Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Nippon Koei India Team. If you also belong to the team, you can get access from here

Nippon Koei India Verified Tick

Compare button icon Compare button icon Compare
4.8

based on 351 Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Nippon Koei India Interview Questions, Process, and Tips

Updated 10 Dec 2024

Top Nippon Koei India Interview Questions and Answers

View all 16 questions

Nippon Koei India Interview Experiences

Popular Designations

23 interviews found

DPT.Manager Interview Questions & Answers

user image Manish Pathak

posted on 10 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Normal question related to contract manager
  • Q2. FIDIC, DAB and arbitration.

DPT.Manager Interview Questions asked at other Companies

Q1. Which SS material you have used in piping construction
View answer (1)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Guy guy hhn hhh ghh
  • Q2. You thik fryi very ghjn
  • Q3. Thbyuh Bhuj set bjk
  • Q4. Hiii Vadgaon bhi set njk

Software Developer Interview Questions asked at other Companies

Q1. Maximum Subarray SumGiven an array of numbers, find the maximum sum of any contiguous subarray of the array. For example, given the array [34, -50, 42, 14, -5, 86], the maximum sum would be 137, since we would take elements 42, 14, -5, and ... read more
View answer (39)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. I finance and hr
Round 2 - Technical 

(1 Question)

  • Q1. About work experience
Round 3 - HR 

(1 Question)

  • Q1. Hr round for salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Project Finance Manager Interview Questions asked at other Companies

Q1. how could you solve unexpected financial problems ?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technical Basic and Process knolledge questions.

Round 3 - HR 

(1 Question)

  • Q1. General information. What do you know about the company. Why do you want to leave your current job. How much time would like to serve the company if you selected. Expertise. Tackling and decision making ca...
Round 4 - Technical 

(1 Question)

  • Q1. What do you know about the process and product. How do you handle the worst situation Knowledge about the Equipments and resources and it's utilization. PPC knowledge. RM PM knolledge. Parameter must be kn...

Interview Preparation Tips

Interview preparation tips for other job seekers - This place for knowledge and good experience.

Executive Production Interview Questions asked at other Companies

Q1. What was your position in previous and draw an organogram showing your position and show 2 line above and 2 line below?
View answer (2)

Nippon Koei India interview questions for popular designations

 Head - Projects

 (2)

 Senior Engineer

 (2)

 Accountant

 (1)

 Architect Project Manager

 (1)

 Cctv Project Engineer

 (1)

 Deputy Manager

 (1)

 DPT.Manager

 (1)

 Engineering Assistant

 (1)

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. More on operational concerns

Interview Preparation Tips

Interview preparation tips for other job seekers - get your best in the beginning, later nothing happens

Head - Projects Interview Questions asked at other Companies

Q1. PTS how it work? Specifications and the method to do the same.
View answer (2)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Regarding Civil QC

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

As usual simple question.

Round 2 - Aptitude Test 

Software test like ms office suit ad auto cad.

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About previous assignments
  • Q2. About your job roles in previous assignments

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Asked regarding my current job profile
  • Ans. Answer to interviewer very confidently whatever they're asking.
  • Answered Anonymously
  • Q2. What is full process of Diaphragm wall construction?
  • Ans. 

    Diaphragm wall construction involves several steps including excavation, reinforcement placement, concrete pouring, and panel extraction.

    • Excavation of a trench to the desired depth and width

    • Installation of guide walls to maintain the trench dimensions

    • Reinforcement cages are lowered into the trench and positioned correctly

    • Concrete is poured into the trench, displacing the bentonite slurry

    • Panel extraction is carried out ...

  • Answered by AI
  • Q3. What is difference between Top bottom construction and Bottom Top construction?
  • Ans. 

    Top bottom construction refers to building from top to bottom while bottom top construction is the opposite.

    • Top bottom construction involves starting from the top and building downwards while bottom top construction starts from the bottom and builds upwards.

    • Top bottom construction is commonly used in high-rise buildings while bottom top construction is used in underground structures like tunnels.

    • Top bottom construction...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever interviewer is asking questions you have to answer them without any hesitation, be confident

Inspection Engineer Interview Questions asked at other Companies

Q1. What is least count of any measuring instrument?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Self Introduction, educational background and overall experience
  • Q2. National & International experience in SEZs and Industrial Parks
  • Ans. 

    I have extensive experience in developing and managing SEZs and Industrial Parks both nationally and internationally.

    • Led the development of multiple SEZs in India, overseeing all aspects from planning to execution

    • Managed industrial parks in Southeast Asia, ensuring compliance with local regulations and attracting foreign investment

    • Collaborated with government agencies and private sector partners to drive economic growt...

  • Answered by AI
  • Q3. Development guidelines for Industrial Parks / SEZs in Tamil Nadu and India
  • Ans. 

    Development guidelines for Industrial Parks / SEZs in Tamil Nadu and India focus on infrastructure, sustainability, and attracting investments.

    • Infrastructure development including roads, water supply, electricity, and waste management

    • Sustainability measures such as green building certifications and renewable energy usage

    • Attracting investments through incentives like tax breaks and streamlined approval processes

    • Encourag...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nippon Koei India Head - Projects interview:
  • Techncial Basics of Civil Engin
  • Project detailing from your expe
  • Communication Skills
  • Software Skill
Interview preparation tips for other job seekers - Please be technically sound in answering the questions with good examples from your work experience and be precise with your communication to the interviewer.

Head - Projects Interview Questions asked at other Companies

Q1. PTS how it work? Specifications and the method to do the same.
View answer (2)

Nippon Koei India Interview FAQs

How many rounds are there in Nippon Koei India interview?
Nippon Koei India interview process usually has 1-2 rounds. The most common rounds in the Nippon Koei India interview process are Resume Shortlist, Technical and One-on-one Round.
How to prepare for Nippon Koei India interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nippon Koei India. The most common topics and skills that interviewers at Nippon Koei India expect are Civil Engineering, Construction, Networking, Supervision and Monitoring.
What are the top questions asked in Nippon Koei India interview?

Some of the top questions asked at the Nippon Koei India interview -

  1. What is full process of Diaphragm wall constructi...read more
  2. What is difference between Top bottom construction and Bottom Top constructi...read more
  3. The work hours period is susceptible to person and in supervision of regulator...read more
How long is the Nippon Koei India interview process?

The duration of Nippon Koei India interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Nippon Koei India Interview Process

based on 10 interviews in last 1 year

Interview experience

4.4
  
Good
View more

People are getting interviews through

based on 17 Nippon Koei India interviews
Job Portal
WalkIn
Campus Placement
Recruitment Consultant
Referral
47%
6%
6%
6%
6%
29% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
TCE Interview Questions
3.8
 • 240 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
WSP Interview Questions
4.3
 • 88 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
Mott MacDonald Interview Questions
4.2
 • 42 Interviews
Ramboll Interview Questions
4.2
 • 35 Interviews
ARCADIS Interview Questions
4.2
 • 31 Interviews
Black & Veatch Interview Questions
4.3
 • 12 Interviews
View all

Nippon Koei India Reviews and Ratings

based on 351 reviews

4.8/5

Rating in categories

4.4

Skill development

4.7

Work-Life balance

4.7

Salary & Benefits

4.5

Job Security

4.7

Company culture

4.5

Promotions/Appraisal

4.7

Work Satisfaction

Explore 351 Reviews and Ratings
Assistant Manager
91 salaries
unlock blur

₹7.5 L/yr - ₹17 L/yr

Senior Engineer
79 salaries
unlock blur

₹5 L/yr - ₹11.2 L/yr

Deputy Manager
34 salaries
unlock blur

₹9.5 L/yr - ₹18 L/yr

Manager
23 salaries
unlock blur

₹13 L/yr - ₹22 L/yr

Site Engineer
17 salaries
unlock blur

₹3.2 L/yr - ₹9 L/yr

Explore more salaries
Compare Nippon Koei India with

AECOM

4.3
Compare

Jacobs Engineering Group

4.1
Compare

TCE

3.8
Compare

WSP

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview