)

    • Q1. Your expected salary.
    • Q2. Is your expeected salary negotiable.
    • Ans. 

      Yes, my expected salary is negotiable.

      • Express willingness to negotiate salary

      • Highlight flexibility in terms of compensation

      • Provide examples of previous successful salary negotiations

    • Answered by AI

    Interview Preparation Tips

    Topics to prepare for Hindustan Construction Company Mechanical Engineer interview:
    • Maintenance of construction mach
    • Graduate with mechanical engineering
    Interview preparation tips for other job seekers - We can count expected salary should be 30% hike from current drawn salary.

    Mechanical Engineer Interview Questions asked at other Companies

    Q1. What we need to do if pressure valve fail in boiler
    View answer (8)

    Interview Questionnaire 

    1 Question

    • Q1. Question are based on present CV experience.

    Information System Officer Interview Questions & Answers

    user image Sambit Kumar Sahoo

    posted on 15 Feb 2021

    Interview Questionnaire 

    3 Questions

    • Q1. System network
    • Q2. Desktop issues. Server issues
    • Q3. It security

    Hindustan Construction Company Interview FAQs

    How many rounds are there in Hindustan Construction Company interview?
    Hindustan Construction Company interview process usually has 2-3 rounds. The most common rounds in the Hindustan Construction Company interview process are Technical, Resume Shortlist and HR.
    How to prepare for Hindustan Construction Company interview?
    Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Hindustan Construction Company. The most common topics and skills that interviewers at Hindustan Construction Company expect are Arbitration, Planning, Budgeting, Contracts and Scheduling.
    What are the top questions asked in Hindustan Construction Company interview?

    Some of the top questions asked at the Hindustan Construction Company interview -

    1. What a term of Rolling margin on a stee...read more
    2. What is variation clause, Price variation, value engineering, suspension as per...read more
    3. Why price variation clause is required in contra...read more
    How long is the Hindustan Construction Company interview process?

    The duration of Hindustan Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.

    Tell us how to improve this page.

    Hindustan Construction Company Interview Process

    based on 70 interviews

    Interview experience

    4.3
      
    Good
    View more

    Interview Questions from Similar Companies

    Tata Projects Interview Questions
    4.2
     • 406 Interviews
    GMR Group Interview Questions
    4.1
     • 76 Interviews
    GAMMON INDIA Interview Questions
    3.9
     • 29 Interviews
    Punj Lloyd Interview Questions
    4.4
     • 18 Interviews
    View all

    Hindustan Construction Company Reviews and Ratings

    based on 1.1k reviews

    4.2/5

    Rating in categories

    4.1

    Skill development

    3.9

    Work-life balance

    3.8

    Salary

    4.1

    Job security

    4.1

    Company culture

    3.6

    Promotions

    3.9

    Work satisfaction

    Explore 1.1k Reviews and Ratings
    TBM Incharge For Hydro Project in Uttarakhand

    Uttarkashi

    15-24 Yrs

    Not Disclosed

    Project Planning & Controls Head

    Haridwar,

    Dehradun

    15-25 Yrs

    Not Disclosed

    Explore more jobs
    Site Engineer
    217 salaries
    unlock blur

    ₹2.4 L/yr - ₹7 L/yr

    Civil Site Engineer
    180 salaries
    unlock blur

    ₹2.3 L/yr - ₹8 L/yr

    Quantity Surveyor
    55 salaries
    unlock blur

    ₹3.5 L/yr - ₹7.2 L/yr

    Senior Planning Engineer
    53 salaries
    unlock blur

    ₹5 L/yr - ₹8.6 L/yr

    Manager
    47 salaries
    unlock blur

    ₹9.7 L/yr - ₹19.5 L/yr

    Explore more salaries
    Compare Hindustan Construction Company with

    Larsen & Toubro Limited

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    Shapoorji Pallonji Group

    4.1
    Compare

    GAMMON INDIA

    3.9
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview