I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.
Measure the length and width of each room in the building
Exclude the thickness of walls from the measurements
Calculate the area of each room by multiplying length and width
Sum up the areas of all rooms to get the total carpet area of the building
I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.
Top trending discussions
posted on 26 Jul 2024
posted on 14 Feb 2024
posted on 3 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
posted on 23 Jan 2022
I applied via Approached by company and was interviewed in Dec 2021. There was 1 interview round.
Answering questions related to concrete mix, IS codes, cement setting time, clear cover, transition curve, supervisor elevation, pavement design, and beam cover.
Mix ratio of concrete is the proportion of cement, sand, and aggregate used in the mixture.
IS codes are Indian Standards codes that provide guidelines for construction materials and practices.
Setting time of cement is the time taken by cement to harden and gain...
I was interviewed in Jan 2025.
I am currently working at a construction company specializing in infrastructure projects.
Specializing in infrastructure projects
Working at a construction company
Dealing with civil engineering tasks
I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.
Managed site development projects from concept to completion
Designed infrastructure systems such as water supply and drainage
Performed construction management duties to ensure projects stayed on schedule and within budget
Worked on projects ranging from residential de...
Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.
Coordinate with utility companies to ensure proper installation of transmission lines
Ensure compliance with safety regulations and environmental standards
Oversee the construction process to ensure quality and timely completion
Manage and resolve any iss...
Key considerations for foundation in transmission line construction
Soil type and bearing capacity must be assessed
Proper foundation design to support the weight and wind loads of the transmission line towers
Consideration of environmental factors such as seismic activity and flooding
Accessibility for construction equipment and maintenance
Proper drainage to prevent erosion and foundation instability
The best method for erection in transmission is using cranes and specialized equipment.
Use cranes for lifting and placing heavy transmission components
Ensure proper planning and coordination to avoid delays
Utilize specialized equipment for precise positioning
Follow safety protocols to prevent accidents
Consider environmental factors such as wind and terrain
I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.
Stay calm and composed under pressure
Analyze the problem thoroughly before taking action
Seek advice and input from colleagues or experts
Think creatively to come up with innovative solutions
The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.
The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.
They prevent the tower from buckling or collapsing under various loads.
Diagonals also help in reducing the overall weight of the tower by transferring some of the...
posted on 1 Aug 2024
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.
As usual simple question.
Software test like ms office suit ad auto cad.
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
They ask question on SFD AND BMD
based on 2 interviews
Interview experience
based on 45 reviews
Rating in categories
Assistant Manager
213
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Assistant Engineer
154
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Assistant Engineer - Civil
153
salaries
| ₹2.6 L/yr - ₹4.5 L/yr |
Project Engineer
135
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Deputy Manager
111
salaries
| ₹5.5 L/yr - ₹12.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA