I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Specifications of material which used for building construction?
  • Ans. 

    Materials used in building construction include concrete, steel, wood, brick, and stone.

    • Concrete is used for foundations, walls, and floors.

    • Steel is used for structural support and framing.

    • Wood is used for framing, flooring, and finishing.

    • Brick is used for walls and facades.

    • Stone is used for walls, flooring, and decorative features.

  • Answered by AI
  • Q2. What is difference in execution and work planning?
  • Ans. 

    Execution is the implementation of work planning. Work planning is the process of creating a plan to achieve a goal.

    • Execution involves carrying out the tasks outlined in the work plan

    • Work planning involves identifying the steps needed to achieve a goal

    • Execution requires following the timeline and budget set in the work plan

    • Work planning involves considering resources, constraints, and potential obstacles

    • Example: Work p...

  • Answered by AI
  • Q3. What MS stucture rate per 1 SQM?
  • Ans. 

    The MS structure rate per 1 SQM varies depending on the type of structure and location.

    • The rate can range from $50 to $200 per SQM.

    • Factors that affect the rate include the type of material used, labor costs, and location.

    • For example, the rate for a steel structure in a rural area may be lower than that of a concrete structure in a city.

    • It is important to get a detailed quote from a contractor before starting any constr

  • Answered by AI
  • Q4. What is rate analysis ?
  • Ans. 

    Rate analysis is the process of determining the rates of various items of work in a construction project.

    • It involves breaking down the cost of a project into individual components.

    • It helps in estimating the cost of a project accurately.

    • It takes into account factors such as materials, labor, equipment, and overhead costs.

    • For example, rate analysis can be used to determine the cost of laying a foundation, including the c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be perfect with latest software as auto cad ,cad 3d , MSP ,Primavera, PMP also try learn to total station,
Be perpair for execution with solid Planning and check it prectcal on the site.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Basic Accounting rectification entries, Basic Code based reasoning, and directional questions

Round 2 - Technical 

(4 Questions)

  • Q1. Mutual Fund and hedging
  • Q2. Why do you want to switch
  • Q3. Why you want to work at NAV
  • Q4. Basic Numerical question of NAV Calculation
Round 3 - HR 

(2 Questions)

  • Q1. Which profile you want to choose
  • Q2. Salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be Confident and prepared
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell us about your cv
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. IFRS indas gst such questions
Round 2 - HR 

(1 Question)

  • Q1. Okay hr round to proceed

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself?
  • Q2. What is your expectations from this Job?
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about past projects? What you have achieved through this?
  • Q2. Current Job role related questions like do you about ISO 9001, ISO 14001 & Social Compliance?

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. The HR is none other than the owner itself. He will first degrade you then will self praise and then story tale as other organisation.
  • Q2. HR no role itself
  • Q3. The Interview was good, in terms of the knowledge testing. The only big problem is they portray them as an MNC but they are a just Indian audit firm. There is no hierarchy any body can be we your manager, ...

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are CA fresher or out of an CA firm this is good place as here pay will be high when compared to other Indian companies, but if looking to build Carreer do not opt for this place.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Team handling, training to new staff
  • Q2. Budget, target work

Interview Preparation Tips

Interview preparation tips for other job seekers - for beginners it is ok.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Difference between trade discount and cash discounts.
  • Ans. 

    Trade discount is given by the seller to the buyer at the time of purchase, while cash discount is given for prompt payment.

    • Trade discount is a reduction in the list price of the goods offered by the seller to the buyer.

    • Cash discount is a discount offered by the seller to the buyer for making prompt payment.

    • Trade discount is given at the time of purchase, while cash discount is given after the purchase is made.

    • Trade di...

  • Answered by AI
  • Q2. Tax questions on tp audit .

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare audit questions.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Why would you go for audit profir
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Experience in Audit field
  • Ans. 

    I have 5 years of experience in the audit field, conducting financial audits for various clients.

    • Performed financial audits for clients in different industries

    • Analyzed financial statements and identified discrepancies

    • Prepared audit reports and communicated findings to clients

    • Collaborated with team members to ensure audit deadlines were met

  • Answered by AI
  • Q2. Why did you choose ca

Interview Preparation Tips

Interview preparation tips for other job seekers - Know theory well

Fidesto Projects Interview FAQs

How many rounds are there in Fidesto Projects Assistant Manager interview?
Fidesto Projects interview process usually has 2 rounds. The most common rounds in the Fidesto Projects interview process are Resume Shortlist and Technical.
What are the top questions asked in Fidesto Projects Assistant Manager interview?

Some of the top questions asked at the Fidesto Projects Assistant Manager interview -

  1. Specifications of material which used for building constructi...read more
  2. What is difference in execution and work planni...read more
  3. What MS stucture rate per 1 S...read more

Tell us how to improve this page.

Fidesto Projects Assistant Manager Salary
based on 7 salaries
₹5.4 L/yr - ₹7 L/yr
26% less than the average Assistant Manager Salary in India
View more details

Fidesto Projects Assistant Manager Reviews and Ratings

based on 3 reviews

3.9/5

Rating in categories

4.8

Skill development

3.0

Work-life balance

3.9

Salary

4.8

Job security

3.9

Company culture

3.1

Promotions

3.8

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
30 salaries
unlock blur

₹2.5 L/yr - ₹4.2 L/yr

Project Manager
18 salaries
unlock blur

₹8 L/yr - ₹14 L/yr

Senior Engineer
10 salaries
unlock blur

₹4.4 L/yr - ₹6 L/yr

Assistant Manager
7 salaries
unlock blur

₹5.4 L/yr - ₹7 L/yr

Safety Officer
7 salaries
unlock blur

₹3.6 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Fidesto Projects with

RSM India

3.3
Compare

Ryan

4.0
Compare

NAV Backoffice

3.3
Compare

Bluechip Corporate Investment Centre

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview