I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
posted on 10 Jul 2024
Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
I applied via Walk-in and was interviewed before Dec 2019. There were 3 interview rounds.
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.
Ensure formwork is properly prepared and secured before pouring concrete
Use appropriate equipment such as concrete pumps or buckets for pouring
Monitor concrete flow and consistency to avoid segregation or honeycombing
Properly compact the concrete to remove air voids and ensure strength
Allow suffic...
Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.
Shuttering is usually made of plywood, timber, or steel.
It is important to ensure the shuttering is properly supported and aligned before pouring concrete.
The shuttering should be removed after the concrete has set to the required strength.
Properly designed and constructed shuttering helps in achieving a smooth and uni
Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.
Tiles can be placed in a grid layout for a uniform and organized look.
Random pattern placement can create a more eclectic and unique design.
Specific design layout involves placing tiles according to a pre-determined pattern or design.
Consider factors like tile size, shape, color, and grout spacing when deciding on t
The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.
Prepare the subfloor by ensuring it is clean, level, and dry
Apply mortar or adhesive to the back of each stone before placing it on the subfloor
Use spacers to maintain consistent spacing between stones
Allow the mortar or adhesive to dry completely before grouting the joints
Seal the finished stone floor to protec
posted on 20 Aug 2022
I applied via Campus Placement and was interviewed in Jul 2022. There were 3 interview rounds.
The weight of one bag of cement varies depending on the country and type of cement.
The weight of one bag of cement is typically between 25kg and 50kg.
In the United States, a bag of Portland cement usually weighs 94 pounds (42.6kg).
In Europe, a bag of cement typically weighs 50kg.
Different types of cement, such as lightweight cement, may have different weights per bag.
Initial setting time of cement is the time taken for the cement paste to harden sufficiently to resist certain specified pressure.
Initial setting time is an important property of cement as it determines the time available for mixing, placing, and finishing of concrete.
It is measured by the Vicat apparatus, which consists of a needle and a mould filled with cement paste.
The initial setting time is typically around 30 mi...
The size of a concrete cube refers to its dimensions, typically measured in millimeters.
The size of a concrete cube is usually specified by the engineer or client.
Common sizes for concrete cubes are 150mm, 200mm, and 300mm.
The size of the cube is important for testing the compressive strength of the concrete.
The cubes are typically cast and cured for a specific period before testing.
The minimum diameter for dowel bars depends on the specific application and design requirements.
The minimum diameter for dowel bars is typically specified in the project's design documents or specifications.
It is important to consider factors such as the load transfer requirements, concrete strength, and spacing between dowel bars when determining the minimum diameter.
In general, dowel bars for pavement joints are comm...
The lap length of bars for compression zone is the minimum length required to ensure proper transfer of stress between two overlapping bars.
The lap length is determined based on the diameter of the bars, concrete strength, and the bond strength between the bars and concrete.
It is important to provide adequate lap length to prevent failure due to inadequate bond between the bars and concrete.
The lap length for compressi...
The minimum allowable pH value of water is 6.5.
The minimum allowable pH value of water is determined by various regulatory bodies and standards.
For drinking water, the World Health Organization recommends a minimum pH of 6.5 to prevent corrosion of pipes and plumbing fixtures.
In some industrial processes, a minimum pH of 6.0 or even lower may be required.
Water with a pH below the minimum allowable value may be consider...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Junior Engineer
17
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Estimation & Billing Engineer
11
salaries
| ₹1.9 L/yr - ₹4.6 L/yr |
Billing Engineer
10
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Civil Site Engineer
8
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Civil Engineer
8
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Signature Global
Pittie Group
Advance India Projects
Vestian Global Workplace Services