I applied via LinkedIn and was interviewed in Oct 2021. There were 2 interview rounds.
What is your greatest Strength
I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.
Cutting 150 hill in 60 degree slope requires careful planning and execution.
Conduct a thorough survey of the area to determine the best approach
Use heavy machinery such as excavators and bulldozers to remove the hill
Ensure safety measures are in place to prevent accidents
Consider environmental impact and take necessary precautions
Consult with experts in the field for advice and guidance
Protection in 150m height can be achieved through various means.
Use of safety harness and fall protection equipment
Installation of guardrails and safety nets
Implementation of a comprehensive safety plan
Regular inspection and maintenance of equipment
Training and education of workers on safety procedures
The grade of bitumen used in hill areas depends on the temperature and altitude of the region.
The higher the altitude, the harder the bitumen used.
The temperature also plays a crucial role in determining the grade of bitumen.
For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.
In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform
Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.
Use a mix design with low water-cement ratio and proper amount of cement and admixtures.
Ensure proper curing by covering the concrete with blankets or insulating materials.
Protect the concrete from freezing by using heaters or insulating blankets.
Monitor the temperature of the concrete and the environment during and after p...
Cavity in tunnels can be protected by using various methods.
Waterproofing the tunnel lining
Using grouting techniques to fill the cavity
Installing drainage systems to prevent water accumulation
Regular inspections and maintenance
Using shotcrete to reinforce the tunnel lining
Applying rock bolts to stabilize the surrounding rock
Using steel ribs to support the tunnel lining
Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.
Cycle time can vary depending on the type of tunnel and the process being carried out.
For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.
In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.
Ef...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction.
NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.
It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.
NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.
Examples ...
The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.
The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.
Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.
It is important to carefully plan and execute ...
Proholes is not a known term in engineering. No data available.
Drain holes are necessary to prevent water accumulation and damage to structures or equipment.
Drain holes allow water to escape from areas where it can cause damage or corrosion.
They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.
Drain holes can also be used in machinery to prevent damage from water or other liquids.
Proper placement and size of drain holes is important to ens
The amount of accelerator used in shotcrete depends on various factors.
The type of accelerator used affects the amount required.
The desired strength and setting time also play a role.
The ambient temperature and humidity can affect the amount needed.
Typically, 1-5% of the cement weight is used as accelerator.
The manufacturer's recommendations should be followed for best results.
Yes, I have done pre-maintenance of equipment and tracked maintenance status.
I have conducted regular inspections of equipment to identify potential issues before they become major problems.
I have kept detailed records of maintenance activities, including dates, tasks performed, and any issues encountered.
I have worked with maintenance teams to develop and implement preventative maintenance plans.
I have used software t...
Hindustan Construction Company interview questions for popular designations
posted on 15 May 2022
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
Get interview-ready with Top Hindustan Construction Company Interview Questions
I applied via Approached by Company and was interviewed before May 2017. There were 4 interview rounds.
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is determined by Vicat apparatus
It is the time taken for the cement to lose its plasticity and become hard
The standard initial setting time for ordinary Portland cement is 30 minutes
Factors affecting initial setting time include temperature, water-cement ratio, and type of cement
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
The amount of cement required for 1 cubic meter varies depending on the concrete mix design.
The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.
The mix design specifies the ratio of cement to other materials like sand and aggregates.
For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.
It is important to accurately calculate ...
Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3
Density of steel is higher than that of concrete and sand
Density of concrete varies depending on the mix design
Density of sand can vary depending on the source and moisture content
I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.
The types of maintenance for construction machinery include preventive, corrective, and predictive maintenance.
Preventive maintenance involves regularly scheduled inspections, cleaning, and servicing to prevent breakdowns and extend the lifespan of the machinery.
Corrective maintenance is performed when a machine breaks down or malfunctions, and it involves repairing or replacing faulty components.
Predictive maintenance...
Yes, my expected salary is negotiable.
Express willingness to negotiate salary
Highlight flexibility in terms of compensation
Provide examples of previous successful salary negotiations
Top trending discussions
Interview experience
based on 1.1k reviews
Rating in categories
Site Engineer
217
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Civil Site Engineer
180
salaries
| ₹2.3 L/yr - ₹8 L/yr |
Quantity Surveyor
55
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Manager
47
salaries
| ₹9.7 L/yr - ₹19.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA