Upload Button Icon Add office photos

Filter interviews by

Arabian Construction Company Executive Engineer Interview Questions and Answers

Updated 8 Dec 2024

Arabian Construction Company Executive Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about something you.
  • Q2. Salary expectations about current
Round 2 - Technical 

(3 Questions)

  • Q1. Mivan shuttering cycle process
  • Q2. Bar bending shedule
  • Q3. About site and general material density test. Quality testing of cement, sand, steel
Round 3 - HR 

(1 Question)

  • Q1. HR will call you within 2 days

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About technical question abot francis turbine and all welding works related fabrication works..
  • Ans. I have worked in around 2 yrs. in francis turbine almost 70-80 percent of francis turbine errection and alignment was learned.. and drawing study also.. good about the turbine.. and also all general and regular fabrication works also known.. penstock liner fab. with 7.5 dia pipe line fab. and errection. skills.. also i have..
  • Answered by Sai Kumar
Round 3 - HR 

(2 Questions)

  • Q1. What was ur past experiencee
  • Ans. 2 years.. and more than two years
  • Answered by Sai Kumar
  • Q2. What was ur qualification?
  • Ans. Diploma and completing b tech with same at a time parallel to the experience..
  • Answered by Sai Kumar

Interview Preparation Tips

Interview preparation tips for other job seekers - meil is best opportunity to the beginners.. best management.. salary also good..

I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. Tell me about your skills
  • Q3. Some aptitude test questions about civil work
Round 2 - Technical 

(2 Questions)

  • Q1. Technical questions about civil work
  • Q2. Ask about your expertise
Round 3 - One-on-one 

(1 Question)

  • Q1. About salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for technically strong interview . Good knowledge about civil work.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Mechanical & Electrical basics , your work experience in deep question's

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with u r core language
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pressure parts:- what is the secondary SH
  • Ans. 

    Secondary SH refers to the secondary superheater in a boiler's pressure parts.

    • Secondary SH is a component of a boiler's pressure parts that further heats steam to increase its temperature and energy.

    • It is located after the primary superheater and before the reheater.

    • The purpose of the secondary SH is to increase the efficiency of the boiler by maximizing the energy output of the steam.

    • Examples of boilers that use secon...

  • Answered by AI
  • Q2. What is the role of your in company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be fluent in every answers..
Show your good soft skills

I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why do want to join this organization?
  • Q2. Explain sunken, terrace n podium waterproof technique
  • Ans. 

    Sunken, terrace, and podium waterproofing techniques are used to prevent water penetration in below-grade structures.

    • Sunken waterproofing involves creating a depression in the ground and applying waterproofing materials to the walls and floor.

    • Terrace waterproofing involves applying waterproofing materials to the surface of a terrace or balcony to prevent water penetration.

    • Podium waterproofing involves applying waterpro...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with confidence. They will watch how u respond to the questions. Learn basic of construction n waterproof technology. Good luck 👍🏻
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

What is Mechanical advantage of lever

Round 3 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Q2. Tell about projects that your worked with previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well about your project and previous experience

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Aptitude Test 
Round 3 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice experience held with me and shahpoorji group while interviewing btw us

Interview Questionnaire 

1 Question

  • Q1. Do you know bbs
  • Ans. 

    Yes, BBS stands for Bar Bending Schedule which is a document that provides details of reinforcement steel required for construction.

    • BBS is used in construction to ensure the reinforcement steel is placed correctly.

    • It includes details such as the diameter and length of each steel bar.

    • BBS is important for ensuring the structural integrity and safety of a building.

    • Software programs are available to assist with creating BB...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Impress with your knowledge and experience that's all...speak truth is enough

Interview Questionnaire 

1 Question

  • Q1. Dia of Tunnel, Powder factor, Total length, Used of Grade in Shotcrete & Gantry, Cycle time, Excavation area, About rock bolt installing & grouting, Rock class & supporting sydtem, what is natm technology....
  • Ans. 

    The interview question is about various aspects of tunnel execution engineering.

    • Tunnel diameter is a crucial factor in determining the excavation area and the type of equipment to be used.

    • Powder factor is the amount of explosive used per unit volume of rock. It affects the fragmentation of the rock and the safety of the workers.

    • Total length of the tunnel is an important parameter in planning the excavation sequence and...

  • Answered by AI

Arabian Construction Company Interview FAQs

How many rounds are there in Arabian Construction Company Executive Engineer interview?
Arabian Construction Company interview process usually has 3 rounds. The most common rounds in the Arabian Construction Company interview process are HR and Technical.
What are the top questions asked in Arabian Construction Company Executive Engineer interview?

Some of the top questions asked at the Arabian Construction Company Executive Engineer interview -

  1. About site and general material density test. Quality testing of cement, sand, ...read more
  2. Tell me about something y...read more
  3. HR will call you within 2 d...read more

Tell us how to improve this page.

Arabian Construction Company Executive Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
Tata Technologies Interview Questions
3.6
 • 258 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
View all
Arabian Construction Company Executive Engineer Salary
based on 5 salaries
₹2.6 L/yr - ₹7 L/yr
18% less than the average Executive Engineer Salary in India
View more details

Arabian Construction Company Executive Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

5.0

Skill development

2.0

Work-life balance

3.0

Salary

4.0

Job security

3.0

Company culture

4.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
27 salaries
unlock blur

₹4.4 L/yr - ₹9.8 L/yr

Civil Engineer
23 salaries
unlock blur

₹3.2 L/yr - ₹5.8 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.5 L/yr - ₹3.8 L/yr

Senior Civil Engineer
17 salaries
unlock blur

₹4.8 L/yr - ₹8.4 L/yr

Civil Site Engineer
17 salaries
unlock blur

₹1.5 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Arabian Construction Company with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview