I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

They ask question on SFD AND BMD

Round 3 - Technical 

(2 Questions)

  • Q1. They ask question on SFD & BMD
  • Q2. And they also ask question on orthographic

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer was very chill and calm

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Civil engineering sewage project
  • Q2. Civil engineering
Round 2 - Technical 

(2 Questions)

  • Q1. Excavation engineering sewage project
  • Q2. Civil engineering 6 year sewage project
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Technical engineer
  • Q2. My salary 800000
Round 2 - Technical 

(3 Questions)

  • Q1. Technical engineer
  • Q2. My salary 800000
  • Q3. Excavation Engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Excavation engineers sewerage project delhi
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. BBS ,QUANTITY TAKE OFF ,QUANTITY OF CONCRETE, lapping, and clear cover
  • Ans. Find accurate cutting length and find the total weight of rcc structure, find out all the quantity of structure, Lapping normal used 50d clear cover our for footing 50mm and beam 25mm and column for 40mm and slab 20mm
  • Answered by Jitu Behera
  • Q2. Bbs, mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to learn the skill
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to your experience.
Round 3 - HR 

(1 Question)

  • Q1. Simple introduction
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What is your CTC
  • Ans. 

    My current CTC is $80,000 per year.

    • My current CTC is $80,000 per year

    • It includes base salary, bonuses, and benefits

    • I am open to negotiation based on the job role and responsibilities

  • Answered by AI

I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What are the things to check before casting a tower foundation?
  • Ans. 

    Before casting a tower foundation, several things need to be checked to ensure its stability and durability.

    • Check the soil condition and bearing capacity

    • Ensure proper reinforcement and formwork

    • Verify the dimensions and alignment of the foundation

    • Check for any obstructions or utilities in the excavation area

    • Ensure proper curing of the concrete

    • Verify compliance with local building codes and regulations

  • Answered by AI
  • Q2. How is trapezoidal foundation quantity calculated?
  • Ans. 

    Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.

    • Measure the length and depth of the foundation

    • Measure the width at both ends and find the average width

    • Multiply the average width by the length and depth to get the volume

    • Calculate the quantity by multiplying the volume with the unit weight of concrete

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers even if you are not 100% sure about that. No one is judgi9 you by that one wrong answer but your confidence do make a difference.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via campus placement at National Institute of Technology (NIT), Tiruchirappalli and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Standard size of the brick.
  • Q2. Water cement ratio

Neilsoft Interview FAQs

How many rounds are there in Neilsoft Civil Engineer interview?
Neilsoft interview process usually has 3 rounds. The most common rounds in the Neilsoft interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in Neilsoft Civil Engineer interview?

Some of the top questions asked at the Neilsoft Civil Engineer interview -

  1. And they also ask question on orthograp...read more
  2. They ask question on SFD & ...read more

Tell us how to improve this page.

Neilsoft Civil Engineer Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more
Neilsoft Civil Engineer Salary
based on 5 salaries
₹2.5 L/yr - ₹4.2 L/yr
12% less than the average Civil Engineer Salary in India
View more details

Neilsoft Civil Engineer Reviews and Ratings

based on 2 reviews

4.9/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

4.1

Salary

5.0

Job security

4.0

Company culture

3.9

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Junior Engineer
178 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

BIM Engineer
88 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Engineer
75 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Design Engineer
62 salaries
unlock blur

₹2.8 L/yr - ₹8 L/yr

Software Engineer
60 salaries
unlock blur

₹3.2 L/yr - ₹9.8 L/yr

Explore more salaries
Compare Neilsoft with

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare

Tech Mahindra

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview