Q1. How to calculate weight of steel
Weight of steel can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel (length x width x height)
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight
Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg
Q2. How to calculate number of tiles
Number of tiles can be calculated by determining the area to be covered and the size of each tile.
Calculate the total area to be covered by multiplying the length and width of the space.
Determine the size of each tile in square units.
Divide the total area by the size of each tile to get the number of tiles needed.
Consider adding extra tiles for cuts and wastage.
For example, if a room is 10 feet by 12 feet and each tile is 1 square foot, you would need 120 tiles.
Q3. Is code for method of measurement
Code for method of measurement is a standardized set of rules and guidelines used to quantify and evaluate the work done in a construction project.
Codes for method of measurement provide a uniform and consistent way to measure quantities in construction projects.
They help in accurately estimating costs, monitoring progress, and resolving disputes.
Examples include CESMM (Civil Engineering Standard Method of Measurement) and SMM7 (Standard Method of Measurement of Building Work...read more
Q4. What is critical path
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the shortest possible duration for completing the project.
Any delay in tasks on the critical path will directly impact the project's overall timeline.
Activities on the critical path have zero slack or float.
Example: In a construction project, ta...read more
Q5. Role of planning engineer
Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.
Develop project schedules using software like Primavera P6
Monitor project progress and identify potential delays
Coordinate with various teams to ensure timely completion
Prepare reports on project status and communicate with stakeholders
Implement changes to the schedule as needed to keep the project on track
Q6. Density of steel
Density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel is approximately 7.85 g/cm^3.
Different types of steel may have slightly different densities.
Interview Process at Concentrix Corporation
Top Planning Engineer Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month