Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Nippon Koei India Team. If you also belong to the team, you can get access from here

Nippon Koei India Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Nippon Koei India Inspection Engineer Interview Questions and Answers

Updated 16 Apr 2023

Nippon Koei India Inspection Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Asked regarding my current job profile
  • Ans. Answer to interviewer very confidently whatever they're asking.
  • Answered Anonymously
  • Q2. What is full process of Diaphragm wall construction?
  • Ans. 

    Diaphragm wall construction involves several steps including excavation, reinforcement placement, concrete pouring, and panel extraction.

    • Excavation of a trench to the desired depth and width

    • Installation of guide walls to maintain the trench dimensions

    • Reinforcement cages are lowered into the trench and positioned correctly

    • Concrete is poured into the trench, displacing the bentonite slurry

    • Panel extraction is carried out ...

  • Answered by AI
  • Q3. What is difference between Top bottom construction and Bottom Top construction?
  • Ans. 

    Top bottom construction refers to building from top to bottom while bottom top construction is the opposite.

    • Top bottom construction involves starting from the top and building downwards while bottom top construction starts from the bottom and builds upwards.

    • Top bottom construction is commonly used in high-rise buildings while bottom top construction is used in underground structures like tunnels.

    • Top bottom construction...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever interviewer is asking questions you have to answer them without any hesitation, be confident

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is diesel generator, transformer & HVAC
  • Ans. 

    Diesel generator is a backup power source using diesel fuel, transformer is a device that transfers electrical energy between circuits, and HVAC is a system for heating, ventilation, and air conditioning.

    • Diesel generator: provides backup power using diesel fuel, commonly used in areas with frequent power outages

    • Transformer: transfers electrical energy between circuits, stepping up or down voltage levels as needed

    • HVAC: ...

  • Answered by AI
  • Q2. Operation & maintenance LT pannel & HT pannel
  • Q3. What is fire fighting system
  • Ans. 

    A fire fighting system is a set of equipment and procedures designed to detect, control, and extinguish fires in a building or area.

    • Includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses

    • May also involve fire suppression systems like foam or gas

    • Designed to protect lives and property in the event of a fire

    • Regular maintenance and testing are crucial to ensure effectiveness

  • Answered by AI
  • Q4. What is DM plant
  • Ans. 

    DM plant stands for Demineralization plant, used to remove minerals and salts from water.

    • DM plant is used in industries to produce demineralized water for various processes.

    • It consists of ion exchange resins to remove minerals like calcium, magnesium, and salts from water.

    • The process involves passing water through cation and anion exchange columns to remove ions.

    • DM plant is essential in power plants, pharmaceutical ind...

  • Answered by AI
  • Q5. What is acb,vcb,mccb, mcb
  • Ans. 

    ACB, VCB, MCCB, MCB are types of circuit breakers used in electrical systems.

    • ACB stands for Air Circuit Breaker, used for high voltage applications.

    • VCB stands for Vacuum Circuit Breaker, used for medium voltage applications.

    • MCCB stands for Molded Case Circuit Breaker, used for low voltage applications.

    • MCB stands for Miniature Circuit Breaker, used for residential and commercial applications.

  • Answered by AI
  • Q6. Fire fighting system
  • Q7. ACB,VCB,MCCB,MCB,OCB etc

Interview Preparation Tips

Topics to prepare for Tata Projects Electrical Engineer interview:
  • Electrical department
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Motor type, Pump lowering, ESR piping etc.
  • Q2. Solar Specification
Round 2 - HR 

(2 Questions)

  • Q1. Notice period is negotiable
  • Q2. 30%hike on current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm, to be honest if you know about whats they ask explain them if not then leave and say sorry.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Portal and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What do you know about PCB ?
  • Ans. 

    PCB stands for Printed Circuit Board, a board made of non-conductive material with conductive tracks for electronic components.

    • PCB is used to mechanically support and electrically connect electronic components using conductive pathways.

    • It is made of non-conductive material like fiberglass, with copper tracks to connect components.

    • PCBs can be single-sided, double-sided, or multi-layered depending on the complexity of th...

  • Answered by AI
  • Q2. What is the active and passive components?
  • Ans. 

    Active components require a power source to operate, while passive components do not.

    • Active components require an external power source to function, such as transistors and integrated circuits.

    • Passive components do not require an external power source, such as resistors and capacitors.

    • Active components can control the flow of electricity, while passive components simply store or dissipate energy.

    • Examples of active comp...

  • Answered by AI
  • Q3. What is the difference between resistance and capacitor?
  • Ans. 

    Resistance is the opposition to the flow of current in a circuit, while a capacitor stores and releases electrical energy.

    • Resistance limits the flow of current, while a capacitor stores and releases charge.

    • Resistance is measured in ohms, while capacitance is measured in farads.

    • Examples of resistors include carbon film resistors, while examples of capacitors include ceramic capacitors.

    • Resistance dissipates energy in the...

  • Answered by AI
  • Q4. What do you know about SMT ?
  • Ans. 

    SMT stands for Surface Mount Technology, a method of electronic component assembly where components are mounted directly onto the surface of a printed circuit board (PCB).

    • SMT components are smaller and lighter than through-hole components, allowing for higher component density on PCBs.

    • SMT components are typically mounted using solder paste and reflow soldering techniques.

    • SMT technology allows for automated assembly pro...

  • Answered by AI

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Only speking own intro with work details
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Transformer tests
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is moter and it capacity
  • Ans. 

    A motor is a device that converts electrical energy into mechanical energy to perform work.

    • Motors are commonly used in various applications such as electric vehicles, industrial machinery, and household appliances.

    • They come in different types such as AC motors, DC motors, and stepper motors.

    • Motor capacity refers to its power rating, typically measured in horsepower (HP) or kilowatts (kW).

    • Higher capacity motors can gene...

  • Answered by AI
  • Q2. Moter is a mechanical part which convert electrical energy in to mechanical energy
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Regarding to my previous job
  • Q2. Regarding LT panel and HT panel, motors and maintenance.
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is ATS, transformer maintenance procedure, protection of transformer, maintenance procedure of motor, protection of motor, knowledge about SAP
  • Ans. 

    ATS stands for Automatic Transfer Switch. It is used to transfer power supply between two sources. Transformer and motor maintenance procedures and protection methods are essential for their efficient operation. SAP is a software used for enterprise resource planning.

    • ATS is used to automatically switch power supply between two sources, ensuring uninterrupted power supply.

    • Transformer maintenance involves regular inspect...

  • Answered by AI
  • Q2. Knowledge about DG set, and spare material
  • Q3. Rating of HT motor and FLC of HT motor
  • Ans. 

    HT motor rating is the maximum power it can handle and FLC is the current it draws at full load.

    • HT motor rating is expressed in kilowatts (kW) or megawatts (MW).

    • FLC of HT motor is the full load current it draws at rated voltage and frequency.

    • FLC is expressed in amperes (A) and varies depending on the motor's power rating and efficiency.

    • For example, a 1 MW HT motor may have a FLC of 1000 A at 11 kV.

    • The rating and FLC of...

  • Answered by AI
  • Q4. Plant EHT system and single line diagram of plants.
  • Ans. 

    Plant EHT system and single line diagram of plants.

    • EHT system refers to Extra High Tension system used in power plants

    • Single line diagram shows the electrical connections between different components

    • It is important to have a clear and accurate diagram for safety and maintenance purposes

  • Answered by AI
  • Q5. Knowledge about HT and LT breaker.

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of electrical engineer, standard of electrical

Skills evaluated in this interview

I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Control wiring for ACB and VCB?
  • Ans. 

    Control wiring for ACB and VCB involves connecting control circuits to the breaker for proper operation.

    • Control wiring connects the breaker control circuits to the control panel.

    • The wiring should be properly sized and insulated.

    • The wiring should be color-coded for easy identification.

    • The wiring should be tested for proper operation before energizing the breaker.

    • Examples of control circuits include trip coil, close coil

  • Answered by AI
  • Q2. How to read right control wiring
  • Ans. 

    Control wiring is read by understanding the symbols and connections on the diagram.

    • Identify the power source and the load

    • Understand the symbols used for switches, relays, and other components

    • Follow the connections and determine the control logic

    • Check for any safety interlocks or emergency stops

    • Verify the wiring matches the diagram

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be practice. And general work

Nippon Koei India Interview FAQs

How many rounds are there in Nippon Koei India Inspection Engineer interview?
Nippon Koei India interview process usually has 2 rounds. The most common rounds in the Nippon Koei India interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Nippon Koei India Inspection Engineer interview?

Some of the top questions asked at the Nippon Koei India Inspection Engineer interview -

  1. What is full process of Diaphragm wall constructi...read more
  2. What is difference between Top bottom construction and Bottom Top constructi...read more

Tell us how to improve this page.

Nippon Koei India Inspection Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 735 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
AECOM Interview Questions
4.2
 • 113 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
WSP Interview Questions
4.2
 • 89 Interviews
View all

Nippon Koei India Inspection Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

4.0

Salary

3.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
95 salaries
unlock blur

₹7.5 L/yr - ₹17 L/yr

Senior Engineer
73 salaries
unlock blur

₹5.3 L/yr - ₹11.2 L/yr

Deputy Manager
39 salaries
unlock blur

₹9.5 L/yr - ₹18 L/yr

Manager
23 salaries
unlock blur

₹13 L/yr - ₹22 L/yr

Assistant General Manager
21 salaries
unlock blur

₹25 L/yr - ₹47 L/yr

Explore more salaries
Compare Nippon Koei India with

AECOM

4.2
Compare

Jacobs Engineering Group

4.1
Compare

TCE

3.8
Compare

WSP

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview