Waterproofing procedure involves surface preparation, application of waterproofing material and quality control measures.
Surface preparation involves cleaning and repairing the surface to be waterproofed.
Waterproofing material can be applied using various methods such as spraying, brushing or rolling.
Quality control measures include checking for leaks and ensuring proper curing of the waterproofing material.
Different t...
Vitrified tiles are of two types - soluble salt and double charge.
Soluble salt vitrified tiles have a pattern that is printed on the surface of the tile and then coated with a layer of liquid glass.
Double charge vitrified tiles have two layers of pigment that are baked together to create a pattern that goes all the way through the tile.
Other types of vitrified tiles include glazed vitrified tiles, full-body vitrified t
Top trending discussions
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
based on 1 review
Rating in categories
Project Engineer
30
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Project Manager
15
salaries
| ₹4.6 L/yr - ₹16.2 L/yr |
Senior Engineer
11
salaries
| ₹4.4 L/yr - ₹7 L/yr |
Assistant Project Manager
8
salaries
| ₹4.4 L/yr - ₹8.6 L/yr |
Safety Officer
7
salaries
| ₹3.6 L/yr - ₹5.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company