Ashar group Senior Civil Engineer Interview Questions and Answers

Updated 6 Jul 2024

Ashar group Senior Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Bbs Billing Estimation Purchase

Interview Preparation Tips

Interview preparation tips for other job seekers - Bbs

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is your job responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - First hr round normal introduction and second technical round.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection

I applied via Walk-in and was interviewed before Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About technical related construction work etc

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical related construction work but it's my first interview I face very problem but interview are very well I selected

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Construction work relativ , Drawing relative, Execution Work ,steel work, shutting work, planning, ke relative questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Official website and HR department share Post office site par and linkdin par
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete pouring method
  • Ans. 

    Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.

    • Ensure formwork is properly prepared and secured before pouring concrete

    • Use appropriate equipment such as concrete pumps or buckets for pouring

    • Monitor concrete flow and consistency to avoid segregation or honeycombing

    • Properly compact the concrete to remove air voids and ensure strength

    • Allow suffic...

  • Answered by AI
  • Q2. Shuttering of columns
  • Ans. 

    Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.

    • Shuttering is usually made of plywood, timber, or steel.

    • It is important to ensure the shuttering is properly supported and aligned before pouring concrete.

    • The shuttering should be removed after the concrete has set to the required strength.

    • Properly designed and constructed shuttering helps in achieving a smooth and uni

  • Answered by AI
  • Q3. Reinforcement checking checklist points
  • Q4. Tiles placing method
  • Ans. 

    Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.

    • Tiles can be placed in a grid layout for a uniform and organized look.

    • Random pattern placement can create a more eclectic and unique design.

    • Specific design layout involves placing tiles according to a pre-determined pattern or design.

    • Consider factors like tile size, shape, color, and grout spacing when deciding on t

  • Answered by AI
  • Q5. Flooring method for stone work
  • Ans. 

    The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.

    • Prepare the subfloor by ensuring it is clean, level, and dry

    • Apply mortar or adhesive to the back of each stone before placing it on the subfloor

    • Use spacers to maintain consistent spacing between stones

    • Allow the mortar or adhesive to dry completely before grouting the joints

    • Seal the finished stone floor to protec

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just jack is required

I applied via Campus Placement and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. What is the weight of one bag cement
  • Ans. 

    The weight of one bag of cement varies depending on the country and type of cement.

    • The weight of one bag of cement is typically between 25kg and 50kg.

    • In the United States, a bag of Portland cement usually weighs 94 pounds (42.6kg).

    • In Europe, a bag of cement typically weighs 50kg.

    • Different types of cement, such as lightweight cement, may have different weights per bag.

  • Answered by AI
  • Q2. What is initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken for the cement paste to harden sufficiently to resist certain specified pressure.

    • Initial setting time is an important property of cement as it determines the time available for mixing, placing, and finishing of concrete.

    • It is measured by the Vicat apparatus, which consists of a needle and a mould filled with cement paste.

    • The initial setting time is typically around 30 mi...

  • Answered by AI
  • Q3. What is the size of concrete cube
  • Ans. 

    The size of a concrete cube refers to its dimensions, typically measured in millimeters.

    • The size of a concrete cube is usually specified by the engineer or client.

    • Common sizes for concrete cubes are 150mm, 200mm, and 300mm.

    • The size of the cube is important for testing the compressive strength of the concrete.

    • The cubes are typically cast and cured for a specific period before testing.

  • Answered by AI
  • Q4. What is the minimum diameter for doweals bar
  • Ans. 

    The minimum diameter for dowel bars depends on the specific application and design requirements.

    • The minimum diameter for dowel bars is typically specified in the project's design documents or specifications.

    • It is important to consider factors such as the load transfer requirements, concrete strength, and spacing between dowel bars when determining the minimum diameter.

    • In general, dowel bars for pavement joints are comm...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. What is the lap length of bars for compperision zone
  • Ans. 

    The lap length of bars for compression zone is the minimum length required to ensure proper transfer of stress between two overlapping bars.

    • The lap length is determined based on the diameter of the bars, concrete strength, and the bond strength between the bars and concrete.

    • It is important to provide adequate lap length to prevent failure due to inadequate bond between the bars and concrete.

    • The lap length for compressi...

  • Answered by AI
  • Q2. What is the minimum alowable ph value of water
  • Ans. 

    The minimum allowable pH value of water is 6.5.

    • The minimum allowable pH value of water is determined by various regulatory bodies and standards.

    • For drinking water, the World Health Organization recommends a minimum pH of 6.5 to prevent corrosion of pipes and plumbing fixtures.

    • In some industrial processes, a minimum pH of 6.0 or even lower may be required.

    • Water with a pH below the minimum allowable value may be consider...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Ashoka Builders Civil Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - This is a basic and absolute need for almost every job seeker.in fact a survey 500 U.S workers by inded showed that if they were considering a new job opportunity , 95% workers said insight into a comapnys reputation would be importent.

Ashar group Interview FAQs

How many rounds are there in Ashar group Senior Civil Engineer interview?
Ashar group interview process usually has 2 rounds. The most common rounds in the Ashar group interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Ashar group Senior Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Pittie Group Interview Questions
2.7
 • 17 Interviews
Ambience Group Interview Questions
3.3
 • 16 Interviews
91springboard Interview Questions
3.7
 • 11 Interviews
Reliable Spaces Interview Questions
2.8
 • 10 Interviews
Migsun Group Interview Questions
3.0
 • 7 Interviews
Enrich Energy Interview Questions
4.2
 • 6 Interviews
View all
Ashar group Senior Civil Engineer Salary
based on 4 salaries
₹5 L/yr - ₹8.3 L/yr
At par with the average Senior Civil Engineer Salary in India
View more details

Ashar group Senior Civil Engineer Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

4.2

Skill development

3.7

Work-life balance

3.8

Salary

3.8

Job security

3.8

Company culture

3.4

Promotions

4.0

Work satisfaction

Explore 3 Reviews and Ratings
Junior Engineer
17 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Estimation & Billing Engineer
11 salaries
unlock blur

₹1.9 L/yr - ₹4.6 L/yr

Billing Engineer
10 salaries
unlock blur

₹2.4 L/yr - ₹5.4 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹2 L/yr - ₹3.7 L/yr

Civil Engineer
8 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Explore more salaries
Compare Ashar group with

Signature Global

4.0
Compare

Pittie Group

2.7
Compare

Advance India Projects

3.6
Compare

Vestian Global Workplace Services

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview