I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Salary Expectation
  • Q2. How soon you can join
  • Q3. Able to relocate
  • Ans. 

    Yes, I am willing to relocate for the right opportunity.

    • I am open to relocating for a better career prospect

    • I have relocated in the past for job opportunities

    • I am flexible and willing to move for the right role

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answer the Interviewer with to the point

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. General accounting and tax related questions

Interview Preparation Tips

Topics to prepare for Kalpataru Projects International Deputy Manager interview:
  • Key Accounts
Interview preparation tips for other job seekers - Be confident and lead the interviewer they will see how confident you are
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Discussed about experience, discussed about technical and professional skills

Round 3 - Aptitude Test 

Good attitude and best interview procedure

Interview Preparation Tips

Interview preparation tips for other job seekers - Always feel comfortable while facing the interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Related to project life cycle and how to manage in intermediate levels
  • Q2. Regarding planning and programming procedures
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding methodology of works handled
  • Q2. Regarding work responsibilities performed
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

On subject matter related to legal compliance.

Round 2 - HR 

(1 Question)

  • Q1. Location preferences, salary negotiations and grade and structure
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Related department work
  • Q2. Store related, record, manage, handle,
Round 3 - One-on-one 

(1 Question)

  • Q1. Related departments knowledge about store record manage handle

Interview Preparation Tips

Interview preparation tips for other job seekers - 100% assured job, one month noticed, leave available, job satisfaction
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How can we receive Materials to store and what is the basic procedure
  • Ans. 

    Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.

    • Materials can be received through purchase orders placed with suppliers.

    • Deliveries can be made directly to the storage location or to a designated receiving area.

    • Materials can also be received through transfers from other departments or locations.

    • The bas...

  • Answered by AI
  • Q2. Procedure of client material receipt/BOQ Items
  • Ans. 

    Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.

    • Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.

    • Document all received items in a log or system for tracking purposes.

    • Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.

    • Report any issues or discrepancies to the relevant stakeholders for resolution...

  • Answered by AI

I applied via Campus Placement and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Normal behaviourial questions such as tell me about yourself,and about my study related questions like what is your fav subject,etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and keep ur ans perfect with practice and keep a good eye contact and smile with your interviewer.

I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Gst Questions, Audit exposure, Past Experience and personal skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give your best and brief as told by interviewer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General questions like time speed distance, clocks, seating arrangement, probability etc.

Round 3 - Group Discussion 

Very generic topic as earlier it was for a site engineer post.

Round 4 - One-on-one 

(4 Questions)

  • Q1. What are the types of failure in roads, what are the different types of Contracts, and what is the FIDIC red book, and silver book? what does critical path mean?
  • Ans. 

    Types of road failures, types of contracts, FIDIC red book and silver book, critical path definition

    • Types of road failures include rutting, cracking, potholes, and edge cracking

    • Types of contracts in construction projects include lump sum contracts, cost plus contracts, and unit price contracts

    • FIDIC red book is a standard form of contract for construction, and FIDIC silver book is for turnkey projects

    • Critical path is th...

  • Answered by AI
  • Q2. What does the workability of concrete mean? How will you measure the slump value of M30 concrete? What does bar bending schedule means?
  • Ans. 

    Workability of concrete refers to its ease of placement and compaction. Slump value of M30 concrete is measured using a slump cone. Bar bending schedule is a document detailing the reinforcement steel bars in a structure.

    • Workability of concrete refers to how easily it can be mixed, placed, and compacted.

    • Slump value of M30 concrete is measured using a slump cone test, where the concrete is placed in the cone and then th...

  • Answered by AI
  • Q3. What can be done to remove any voids between any aggregate while concreting?
  • Ans. 

    To remove voids between aggregates while concreting, proper compaction techniques should be used.

    • Use vibrating equipment to settle the concrete and remove air voids

    • Ensure proper grading and mix design to minimize voids

    • Use additives like superplasticizers to improve workability and reduce voids

    • Properly consolidate the concrete by using appropriate techniques such as rodding or tamping

  • Answered by AI
  • Q4. Where do you think of yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - If someone is preparing for a site engineer post then it will be very generic such as what is bar bending schedule, how will you make BBS for like say beam, column shear wall, pre cast segment, pier, pile cap, pier head

Punj Lloyd Interview FAQs

How many rounds are there in Punj Lloyd Document Controller interview?
Punj Lloyd interview process usually has 1 rounds. The most common rounds in the Punj Lloyd interview process are HR.

Tell us how to improve this page.

Punj Lloyd Document Controller Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Punj Lloyd Document Controller Salary
based on 6 salaries
₹3.1 L/yr - ₹4 L/yr
37% less than the average Document Controller Salary in India
View more details

Punj Lloyd Document Controller Reviews and Ratings

based on 9 reviews

4.7/5

Rating in categories

4.5

Skill development

4.4

Work-life balance

4.4

Salary

4.3

Job security

4.6

Company culture

4.4

Promotions

4.5

Work satisfaction

Explore 9 Reviews and Ratings
Deputy Manager
43 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Manager
36 salaries
unlock blur

₹8 L/yr - ₹18.8 L/yr

Senior Engineer
33 salaries
unlock blur

₹3.8 L/yr - ₹10 L/yr

QA QC Engineer
33 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Engineer
29 salaries
unlock blur

₹2.2 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Punj Lloyd with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview