Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.
Measure the length and width of each room in the building
Exclude the thickness of walls from the measurements
Calculate the area of each room by multiplying length and width
Sum up the areas of all rooms to get the total carpet area of the building
I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.
posted on 26 Jul 2024
The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)
The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for medium strength concrete.
For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.
As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.
Assisted senior engineers in project planning and design
Participated in site visits and inspections
Prepared project reports and documentation
Collaborated with team members and contractors
Ensured compliance with safety regulations and quality standards
Managed site operations, coordinated with contractors, ensured compliance with safety regulations.
Managed day-to-day site operations
Coordinated with contractors for timely completion of projects
Ensured compliance with safety regulations and quality standards
Prepared progress reports and communicated with stakeholders
Implemented cost-saving measures without compromising quality
The name of the client is XYZ Construction Company.
XYZ Construction Company is a well-known construction firm in the region.
They have completed several projects in the past, including the construction of a new office building in downtown.
The client has a reputation for high-quality work and timely project completion.
posted on 14 Feb 2024
posted on 3 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
posted on 23 Jan 2022
I applied via Approached by company and was interviewed in Dec 2021. There was 1 interview round.
Answering questions related to concrete mix, IS codes, cement setting time, clear cover, transition curve, supervisor elevation, pavement design, and beam cover.
Mix ratio of concrete is the proportion of cement, sand, and aggregate used in the mixture.
IS codes are Indian Standards codes that provide guidelines for construction materials and practices.
Setting time of cement is the time taken by cement to harden and gain...
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Maintain regular communication and interaction with all staff members.
Regularly check in with staff to ensure they have the resources and support they need
Hold regular team meetings to discuss project progress and address any concerns
Encourage open communication and feedback from all team members
Provide opportunities for team building and collaboration
Lead by example by being accessible and approachable to all staff me
Interview experience
based on 45 reviews
Rating in categories
Assistant Manager
193
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Assistant Engineer
164
salaries
| ₹1.8 L/yr - ₹5.1 L/yr |
Assistant Engineer - Civil
161
salaries
| ₹2.6 L/yr - ₹4.7 L/yr |
Project Engineer
145
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Deputy Manager
115
salaries
| ₹5.5 L/yr - ₹12.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA