I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
Top trending discussions
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
posted on 7 Feb 2022
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
18
salaries
| ₹9.4 L/yr - ₹16 L/yr |
Civil Site Engineer
17
salaries
| ₹3 L/yr - ₹6.6 L/yr |
QA QC Engineer
15
salaries
| ₹3 L/yr - ₹8 L/yr |
Electrical Engineer
13
salaries
| ₹3.9 L/yr - ₹9 L/yr |
Assistant Construction Manager
12
salaries
| ₹11.1 L/yr - ₹15 L/yr |
Larsen & Toubro Limited
Tata Group
Hindustan Construction Company
GAMMON INDIA