Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.
The density of cement is typically around 1440 kg/m³.
The density of cement is a measure of its mass per unit volume.
It is commonly expressed in kilograms per cubic meter (kg/m³).
The density of cement can vary slightly depending on factors such as the type of cement and its composition.
For example, ordinary Portland cement typically has a density of around 1440 kg/m³.
Other types of cement, such as lightweight cement, ma...
The density of bricks varies depending on the type of brick used.
The density of clay bricks ranges from 1,800 to 2,200 kg/m³.
The density of concrete bricks ranges from 1,800 to 2,500 kg/m³.
The density of fly ash bricks ranges from 1,800 to 2,200 kg/m³.
The density of sand-lime bricks ranges from 1,800 to 2,200 kg/m³.
The density of fire bricks ranges from 2,000 to 2,500 kg/m³.
Approximately 278 tiles will be required for the 10x10 feet room.
Convert the room dimensions to the same unit as the tile size.
Calculate the area of the room.
Divide the room area by the tile area to get the number of tiles required.
Round up the result to the nearest whole number.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is commonly measured in grams per cubic centimeter (g/cm³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is typically around 7.85 g/cm³.
Stainless steel, on the other hand, has a slightly lower density of around 7.75 g/cm³.
The density of steel is ...
Initial setting time of concrete refers to the time taken for the concrete to change from a liquid state to a solid state.
Initial setting time is influenced by factors such as temperature, cement type, water-cement ratio, and admixtures.
The initial setting time is typically measured using the Vicat apparatus, where a needle is used to penetrate the concrete.
The initial setting time is important for construction activit...
The number of bricks used in 1m3 varies depending on the size of the bricks.
The size of the bricks affects the number of bricks used in 1m3.
Different brick sizes have different volumes.
To determine the number of bricks, divide the volume of 1m3 by the volume of a single brick.
Concrete density refers to the mass per unit volume of concrete.
Concrete density is typically measured in kilograms per cubic meter (kg/m³).
It is an important property of concrete as it affects its strength, durability, and other mechanical properties.
The density of concrete can vary depending on the mix design, aggregates used, and the amount of air entrainment.
Normal weight concrete has a density ranging from 2200 to...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are adequately embedded in the concrete to prevent slippage or failure.
The development length is typically specified in...
BBS stands for Bar Bending Schedule, which is a detailed report that provides information about the reinforcement steel required for a construction project.
BBS is prepared by civil engineers to ensure the proper placement and quantity of reinforcement steel in a structure.
It includes details such as the diameter, length, and shape of each reinforcement bar.
BBS helps in estimating the quantity of steel required and assi...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I was interviewed in Jan 2025.
I worked at a software development company specializing in cloud solutions.
Developed and maintained cloud-based applications
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
Participated in regular code reviews and testing processes
I have 5 years of experience in IT, specializing in network infrastructure and system administration.
5 years of experience in IT
Specializing in network infrastructure and system administration
Certifications in Cisco CCNA and Microsoft MCSA
I am looking for a job in IRB because of the company's reputation for innovation and growth opportunities.
Interested in working for a company known for innovation
Seeking growth opportunities within the organization
Impressed by IRB's reputation in the industry
I am looking for a competitive salary that reflects my skills and experience in the industry.
Research the average salary range for System Engineers in the industry and location
Consider your level of experience, certifications, and skills when determining your salary expectations
Be prepared to negotiate based on the benefits package offered by the company
Provide a salary range rather than a specific number to allow for
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
posted on 30 Nov 2023
I was interviewed before Nov 2022.
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 36 reviews
Rating in categories
Civil Site Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Surveyor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company