i
H.G. Infra Engineering
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via LinkedIn and was interviewed in Dec 2023. There were 2 interview rounds.
An engine works by converting fuel into mechanical energy through combustion.
Fuel is mixed with air and ignited in the combustion chamber
The resulting explosion pushes pistons up and down
Pistons are connected to a crankshaft, which converts the up and down motion into rotational motion
The rotational motion is then used to power the vehicle or machinery
The gear ratio between the crankshaft and camshaft determines the timing of valve opening and closing in an engine.
The gear ratio is typically determined by the number of teeth on the gears connected to the crankshaft and camshaft.
A higher gear ratio means the camshaft will rotate faster than the crankshaft, resulting in different valve timing.
The gear ratio plays a crucial role in the performance and efficiency of an ...
There are various engine models used in excavators depending on the manufacturer and size of the machine.
Different excavator manufacturers use different engine models such as Caterpillar, Komatsu, Volvo, and Hitachi.
Engine models can vary based on the size and power requirements of the excavator.
Common engine models used in excavators include Caterpillar C-Series, Komatsu SAA6D107E, Volvo D6H, and Hitachi Hino J05E.
The fuel consumption of a 1800-3 asphalt paver can vary depending on factors such as operating conditions and maintenance.
Fuel consumption can be affected by the type of work being done (e.g. paving a new road vs. resurfacing an existing road)
Proper maintenance of the paver, such as regular engine tune-ups and clean air filters, can help improve fuel efficiency
Monitoring fuel usage and adjusting operating practices, su...
The fuel consumption of a 500 kVA DG set depends on various factors such as load, efficiency, and type of fuel used.
Fuel consumption of a 500 kVA DG set can range from 130-150 liters per hour depending on the load and efficiency.
Factors such as the type of fuel used (diesel, natural gas, etc.) can also impact fuel consumption.
Regular maintenance and tuning of the DG set can help optimize fuel consumption and efficiency
H3N plant productivity can be improved through efficient resource allocation and process optimization.
Implementing lean manufacturing principles to reduce waste and improve efficiency
Investing in automation technology to streamline production processes
Regularly monitoring and analyzing key performance indicators to identify areas for improvement
Providing training and development opportunities for employees to enhance s
The parts of an H3N plant include reactors, distillation columns, heat exchangers, pumps, valves, and control systems.
Reactors
Distillation columns
Heat exchangers
Pumps
Valves
Control systems
Maintenance cost of equipment is a crucial factor in ensuring efficient operations and minimizing downtime.
Regular maintenance schedules can help prevent costly breakdowns and extend the lifespan of equipment.
Investing in high-quality equipment upfront can reduce long-term maintenance costs.
Tracking maintenance expenses and analyzing trends can help identify areas for improvement and cost-saving opportunities.
The main cause of insulation in asphalt paver is typically due to a buildup of material on the screed plate.
Buildup of material on the screed plate can cause insulation in asphalt paver
Improper maintenance and cleaning of the paver can lead to insulation issues
Incorrect adjustment of the screed plate can also contribute to insulation problems
Scheduled maintenance of equipments is crucial for ensuring optimal performance and longevity.
Regularly inspect and clean equipment to prevent breakdowns
Follow manufacturer's recommended maintenance schedule
Keep detailed records of maintenance activities
Train staff on proper maintenance procedures
Address any issues promptly to avoid costly repairs
The productivity of a grader can be measured by the amount of work completed in a given time period.
Productivity can be measured by the number of products graded per hour or per day.
Efficiency of the grader in completing tasks accurately and timely is also important.
Utilization of resources such as manpower and machinery can impact productivity.
Continuous improvement strategies can help increase the productivity of the
The productivity of an excavator can be measured by factors such as fuel efficiency, cycle time, and maintenance costs.
Fuel efficiency: Ensure the excavator is properly maintained and operated to maximize fuel efficiency.
Cycle time: Optimize the workflow and minimize idle time to increase productivity.
Maintenance costs: Regular maintenance and timely repairs can help reduce downtime and increase productivity.
Utilizatio...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 24 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
REACH compliance material refers to substances that comply with the European Union's REACH regulation.
REACH stands for Registration, Evaluation, Authorization, and Restriction of Chemicals.
REACH compliance material refers to substances that have been registered with the European Chemicals Agency (ECHA) and meet the requirements of the REACH regulation.
These substances are considered safe for use in the European Union.
E...
posted on 21 Jun 2024
posted on 15 Aug 2024
Being customer oriented means focusing on delivering results that meet the needs and expectations of the customer.
Understanding the needs and preferences of customers
Providing excellent customer service
Ensuring customer satisfaction and loyalty
Adapting products or services to meet customer demands
Seeking feedback and implementing improvements based on customer input
posted on 29 Oct 2024
I applied via Indeed and was interviewed in Apr 2024. There were 4 interview rounds.
posted on 5 Mar 2025
I appeared for an interview before Mar 2024.
Aptitude questions were asked
I am familiar with various manufacturing processes including machining, molding, and assembly techniques.
Machining: Processes like turning and milling used to shape materials, e.g., CNC machining for precision parts.
Molding: Techniques such as injection molding for plastics, commonly used in consumer products.
Assembly: Methods like lean manufacturing to optimize assembly lines, e.g., automotive assembly.
Additive Manufa...
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
134
salaries
| ₹4.2 L/yr - ₹13.2 L/yr |
Senior Engineer
90
salaries
| ₹4.1 L/yr - ₹9.8 L/yr |
Assistant Engineer
78
salaries
| ₹2.9 L/yr - ₹4.6 L/yr |
Engineer
73
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Structural Engineer
66
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon