Filter interviews by
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for a better career prospect
I have relocated in the past for job opportunities
I am flexible and willing to move for the right role
Top trending discussions
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I was interviewed before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
I applied via Campus Placement
Simple aptitude questions and logical reasoning
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
The acceptable tolerance in % value during receipts depends on the company's policies and industry standards.
The acceptable tolerance in % value during receipts can vary depending on the nature of the business.
Some companies may have a strict tolerance limit of 1-2% to ensure accuracy in financial records.
Other industries, such as retail, may have a higher tolerance limit of 5-10% due to factors like pricing errors or ...
Acceptable tolerance refers to the maximum deviation allowed from a desired value or standard.
Acceptable tolerance is a measure of how much variation is considered acceptable in a particular context.
It is often used in quality control to determine if a product or process meets the required standards.
For example, if the acceptable tolerance for a weight measurement is 0.5%, a weight of 100 grams can vary by up to 0.5 gr...
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Deputy Manager
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
37
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
Simplex Infrastructures