Filter interviews by
Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Nov 2023. There were 4 interview rounds.
posted on 20 Aug 2022
I applied via Campus Placement and was interviewed in Jul 2022. There were 3 interview rounds.
The weight of one bag of cement varies depending on the country and type of cement.
The weight of one bag of cement is typically between 25kg and 50kg.
In the United States, a bag of Portland cement usually weighs 94 pounds (42.6kg).
In Europe, a bag of cement typically weighs 50kg.
Different types of cement, such as lightweight cement, may have different weights per bag.
Initial setting time of cement is the time taken for the cement paste to harden sufficiently to resist certain specified pressure.
Initial setting time is an important property of cement as it determines the time available for mixing, placing, and finishing of concrete.
It is measured by the Vicat apparatus, which consists of a needle and a mould filled with cement paste.
The initial setting time is typically around 30 mi...
The size of a concrete cube refers to its dimensions, typically measured in millimeters.
The size of a concrete cube is usually specified by the engineer or client.
Common sizes for concrete cubes are 150mm, 200mm, and 300mm.
The size of the cube is important for testing the compressive strength of the concrete.
The cubes are typically cast and cured for a specific period before testing.
The minimum diameter for dowel bars depends on the specific application and design requirements.
The minimum diameter for dowel bars is typically specified in the project's design documents or specifications.
It is important to consider factors such as the load transfer requirements, concrete strength, and spacing between dowel bars when determining the minimum diameter.
In general, dowel bars for pavement joints are comm...
The lap length of bars for compression zone is the minimum length required to ensure proper transfer of stress between two overlapping bars.
The lap length is determined based on the diameter of the bars, concrete strength, and the bond strength between the bars and concrete.
It is important to provide adequate lap length to prevent failure due to inadequate bond between the bars and concrete.
The lap length for compressi...
The minimum allowable pH value of water is 6.5.
The minimum allowable pH value of water is determined by various regulatory bodies and standards.
For drinking water, the World Health Organization recommends a minimum pH of 6.5 to prevent corrosion of pipes and plumbing fixtures.
In some industrial processes, a minimum pH of 6.0 or even lower may be required.
Water with a pH below the minimum allowable value may be consider...
Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.
Ensure formwork is properly prepared and secured before pouring concrete
Use appropriate equipment such as concrete pumps or buckets for pouring
Monitor concrete flow and consistency to avoid segregation or honeycombing
Properly compact the concrete to remove air voids and ensure strength
Allow suffic...
Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.
Shuttering is usually made of plywood, timber, or steel.
It is important to ensure the shuttering is properly supported and aligned before pouring concrete.
The shuttering should be removed after the concrete has set to the required strength.
Properly designed and constructed shuttering helps in achieving a smooth and uni
Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.
Tiles can be placed in a grid layout for a uniform and organized look.
Random pattern placement can create a more eclectic and unique design.
Specific design layout involves placing tiles according to a pre-determined pattern or design.
Consider factors like tile size, shape, color, and grout spacing when deciding on t
The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.
Prepare the subfloor by ensuring it is clean, level, and dry
Apply mortar or adhesive to the back of each stone before placing it on the subfloor
Use spacers to maintain consistent spacing between stones
Allow the mortar or adhesive to dry completely before grouting the joints
Seal the finished stone floor to protec
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
The quantity of cement in M25 grade concrete is 350 kg/m³.
M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).
The total volume of concrete is taken as 1 m³.
Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.
This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.
The weight of steel varies with its diameter.
The weight of steel can be calculated using the formula: weight = volume x density
The density of steel is approximately 7850 kg/m³
The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length
For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg
Waterproofing is the process of making a structure or object resistant to water penetration.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Clean and prepare the surface to be waterproofed.
Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.
Ensure proper drainage and slope to prevent water accumulation.
Test the waterproofing system for leaks and make n...
Conversion of brass to Cum
Brass is an alloy of copper and zinc, while Cum is not a known substance
It is not possible to convert brass to Cum
Perhaps the question is referring to a different substance or material
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Assistant Manager
112
salaries
| ₹3.5 L/yr - ₹12.5 L/yr |
Senior Engineer
63
salaries
| ₹4.3 L/yr - ₹9 L/yr |
Senior Executive
44
salaries
| ₹2.8 L/yr - ₹6.8 L/yr |
Civil Engineer
35
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
Senior Civil Engineer
32
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Pittie Group
Advance India Projects
Vestian Global Workplace Services
Enrich Energy