Upload Button Icon Add office photos

Filter interviews by

VRAJ INFRASTRUCTURE Interview Questions, Process, and Tips

Updated 8 Jul 2022

Top VRAJ INFRASTRUCTURE Interview Questions and Answers

View all 9 questions

VRAJ INFRASTRUCTURE Interview Experiences

Popular Designations

3 interviews found

Round 1 - HR 

(1 Question)

  • Q1. About qualifications
Round 2 - Technical 

(2 Questions)

  • Q1. Basic civil engineering related question
  • Q2. Like design mix ratio and brick related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Everything is easy . Just work hard once you get into this field you wil get alot of knowledge

Technical Trainee Engineer Interview Questions asked at other Companies

Q1. What is production , what is production quality problem in line
View answer (1)

Interview Questionnaire 

1 Question

  • Q1. Explanation of BBS in details
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed report that provides information about the reinforcement steel required for a construction project.

    • BBS is prepared by civil engineers to ensure the proper placement and quantity of reinforcement steel in a structure.

    • It includes details such as the diameter, length, and shape of each reinforcement bar.

    • BBS helps in estimating the quantity of steel required and assi...

  • Answered by AI

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

9 Questions

  • Q1. What is the density of cement?
  • Ans. 

    The density of cement is typically around 1440 kg/m³.

    • The density of cement is a measure of its mass per unit volume.

    • It is commonly expressed in kilograms per cubic meter (kg/m³).

    • The density of cement can vary slightly depending on factors such as the type of cement and its composition.

    • For example, ordinary Portland cement typically has a density of around 1440 kg/m³.

    • Other types of cement, such as lightweight cement, ma...

  • Answered by AI
  • Q2. What is the density of bricks
  • Ans. 

    The density of bricks varies depending on the type of brick used.

    • The density of clay bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of concrete bricks ranges from 1,800 to 2,500 kg/m³.

    • The density of fly ash bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of sand-lime bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of fire bricks ranges from 2,000 to 2,500 kg/m³.

  • Answered by AI
  • Q3. If you have 10x10 feet room and you have 600x600 mm size tiles then how many tiles will required for that room?
  • Ans. 

    Approximately 278 tiles will be required for the 10x10 feet room.

    • Convert the room dimensions to the same unit as the tile size.

    • Calculate the area of the room.

    • Divide the room area by the tile area to get the number of tiles required.

    • Round up the result to the nearest whole number.

  • Answered by AI
  • Q4. What is the density of steel?
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is commonly measured in grams per cubic centimeter (g/cm³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is typically around 7.85 g/cm³.

    • Stainless steel, on the other hand, has a slightly lower density of around 7.75 g/cm³.

    • The density of steel is ...

  • Answered by AI
  • Q5. Cube test related questions?
  • Q6. Initial settings time of concrete?
  • Ans. 

    Initial setting time of concrete refers to the time taken for the concrete to change from a liquid state to a solid state.

    • Initial setting time is influenced by factors such as temperature, cement type, water-cement ratio, and admixtures.

    • The initial setting time is typically measured using the Vicat apparatus, where a needle is used to penetrate the concrete.

    • The initial setting time is important for construction activit...

  • Answered by AI
  • Q7. How many brick use in 1m3?
  • Ans. 

    The number of bricks used in 1m3 varies depending on the size of the bricks.

    • The size of the bricks affects the number of bricks used in 1m3.

    • Different brick sizes have different volumes.

    • To determine the number of bricks, divide the volume of 1m3 by the volume of a single brick.

  • Answered by AI
  • Q8. What is Concrete density?
  • Ans. 

    Concrete density refers to the mass per unit volume of concrete.

    • Concrete density is typically measured in kilograms per cubic meter (kg/m³).

    • It is an important property of concrete as it affects its strength, durability, and other mechanical properties.

    • The density of concrete can vary depending on the mix design, aggregates used, and the amount of air entrainment.

    • Normal weight concrete has a density ranging from 2200 to...

  • Answered by AI
  • Q9. What is development Length?
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are adequately embedded in the concrete to prevent slippage or failure.

    • The development length is typically specified in...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear all basic civil fundamental and field related questions

Top VRAJ INFRASTRUCTURE Civil Site Engineer Interview Questions and Answers

Q1. If you have 10x10 feet room and you have 600x600 mm size tiles then how many tiles will required for that room?
View answer (16)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (64)

Jobs at VRAJ INFRASTRUCTURE

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Referral

Round 1 - One-on-one 

(8 Questions)

  • Q1. Tell me about yourself.
  • Ans. 

    Experienced transportation specialist with a background in logistics and supply chain management.

    • Over 5 years of experience in coordinating transportation operations

    • Skilled in optimizing routes and reducing costs

    • Proficient in using transportation management systems

    • Strong communication and problem-solving skills

    • Managed a team of drivers and ensured timely deliveries

  • Answered by AI
  • Q2. How do you demonstrate your qualifications and capabilities?
  • Ans. 

    I demonstrate my qualifications and capabilities through my experience, skills, certifications, and successful projects.

    • Providing examples of past projects where I successfully managed transportation logistics

    • Highlighting relevant certifications such as CDL or PMP

    • Showcasing my problem-solving skills through real-life scenarios

    • Demonstrating my knowledge of transportation regulations and best practices

  • Answered by AI
  • Q3. What is the efficiency of transport services?
  • Ans. 

    Transport services efficiency is crucial for timely and cost-effective movement of goods and people.

    • Efficiency of transport services can be measured by factors such as on-time delivery, fuel consumption, and vehicle utilization.

    • Utilizing technology like GPS tracking and route optimization software can improve efficiency.

    • Examples of efficient transport services include companies like UPS and FedEx, known for their relia...

  • Answered by AI
  • Q4. If we offer you a job, how would you define your role?
  • Ans. 

    As a Transportation Specialist, my role would involve coordinating and optimizing transportation operations to ensure efficient and timely delivery of goods.

    • Coordinating transportation schedules and routes

    • Optimizing transportation operations to reduce costs and improve efficiency

    • Ensuring timely delivery of goods to customers

    • Monitoring and tracking transportation vehicles and shipments

    • Collaborating with drivers, supplie

  • Answered by AI
  • Q5. How do you feel about working with a team?
  • Ans. 

    I enjoy working with a team and believe collaboration leads to better results.

    • I believe teamwork allows for different perspectives and ideas to be shared

    • I am comfortable communicating and collaborating with team members

    • I have experience working in team-oriented environments, such as group projects or team sports

  • Answered by AI
  • Q6. Why have you not received more promotions despite having been here for so many years?
  • Ans. 

    Lack of promotions may be due to focusing on gaining experience and expertise in current role rather than seeking promotions.

    • I have chosen to focus on gaining valuable experience and expertise in my current role rather than actively seeking promotions.

    • I have taken on additional responsibilities and projects to enhance my skills and knowledge in my field.

    • I have consistently received positive feedback on my performance a...

  • Answered by AI
  • Q7. If we were to offer you a job, how would you represent our company?
  • Ans. 

    I would represent your company with professionalism, dedication, and a commitment to excellence.

    • I would always prioritize safety and efficiency in all transportation operations.

    • I would communicate effectively with clients, colleagues, and stakeholders to ensure smooth operations.

    • I would uphold the company's values and reputation in all interactions and transactions.

    • I would continuously seek opportunities for improvemen...

  • Answered by AI
  • Q8. Do you believe that you and your team can represent our company and department well?
  • Ans. 

    Yes, I believe that my team and I can represent the company and department well.

    • We have a strong track record of professionalism and dedication to our work.

    • Our team has excellent communication skills and a strong work ethic.

    • We are committed to upholding the values and reputation of the company.

    • We have successfully represented the company at various events and meetings in the past.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for CBRE Transportation Specialist interview:
  • Transport department
  • Current Job
  • Job analysis
  • Perivies job
  • Upcoming job
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Describe in brief all the types of Building you have worked.
  • Q2. Concrete mix design and their components
Round 2 - Technical 

(1 Question)

  • Q1. Different shuttering schemes you have worked
Round 3 - Technical 

(1 Question)

  • Q1. Overall experience in brief of variable structure you have worked
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Ac repair service installation
  • Q2. Repair ............
  • Q3. Service ........
  • Q4. Installation ............
Round 2 - Technical 

(1 Question)

  • Q1. Ac repair service installation
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

Knowledge and experience in fire safety.

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is your understanding of fire extinguishers and the emergency response plan?
  • Q2. What are the evacuation plans and drills in place?
Round 3 - Technical 

(2 Questions)

  • Q1. Type of emergency
  • Q2. Electrical, arson, kitchen, natural ect.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the difference between the DELETE and DROP commands in SQL?
  • Q2. What is the concept of a Primary Key in SQL?
  • Q3. What is the difference between UNION and UNION ALL in SQL?
  • Q4. What is the LIKE operator, and how is it used in SQL?
Interview experience
2
Poor
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Fire protection and fire system week check team training
  • Q2. Monthly and weekly report check
Round 2 - Assignment 

Fire and production department

Round 3 - HR 

(2 Questions)

  • Q1. Company Protection and Company Employee Security
  • Q2. There should be no problem in company benefit and company
Round 4 - HR 

(2 Questions)

  • Q1. CompanWhat can we do for the company and the benefits of the company
  • Q2. Company me kitne Data of how many employees are there in the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the grade of concrete
  • Ans. 

    The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.

    • The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.

    • The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.

    • For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...

  • Answered by AI
  • Q2. What is the unit used for estimating painting work?
  • Ans. 

    The unit used for estimating painting work is square feet.

    • Square feet is commonly used to estimate the amount of paint needed for a project.

    • Other units like square meters can also be used depending on the region.

    • Calculations are based on the surface area to be painted.

  • Answered by AI
  • Q3. What you mean by RL in survey
  • Ans. 

    RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.

    • RL is used in surveying to determine the elevation of a point relative to a known reference point.

    • It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.

    • RL can be calculated using leveling instruments such as a dumpy level or a theodolite.

    • For example, if a benchmark ha...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Types of cement
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.

    • Portland cement is the most common type and is used in general construction.

    • Rapid-hardening cement sets quickly and is often used in repair work.

    • Sulfate-resistant cement is used in areas where soil or water has high sulfate content.

  • Answered by AI
  • Q2. Size of columns
  • Ans. 

    The size of columns in civil engineering is determined based on the load they will support and the height of the structure.

    • Columns are sized based on the load they will support, with larger loads requiring larger columns.

    • The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.

    • Factors such as material strength, column spacing, and building c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the basic civil engineering concept and knowledge

VRAJ INFRASTRUCTURE Interview FAQs

How many rounds are there in VRAJ INFRASTRUCTURE interview?
VRAJ INFRASTRUCTURE interview process usually has 2 rounds. The most common rounds in the VRAJ INFRASTRUCTURE interview process are HR and Technical.
How to prepare for VRAJ INFRASTRUCTURE interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at VRAJ INFRASTRUCTURE. The most common topics and skills that interviewers at VRAJ INFRASTRUCTURE expect are Site Engineering, Civil Engineering, Project Management, Accounting and Building Construction.
What are the top questions asked in VRAJ INFRASTRUCTURE interview?

Some of the top questions asked at the VRAJ INFRASTRUCTURE interview -

  1. If you have 10x10 feet room and you have 600x600 mm size tiles then how many ti...read more
  2. What is the density of ceme...read more
  3. What is the density of ste...read more

Tell us how to improve this page.

VRAJ INFRASTRUCTURE Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

VRAJ INFRASTRUCTURE Reviews and Ratings

based on 37 reviews

3.6/5

Rating in categories

3.5

Skill development

3.0

Work-life balance

3.1

Salary

3.3

Job security

3.1

Company culture

3.1

Promotions

3.2

Work satisfaction

Explore 37 Reviews and Ratings
Marketing Department

Rajkot

1-5 Yrs

Not Disclosed

HR Professional

Rajkot

1-6 Yrs

Not Disclosed

Admin

Rajkot

1-6 Yrs

Not Disclosed

Explore more jobs
Civil Site Engineer
41 salaries
unlock blur

₹1.5 L/yr - ₹4.6 L/yr

Site Engineer
25 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Civil Engineer
9 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Surveyor
6 salaries
unlock blur

₹3.5 L/yr - ₹4 L/yr

Junior Engineer Civil
6 salaries
unlock blur

₹1.2 L/yr - ₹2.5 L/yr

Explore more salaries
Compare VRAJ INFRASTRUCTURE with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview