Patel Engineering Project Engineer - Civil Interview Questions and Answers

Updated 18 Dec 2023

Patel Engineering Project Engineer - Civil Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. ABOUT CONSTRUCTION AND INFRASTRUCTURE ACTIVITIES AT SITE
  • Q2. ABOUT THE TUNNEL EXCAVATION AND SUPPORT WORK

Interview Preparation Tips

Interview preparation tips for other job seekers - ENJOYED THE INTERVIEW WITH CONFIDANCE

I applied via Referral and was interviewed in Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked about totally technical based question regarding my previous sites..what are the cement bag required to grout a 4mtr SD bolts? How to blast a main face and what is powder factor?
  • Q2. How much time taken to start a new gantry from the last one? regarding waterproofing agent, what is thickness of PVC membrane? how to stitch it etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - before facing a interview prepared yourself and bring the confidence level and then push it in front of them.That's it.

Project Engineer - Civil Interview Questions Asked at Other Companies

asked in DEC Infra
Q1. 15 days Program sheet for Steel qty of 850 sqft, slab area, 60 co ... read more
Q2. Do you think about that site execution is one of the easiest task ... read more
asked in DEC Infra
Q3. What is the purpose of Slump test?
asked in Sobha
Q4. 1.Concrete batch time which temperature of heat produced
asked in DEC Infra
Q5. Density of Cement, Steel & Aggregate?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General knowledge test

Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineer technical round
  • Q2. Technical interview
Round 3 - HR 

(2 Questions)

  • Q1. Document verification
  • Q2. Salary slip and salary discussion
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What are your strengths and weaknesses?

Interview Questionnaire 

2 Questions

  • Q1. Causes of accident
  • Ans. 

    Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.

    • Human error: Mistakes or negligence by individuals involved in the project.

    • Equipment failure: Malfunction or breakdown of machinery or tools.

    • Environmental conditions: Adverse weather, natural disasters, or other external factors.

    • Lack of safety measures: Insufficient safety protocols o...

  • Answered by AI
  • Q2. 1. Unsufficient maintenance of machinery.
  • Ans. 

    Insufficient maintenance of machinery can lead to breakdowns and production delays.

    • Regular maintenance schedules should be established and followed.

    • Proper training should be provided to operators and maintenance personnel.

    • Use of predictive maintenance techniques can help identify potential issues before they become major problems.

    • Examples: oil changes, lubrication, cleaning, calibration, inspections.

    • Failure to maintain...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident only

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    I applied via Company Website and was interviewed before Apr 2021. There were 7 interview rounds.

    Round 1 - Case Study 
    Round 2 - Case Study 

    Accident, incident

    Round 3 - Case Study 

    Any hazardous

    Round 4 - Case Study 

    Any near miss

    Round 5 - Case Study 
    Round 6 - Group Discussion 

    HIRA

    Round 7 - Case Study 

    Interview Preparation Tips

    Topics to prepare for L&T Construction Safety Officer interview:
    • Diploma Fire and Safety
    Interview preparation tips for other job seekers - Nice interview i am very excited
    Interview experience
    4
    Good
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - Technical 

    (1 Question)

    • Q1. How you manage safety at site
    • Ans. 

      I manage safety at site by conducting regular safety inspections, implementing safety protocols, providing safety training, and enforcing safety regulations.

      • Conduct regular safety inspections to identify potential hazards

      • Implement safety protocols to address identified hazards

      • Provide safety training to employees on proper safety procedures

      • Enforce safety regulations to ensure compliance

    • Answered by AI
    Round 2 - HR 

    (2 Questions)

    • Q1. Salary structure
    • Q2. Not as per current environment

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Ok
    Interview experience
    1
    Bad
    Difficulty level
    Easy
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected
    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - HR 

    (1 Question)

    • Q1. Salary Discussed
    Round 3 - Technical 

    (2 Questions)

    • Q1. What is Responsibility of Safety Officer
    • Ans. 

      Safety Officer is responsible for ensuring the safety of employees, implementing safety protocols, conducting safety inspections, and promoting a culture of safety in the workplace.

      • Implementing safety protocols and procedures

      • Conducting safety inspections and audits

      • Training employees on safety practices

      • Investigating accidents and incidents

      • Ensuring compliance with safety regulations

      • Promoting a culture of safety in the wo

    • Answered by AI
    • Q2. Site Monetring. Training conducted Site Inspection Follow Legal Compliance Hazard identify and apply Suitable control measure to reduce hazard Tools Takles Inspection mock drill

    I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. Tell us how would you behave in a difficult situation with a client
    • Q2. Why do you want to work with us

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Study the questions prior the interview. Relax ad think before questions

    Patel Engineering Interview FAQs

    How many rounds are there in Patel Engineering Project Engineer - Civil interview?
    Patel Engineering interview process usually has 2 rounds. The most common rounds in the Patel Engineering interview process are Resume Shortlist and One-on-one Round.
    How to prepare for Patel Engineering Project Engineer - Civil interview?
    Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Patel Engineering. The most common topics and skills that interviewers at Patel Engineering expect are Civil Management, Project Engineering and Resource Planning.
    What are the top questions asked in Patel Engineering Project Engineer - Civil interview?

    Some of the top questions asked at the Patel Engineering Project Engineer - Civil interview -

    1. asked about totally technical based question regarding my previous sites..what ...read more
    2. How much time taken to start a new gantry from the last one? regarding waterpro...read more
    3. ABOUT CONSTRUCTION AND INFRASTRUCTURE ACTIVITIES AT S...read more

    Tell us how to improve this page.

    Patel Engineering Project Engineer - Civil Interview Process

    based on 1 interview

    Interview experience

    5
      
    Excellent
    View more
    Patel Engineering Project Engineer - Civil Salary
    based on 20 salaries
    ₹5.5 L/yr - ₹8.3 L/yr
    13% more than the average Project Engineer - Civil Salary in India
    View more details

    Patel Engineering Project Engineer - Civil Reviews and Ratings

    based on 10 reviews

    4.0/5

    Rating in categories

    3.3

    Skill development

    3.6

    Work-life balance

    3.7

    Salary

    4.1

    Job security

    3.9

    Company culture

    3.4

    Promotions

    3.5

    Work satisfaction

    Explore 10 Reviews and Ratings
    Project Engineer
    140 salaries
    unlock blur

    ₹4 L/yr - ₹9.9 L/yr

    Assistant Manager
    75 salaries
    unlock blur

    ₹5.5 L/yr - ₹13.4 L/yr

    Civil Engineer
    63 salaries
    unlock blur

    ₹2.9 L/yr - ₹6.6 L/yr

    Mechanical Engineer
    43 salaries
    unlock blur

    ₹1.8 L/yr - ₹7.2 L/yr

    Surveyor
    34 salaries
    unlock blur

    ₹2.4 L/yr - ₹6.6 L/yr

    Explore more salaries
    Compare Patel Engineering with

    L&T Construction

    4.0
    Compare

    Simplex Infrastructures

    3.4
    Compare

    ITD Cementation India

    4.3
    Compare

    Ashoka Buildcon

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview